Drawing for RTI INTERNATIONAL METALS, INC.

USPTO serial 85541797

RTI INTERNATIONAL METALS, INC.

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
CHANG, KATHERINE S
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with RTI INTERNATIONAL METALS, INC.?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Joseph A. Sebolt

JOSEPH A. SEBOLT SAND & SEBOLT4940 Munson Street NWAegis Tower, Suite 1100Canton, OH 44718-3615

Goods and services

ClassDescriptionStatusFirst use
006Titanium and titanium alloys in the form of sheets, plates, bars, rods and other shapes for use in manufacturing; metal drilling materials, namely, titanium drill pipe, titanium alloy dynamic risers for transferring materials between the ground or the seafloor and production and drilling facilities, titanium alloy product tubulars, titanium taper stress joints, titanium coil tubing and titanium keel joints; metal catenary risers for attaching a pipeline to an oil production platform, metal top tensioned risers for transferring materials between the ground or the seafloor and production and drilling facilities, titanium stress joints, metal geothermal casing pipes, metal downhole tubing, titanium drill pipe, metal drilling risers for providing a temporary extension of an oil well to a drilling facility, metal completion risers for transferring materials between the ground or the seafloor and production and drilling facilities, metal work over risers for transferring materials between the ground or the seafloor and production and drilling facilities and metal intervention risers for transferring materials between the ground or the seafloor and production and drilling facilities, all directed to the oil and gas industryACTIVE—
035Distributorships in the field of titanium sheet, plate, ingot and billets; business management and consultation services provided to businesses in the metal industry and other related manufacturing fieldsACTIVE—
040Machining, welding, fabrication and assembly of metal for the oil and gas industry; fabrication, welding and machine assembly of parts manufactured primarily from soft and hard metalsACTIVE—
042Engineering services provided to businesses in the metal industry and other related manufacturing fields; testing of metal for the oil and gas industry; testing of parts manufactured primarily from soft and hard metalACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Nov 23, 2015MAB6ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Nov 23, 2015ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Apr 28, 2015EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Apr 26, 2015EX5GSOU EXTENSION 5 GRANTED—
Apr 21, 2015EXT5SOU EXTENSION 5 FILED—
Apr 21, 2015EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Oct 16, 2014EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Oct 15, 2014EX4GSOU EXTENSION 4 GRANTED—
Oct 14, 2014EXT4SOU EXTENSION 4 FILED—
Oct 14, 2014EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Apr 23, 2014EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Apr 22, 2014EX3GSOU EXTENSION 3 GRANTED—
Apr 21, 2014EXT3SOU EXTENSION 3 FILED—
Apr 21, 2014EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Nov 15, 2013EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Nov 14, 2013EX2GSOU EXTENSION 2 GRANTED—
Nov 13, 2013AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Oct 14, 2013EXT2SOU EXTENSION 2 FILED—
Oct 14, 2013EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Apr 25, 2013EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Apr 23, 2013EX1GSOU EXTENSION 1 GRANTED—
Apr 23, 2013EXT1SOU EXTENSION 1 FILED—
Apr 23, 2013EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Oct 23, 2012NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Aug 28, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 28, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 8, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 24, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 21, 2012ALIEASSIGNED TO LIE—
Jul 18, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 17, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 16, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 16, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 16, 2012TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 12, 2012CEPECOMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION ENTERED—
Apr 12, 2012ALIEASSIGNED TO LIE—
Apr 12, 2012GEANNOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Apr 12, 2012GEAPEXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Apr 12, 2012CPEAEXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED—
Apr 9, 2012DOCKASSIGNED TO EXAMINER—
Feb 22, 2012MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
Feb 21, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 20, 2012NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance