Drawing for PLANTFLOOR24

USPTO serial 85541924

PLANTFLOOR24

Reviewed by CopyMark Law Group

Reg. 4265728Status 710
Filing date
Status date
Registration date
Dec 25, 2012
Examiner
FINE, STEVEN
Law office
Historical data usage

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with PLANTFLOOR24?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
042Engineering and engineering consulting services in the fields of information technology, automation, manufacturing, enterprise integration, EMI (enterprise manufacturing intelligence), EAI (enterprise application integration), and electronic business, namely, PLC (programmable logic controllers)/DCS (distributed control system) development and replacement; front-end engineering services; engineering project management; technological consulting services in the field of energy optimization, manufacturing plant documentation for operations, engineering, DCS (distributed control system)/HMI (human-machine interface) specification development and configuration; piping and instrumentation diagram development; piping and instrumentation design and development, process control functional description and specification development, detailed electrical instrumentation design, electrical instrument specification; medium-and low-voltage power distribution system design and implementation, hardwired safety interlock design, software safety interlock design, electrical heat trace design, electrical control cabinet construction, control cabinet design and layout, network design and layout, computer networking and system architecture design and implementation; Internet, intranet and extranet website design and development; custom database design and configuration; preparing engineering compliance reports; engineering consulting services, namely, technician calibration, outage services and planning, advanced process control solutions, demand planning, production planning and scheduling, logistics and distribution, manufacturing execution/production management, manufacturing intelligence, quality management, system health checks, product update monitoring, subsystem communication, system simulation; Remote monitoring in the field of industrial process controls systems, namely, PLC (programmable logic controllers), DCS (distributed control systems), and HMI (human machine interface) systems; Technical support services, namely, troubleshooting of industrial process control computer software problems; Maintenance of software used in PLC, DCS and HMI industrial process control systems; Providing engineering and engineering consulting services remotely in the fields of information technology, automation, manufacturing, and enterprise integration; remote computer network technical monitoring, software maintenance services, and data recovery servicesSECTION 8 - CANCELLEDSep 17, 2012

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 6, 2024NCS8NOTICE OF CANCELLATION SEC. 8 EMAILED
Jun 6, 2024C8.TCANCELLED SEC. 8 (10-YR)
Nov 20, 2023PR89POST REGISTRATION ACTION MAILED - SEC. 8 & 9
Nov 20, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
May 25, 2023E89RTEAS SECTION 8 & 9 RECEIVED
Dec 25, 2021REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
Feb 2, 2019NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
Feb 2, 2019C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
Jan 23, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Dec 20, 2018TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Dec 20, 2018E815TEAS SECTION 8 & 15 RECEIVED
Dec 25, 2017REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
Dec 25, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 20, 2012SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
Nov 19, 2012REGVLAW OFFICE REGISTRATION REVIEW COMPLETED
Nov 19, 2012CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
Oct 29, 2012SUPCSTATEMENT OF USE PROCESSING COMPLETE
Oct 29, 2012AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL
Oct 25, 2012IUAFUSE AMENDMENT FILED
Oct 25, 2012EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Sep 4, 2012NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 10, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jul 10, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 20, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jun 7, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Jun 4, 2012ALIEASSIGNED TO LIE
May 15, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Apr 25, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Apr 24, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Apr 24, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 31, 2012GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 31, 2012GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 31, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 26, 2012DOCKASSIGNED TO EXAMINER
Feb 22, 2012MPMKNOTICE OF PSEUDO MARK MAILED
Feb 21, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED

Frequently asked questions

Related guidance