Drawing for WATER MANAGEMENT INC.

USPTO serial 85571666

WATER MANAGEMENT INC.

Reviewed by CopyMark Law Group

Reg. 4455735Status 710
Filing date
Status date
Registration date
Dec 24, 2013
Examiner
KEARNEY, COLLEEN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with WATER MANAGEMENT INC.?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Kevin Oliveira

Kevin Oliveira ODIN, FELDMAN & PITTLEMAN, PC1775 Wiehle Avenue, Suite 400Reston, VA 20190-5159UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
042Consulting services in the field of the design of water management systems and water conservation management systems; design for others in the field of water management and water conservation management; consulting in the field of design and development of water systems and use and comprehensive plans for buildings, plants and facilities and water systems and use of water systems in buildings, plants and facilities; engineering services, namely, geotechnical engineering, civil engineering, structural engineering, and mechanical engineering; environmental engineering and surveying; construction quality control, namely, inspection and materials testing; providing testing services and inspection services in the field of water management, energy management, water management systems and energy management systems; conducting engineering and technical surveys; surveying and engineering; conducting of feasibility studies; conducting engineering studies; conducting engineering project studies; design engineering services in the field of water management, energy management, water management systems and energy management systems and consulting services in connection therewith; facilities design engineering services and consulting services in connection therewith; materials testing, materials inspection, and consulting services in connection therewith; environmental engineering services; research in the field of water management, energy management, water management systems and energy management systems and in the field of construction of water management, energy management, water management systems and energy management systems; scientific research; industrial research in the field of water management, energy management, water management systems and energy management systems; architectural and engineering project management services, namely, consulting in the fields of engineering and architecture. consultation services in the field of environmental assessment, compliance and planning; urban planning; project design management, namely, design for others in the fields of engineering and architecture; construction drafting; engineering, and technical advisory services concerning engineering; technical drawing and testing services, namely, technical surveying; quality testing and design services, namely, material testing; quality control services for others; architectural design; architectural and interior design services; computer modeling services for interpreting, assessing and simulating environmental conditions; providing engineering-based assessments of physical facilities and operating subsystems for use by others to determine condition and remaining useful life; industrial facility asset management, namely, providing engineering-based physical field assessments and oversight of facilities and major operating components for others, and recommending design solutions for facility deficiencies; provision of information, advisory and consultancy services relating to all the aforesaid servicesSECTION 8 - CANCELLEDFeb 23, 2012

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 31, 2020C8..CANCELLED SEC. 8 (6-YR)—
Dec 24, 2018REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Dec 24, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 20, 2013SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Nov 19, 2013REGVLAW OFFICE REGISTRATION REVIEW COMPLETED—
Nov 19, 2013CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Oct 31, 2013SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Oct 25, 2013AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Sep 26, 2013IUAFUSE AMENDMENT FILED—
Sep 26, 2013EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Sep 26, 2013TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 2, 2013NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Feb 5, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 16, 2013NPUBNOTICE OF PUBLICATION—
Dec 28, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 27, 2012ALIEASSIGNED TO LIE—
Dec 10, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 10, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 10, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 10, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 28, 2012TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 27, 2012CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 26, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 22, 2012DOCKASSIGNED TO EXAMINER—
Mar 27, 2012MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
Mar 26, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 20, 2012NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance