USPTO serial 85541924
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Maverick Technologies Holdings, LLC
Columbia, IL
Other trademarks owned by Maverick Technologies Holdings, LLC
Maverick Technologies Holdings, LLC
Columbia, IL
Other trademarks owned by Maverick Technologies Holdings, LLC
Maverick Technologies Holdings, LLC
Columbia, IL
Other trademarks owned by Maverick Technologies Holdings, LLC
| Class | Description | Status | First use |
|---|---|---|---|
| 042 | Engineering and engineering consulting services in the fields of information technology, automation, manufacturing, enterprise integration, EMI (enterprise manufacturing intelligence), EAI (enterprise application integration), and electronic business, namely, PLC (programmable logic controllers)/DCS (distributed control system) development and replacement; front-end engineering services; engineering project management; technological consulting services in the field of energy optimization, manufacturing plant documentation for operations, engineering, DCS (distributed control system)/HMI (human-machine interface) specification development and configuration; piping and instrumentation diagram development; piping and instrumentation design and development, process control functional description and specification development, detailed electrical instrumentation design, electrical instrument specification; medium-and low-voltage power distribution system design and implementation, hardwired safety interlock design, software safety interlock design, electrical heat trace design, electrical control cabinet construction, control cabinet design and layout, network design and layout, computer networking and system architecture design and implementation; Internet, intranet and extranet website design and development; custom database design and configuration; preparing engineering compliance reports; engineering consulting services, namely, technician calibration, outage services and planning, advanced process control solutions, demand planning, production planning and scheduling, logistics and distribution, manufacturing execution/production management, manufacturing intelligence, quality management, system health checks, product update monitoring, subsystem communication, system simulation; Remote monitoring in the field of industrial process controls systems, namely, PLC (programmable logic controllers), DCS (distributed control systems), and HMI (human machine interface) systems; Technical support services, namely, troubleshooting of industrial process control computer software problems; Maintenance of software used in PLC, DCS and HMI industrial process control systems; Providing engineering and engineering consulting services remotely in the fields of information technology, automation, manufacturing, and enterprise integration; remote computer network technical monitoring, software maintenance services, and data recovery services | SECTION 8 - CANCELLED | Sep 17, 2012 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 6, 2024 | NCS8 | NOTICE OF CANCELLATION SEC. 8 EMAILED | — |
| Jun 6, 2024 | C8.T | CANCELLED SEC. 8 (10-YR) | — |
| Nov 20, 2023 | PR89 | POST REGISTRATION ACTION MAILED - SEC. 8 & 9 | — |
| Nov 20, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| May 25, 2023 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Dec 25, 2021 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Feb 2, 2019 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Feb 2, 2019 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Jan 23, 2019 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Dec 20, 2018 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Dec 20, 2018 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Dec 25, 2017 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Dec 25, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 20, 2012 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Nov 19, 2012 | REGV | LAW OFFICE REGISTRATION REVIEW COMPLETED | — |
| Nov 19, 2012 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Oct 29, 2012 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Oct 29, 2012 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Oct 25, 2012 | IUAF | USE AMENDMENT FILED | — |
| Oct 25, 2012 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Sep 4, 2012 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jul 10, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 10, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 20, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 7, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 4, 2012 | ALIE | ASSIGNED TO LIE | — |
| May 15, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 25, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 24, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 24, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 31, 2012 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 31, 2012 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 31, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 26, 2012 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 22, 2012 | MPMK | NOTICE OF PSEUDO MARK MAILED | — |
| Feb 21, 2012 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |