USPTO serial 85488400
STORK TECHNICAL SERVICES
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Dec 3, 2013
- Examiner
- FAIRBANKS, RONALD L
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with STORK TECHNICAL SERVICES?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Stork Intellectual Property B.V.
Naarden, NL
Stork Intellectual Property B.V.
Naarden, NL
Stork Intellectual Property B.V.
Naarden, NL
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Lawrence E. Abelman
LAWRENCE E. ABELMAN ABELMAN, FRAYNE & SCHWAB666 3RD AVEFL 10NEW YORK, NY 10017-4046Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines, not included in other classes, for industrial purposes, namely, industrial machines for treating liquids and gasses; industrial machines for generating electric power; and machine tools, namely, tools for machining in the nature of metalworking machining centers; valves of metal parts of machines; hydraulic and mechanical propulsion mechanisms except for land vehicles, namely, propulsion mechanisms for ships in the nature of boat engines and motors for boats, pneumatic blowers; hydraulic tools being hydraulically powered tools, namely, hydraulic hammers, hydraulic excavators; pumps being parts of oilfield wellhead machines, namely, industrial pumps for pumping liquids and gasses; elevating apparatus, namely, hoists, hoisting cranes and elevating or lifting work platforms; compressed air tools being tools powered by compressed air, namely, sanders, polishers, routers, jigsaws, circular saws, chain saws, drilling machines, screwdrivers, milling machines, grinders; compressor machines; pump compressor installations for oil or gas; non-electric welding apparatus, namely, gas welding machines; welding machines, namely, gas welding machines, electric welding machines, and welding torches; drive chains being parts of machines; electric motors and internal combustion engines other than for land vehicles; generators, namely, electric generators and fuel or gas operated power generators; parts of engines and turbines for land vehicles; cog wheel boxes and cog wheel reduction boxes being parts of machines; machine couplings; turbines except for land vehicles; installations for generating energy, namely, electric generators and fuel or gas operated power generators; machines for treating hydrocarbons, oil and gas and other chemical products; parts not included in other classes of the aforesaid goods | SECTION 8 - CANCELLED | — |
| 011 | Boilers, namely, industrial boilers, boilers for generating steam, boilers for heating installations, heating boilers, and electrical boilers; processing furnaces; water-supply apparatus, namely, drinking water supply apparatus, namely, drinking fountains and water filters, industrial boiler water supply apparatus, namely, pipes for heating boilers and metered valves, and water de-aerating apparatus; installations for heating water; water purification installations; industrial installations for refining oil; installations for recovering water, namely, separators for use in ventilation systems and air-conditioning installations for use in recovering water, and dehumidifiers for recovering water; installations for liquefying gases, hydrocarbon gasses, natural gas, and air; installations for cooling gasses to liquids; industrial installations for drinking water production, namely, industrial water purifying apparatus; air conditioning systems; refrigeration systems comprising refrigerating machines and installations; cold water makers, namely, water coolers; electric autoclaves; industrial autoclaves, namely, electrically heated autoclaves and gas-fired autoclaves with integrated heat exchanger; condensing apparatus, namely, apparatus for condensing gasses; filters for gasses, namely, air, and for liquids, namely, water or oil, being parts of household or industrial installations; pressure vessels, namely, hot water heaters, industrial water deaerator vessels and industrial boilers; nuclear reactors; solar panels for heating; parts not included in other classes of the aforesaid goods | SECTION 8 - CANCELLED | — |
| 037 | Building construction; repair of machines, apparatus and technical installations; maintenance of machines, apparatus and technical installations; installation services of machines, apparatus and technical installations; construction of machines and apparatus; construction and maintenance of roads and waterways; construction and maintenance of industrial installations and chemical and petrochemical installations; construction and installation of aerials, glass fiber networks, mobile telephone networks, central aerial systems, data communication installations, electric and electrotechnical installations and cable networks; construction and installation of signboards, information boards, shipping signs, mobile text boards, traffic control installations and structures therefor; installation of road signs, including mobile signs; construction and installation of platform lighting; construction and installation of railways and of infrastructure therefor; tunnel construction; bridge building; construction, adaptation, maintenance and repair of ships; construction, adaptation, maintenance and repair of buses, trams, trucks, trailers and other land vehicles and prototypes thereof; construction and installation of lightening safety installations; construction and installation of gas pipes, water conduits and high pressure conduits; construction and installation of electricity installations; construction and installation of solar energy systems; construction and installation of locks, dams and other maritime installations; construction and installation of lighting installations; construction and installation of air conditioning installations; construction and installation of refrigeration installations; construction and installation of security installations; construction and installation of fire safety installations; construction and installation of sprinkler installations; construction and installation of chemical, petrochemical and pharmaceutical factories; construction and installation of ventilation installations; construction and installation of heat technology installations; construction and installation of power stations. construction and installation of anti-burglary installations; construction of broadcasting installations; construction information; applying top coats with the aid of thermal spray processes; laying cables; repairing concrete; construction and installation of installations for extracting and processing gases and oils; gas and oil pipeline construction and maintenance; construction and adaptation of cranes and elevating installations; construction and installation of industrial installations for fuel production; construction and installation of nuclear power stations; maintenance, renovation, overhaul and repair of machines, engines and motors and parts thereof; building machine and industrial machine rental for the building trade; assembling parts of machines to make machines; cleaning services; sound insulation; boring of materials; repair consultancy; consultancy on the repair of building damage; construction planning; Alignment of pipework, laying out and maintenance of pipes | SECTION 8 - CANCELLED | — |
