USPTO serial 85508729
RTI INTERNATIONAL METALS, INC.
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- CHANG, KATHERINE S
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with RTI INTERNATIONAL METALS, INC.?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Joseph A. Sebolt
JOSEPH A. SEBOLT SAND & SEBOLT4940 Munson Street NWAegis Tower, Suite 1100Canton, OH 44718-3615Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Titanium and titanium alloys in the form of sheets, plates, bars, rods and other shapes for use in manufacturing; metal drilling materials, namely, titanium drill pipe, titanium alloy dynamic risers for transferring materials between the ground or the seafloor and production and drilling facilities, titanium alloy product tubulars, titanium taper stress joints, titanium coil tubing and titanium keel joints; metal catenary risers for attaching a pipeline to an oil production platform, metal top tensioned risers for transferring materials between the ground or the seafloor and production and drilling facilities, titanium stress joints, metal geothermal casing pipes, metal downhole tubing, titanium drill pipe, metal drilling risers for providing a temporary extension of an oil well to a drilling facility, metal completion risers for transferring materials between the ground or the seafloor and production and drilling facilities, metal work over risers for transferring materials between the ground or the seafloor and production and drilling facilities and metal intervention risers for transferring materials between the ground or the seafloor and production and drilling facilities, all directed to the oil and gas industry | ACTIVE | — |
| 035 | Distributorships in the field of titanium sheet, plate, ingot and billets; business management and consultation services provided to businesses in the metal industry and other related manufacturing fields | ACTIVE | — |
| 040 | Machining, welding, fabrication and assembly of metal for the oil and gas industry; fabrication, welding and machine assembly of parts manufactured primarily from soft and hard metals | ACTIVE | — |
| 042 | Engineering services provided to businesses in the metal industry and other related manufacturing fields; testing of metal for the oil and gas industry; testing of parts manufactured primarily from soft and hard metal | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by RTI INTERNATIONAL METALS, INC.
- Other trademarks owned by RTI INTERNATIONAL METALS, INC.
- Other trademarks in Class 006
- Other trademarks in Class 035
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named RTI INTERNATIONAL METALS, INC.
- Prosecution event MAB6 explained
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 23, 2015 | MAB6 | ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Nov 23, 2015 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Apr 28, 2015 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Apr 27, 2015 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Apr 21, 2015 | EXT5 | SOU EXTENSION 5 FILED | — |
| Apr 21, 2015 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Oct 16, 2014 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Oct 15, 2014 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Oct 14, 2014 | EXT4 | SOU EXTENSION 4 FILED | — |
| Oct 14, 2014 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 23, 2014 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Apr 22, 2014 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Apr 21, 2014 | EXT3 | SOU EXTENSION 3 FILED | — |
| Apr 21, 2014 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Nov 15, 2013 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Nov 14, 2013 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Nov 13, 2013 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Oct 14, 2013 | EXT2 | SOU EXTENSION 2 FILED | — |
| Oct 14, 2013 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 25, 2013 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Apr 23, 2013 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Apr 23, 2013 | EXT1 | SOU EXTENSION 1 FILED | — |
| Apr 23, 2013 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Oct 23, 2012 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Aug 28, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 28, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 8, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 21, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 18, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 18, 2012 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 18, 2012 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 18, 2012 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 18, 2012 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 17, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 16, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 16, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 16, 2012 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 13, 2012 | DMCC | DATA MODIFICATION COMPLETED | — |
| Apr 12, 2012 | CEPE | COMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION ENTERED | — |
| Apr 12, 2012 | ALIE | ASSIGNED TO LIE | — |
| Apr 12, 2012 | GEAN | NOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED | — |
| Apr 12, 2012 | GEAP | EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED | — |
| Apr 12, 2012 | CPEA | EXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED | — |
| Apr 9, 2012 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 11, 2012 | MDSC | NOTICE OF DESIGN SEARCH CODE MAILED | — |
| Jan 10, 2012 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 7, 2012 | NWAP | NEW APPLICATION ENTERED | — |