| 042 | Design and development of industrial installations; technical feasibility studies; engineering, chemistry, physics and geology services, including consultancy; chemical laboratory services; chemical analyses; drawing up of expert reports by engineers or laboratory technicians; technical research in the field of welding, physics and energy; building research; architectural consultancy; inspections of seals and valves; scientific and technical research in the field of acoustics; scientific and technical research into the condition of materials; product endurance testing; endoscopic and optical research, except endoscopic and optical research for medical purposes; material testing, including stress tests, tear-resistancy tests, remaining life expectancy determination and vibration testing; physics research; leakage testing; testing of machines and tools; determining the properties of materials; research of the structural integrity of industrial installations; fatigue research of products and materials; testing of products in falls; ultrasound testing; metals testing; technical investigation of damage, including building damage; mechanical research and research into metals; microscopic research; salt spray testing; determining asbestos levels; automation services, namely, consulting services in the field of automation of technical installations; computer programming; technical calculations; technical analysis of industrial installations; testing of concrete; technical advice concerning computer security measures; building inspections for the existence of damage, deterioration, decay or mold; building consultancy for the prevention of building damage; building research, namely, research on building construction or city planning; technical advice regarding compliance with the legal requirements for obtaining building permissions; designing industrial installations; designing moulds and stamps; technical advice regarding industrial measures for environmental protection; cement testing; civil engineering inspections; calculating specifications for vehicles, cranes, hoisting cranes and elevating installations; designing and developing shock and vibration proof constructions; corrosion testing; ferrite measuring; hardness measuring; noise testing; studying of production processes in order to achieve technical optimization; hydraulic designing, calculations and simulations; disturbance analyses; drawing up environmental impact reports; oil and gas prospecting; analysis for oil field and gas field exploitation; checking gas and oil sources; design and development of telecommunications installations, including telephone kiosks, telephone masts and internet masts | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Stork Intellectual Property B.V.
- Other trademarks owned by Stork Intellectual Property B.V.
- Other trademarks owned by Stork Intellectual Property B.V.
- Other trademarks in Class 007
- Other trademarks in Class 011
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named STORK TECHNICAL SERVICES
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 10, 2020 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Dec 3, 2018 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Dec 3, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 17, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 17, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 28, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 9, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 3, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 2, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 2, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 2, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 30, 2013 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 30, 2013 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 30, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 8, 2013 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jun 24, 2013 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jun 7, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 7, 2013 | ALIE | ASSIGNED TO LIE | — |
| Jun 6, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 6, 2013 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 6, 2013 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jun 6, 2013 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jun 6, 2013 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Dec 6, 2012 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Dec 6, 2012 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 6, 2012 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 31, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 31, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 31, 2012 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Oct 23, 2012 | ALIE | ASSIGNED TO LIE | — |
| Oct 10, 2012 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Oct 9, 2012 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Oct 9, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 9, 2012 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 9, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 16, 2012 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 13, 2011 | MDSC | NOTICE OF DESIGN SEARCH CODE MAILED | — |
| Dec 12, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 9, 2011 | NWAP | NEW APPLICATION ENTERED | — |