Drawing for PLASTI-FAB

USPTO serial 85572520

PLASTI-FAB

Reviewed by CopyMark Law Group

Reg. 4311880Status 800Registered
Filing date
Status date
Registration date
Apr 2, 2013
Examiner
VAGHANI, MAYUR C
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with PLASTI-FAB?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jordan LaVine

Jordan LaVine Flaster Greenberg P.C.Suite 100, 100 Front StreetConshohocken, PA 19428United States

Goods and services

ClassDescriptionStatusFirst use
017(Based on 44(e)) Insulating building products, namely, expanded polystyrene (EPS) insulation for commercial, residential, and geotechnical applications in the construction industry, namely, expanded polystyrene (EPS) insulation for roofs, walls, floors, foundations of buildings, and ice rink buildings; expanded polystyrene (EPS) insulation for use in the building of recreational vehicles, trucks, vessels, boats, railway cars, hot tubs, ice rinks, refrigerators, utility lines, and pipes; foam insulation for use in building and construction; structural insulated panels, namely, insulated panels for building walls and floors; insulating concrete forms for buildings composed of expanded polystyrene (EPS); Structural insulating panels for placement on edifices; energy-efficient building envelope systems comprised of foam insulation for use in building and construction, structural insulated construction panels for building walls and roofs, and insulating concrete forms used to build foundations and walls, all of the aforementioned sold as a unit; (Based on Use) Expanded polystyrene (EPS) foam for use in constructing foam props, custom signage, and movie and stage setsACTIVE
019(Based on 44(e)) Building construction material, namely, insulating concrete forms; (Based on Use) Prefabricated non-metal energy-efficient commercial and residential buildings; structural timber frames for buildings; lightweight fill material, namely, geotextiles for soil stabilization, landscaping, road embankments and a compressible inclusion against foundation walls; compressible fill material, namely, geotextiles for reducing potential forces on structures in the event of soil expansion, used under concrete grade beams, under structural floor slabs and against foundation walls, and used to support expected construction live loads and the weight of the structural slab; non-metal flotation billets used in building floating foundation platforms, docks, marinas and floating homes; expanded polystyrene (EPS) for use in architectural designs, namely, decorative details and mouldings; expanded polystyrene (EPS) drainage materials, namely, insulation boards made of expanded polystyrene (EPS) used to facilitate drainage of water relating to foundation walls; lumber; Lightweight fill material used for dirt replacement, filling voids, and structural applications, namely, foam blocks composed of expanded polystyrene (EPS) for use in soil stabilization, landscaping, road embankments, and as a compressible inclusion against foundation walls; Compressible fill material used for dirt replacement, filling voids, and structural applications, namely, foam blocks composed of expanded polystyrene (EPS) for reducing potential forces on structures in the event of soil expansion, used under concrete grade beams, under structural floor slabs and against foundation walls, and used to support expected construction live loads and the weight of the structural slabACTIVE
037[ Providing consulting services concerning building construction and the use of construction and building materials, namely, structural insulating panels, insulating concrete forms, timber frames for buildings, and insulating building products made of expanded polystyrene (EPS), for commercial, residential, and geotechnical applications; Installation of structural insulating panels, insulating concrete forms, timber frames for buildings, and insulated building products made of expanded polystyrene (EPS) for commercial, residential, and geotechnical applications; construction of energy-efficient commercial and residential buildings; ] providing consulting services in the field of energy-efficient commercial and residential building constructionACTIVE
041Educational services, namely, providing instructions and conducting workshops and seminars on energy-efficient commercial and residential buildings, expanded polystyrene (EPS) insulating building products, structural insulated panels and building panels, insulating concrete forms, timber frame building construction, and buildings made using the aforementioned componentsACTIVE
042Providing consulting services related to the design of energy-efficient buildings, insulated concrete forms and building systems or structures made from combinations of structural insulated panels, building panels and insulated concrete forms; custom design of structural insulated panels and building panels; custom design of buildings using structural insulated panels and building panels; custom design of insulated concrete forms and building systems or structures made from combinations of structural insulated panels, building panels and insulated concrete forms; custom design of buildings using insulated concrete forms or building systems or structures made from combinations of structural insulated panels, building panels and insulated concrete forms; providing consulting services related to the design of structural insulated panels and building panels; design of expanded polystyrene (EPS) insulating building products, structural insulated panels and building panels, insulating concrete forms, and timber frames for buildings for others; Providing consulting services concerning construction drafting; providing consulting services in the field of energy measurement to improve energy-efficiency of commercial and residential buildingsACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 8, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Jan 8, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 8, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Sep 28, 2023NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED
Sep 28, 2023RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Sep 28, 202389AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Sep 28, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Aug 30, 2023ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
Mar 24, 2023E89RTEAS SECTION 8 & 9 RECEIVED
Apr 2, 2022REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
Dec 26, 2019NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
Dec 26, 2019C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
Dec 19, 2019EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Aug 25, 2019PR23POST REGISTRATION ACTION MAILED - SEC. 8 & 15
Aug 19, 2019EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Aug 18, 2019CORVREVIEW OF CORRESPONDENCE COMPLETE - POWER OF ATTORNEY ENTERED
Aug 14, 2019EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS
Feb 18, 2019PR23POST REGISTRATION ACTION MAILED - SEC. 8 & 15
Feb 11, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Jan 29, 2019E815TEAS SECTION 8 & 15 RECEIVED
Jul 5, 2018ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 5, 2018REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Jun 25, 2018CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
Jun 25, 2018COARTEAS CHANGE OF OWNER ADDRESS RECEIVED
Apr 2, 2018REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
Apr 2, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 15, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jan 15, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 26, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Dec 7, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Dec 4, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Dec 4, 2012XAECEXAMINER'S AMENDMENT ENTERED
Dec 4, 2012GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Dec 4, 2012GNEAEXAMINERS AMENDMENT E-MAILED
Dec 4, 2012CNEAEXAMINERS AMENDMENT -WRITTEN
Nov 20, 2012GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Nov 20, 2012GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Nov 20, 2012CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Oct 26, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Oct 26, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Oct 15, 2012ALIEASSIGNED TO LIE
Oct 2, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 25, 2012GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 25, 2012GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 25, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 23, 2012DOCKASSIGNED TO EXAMINER
Mar 28, 2012MPMKNOTICE OF PSEUDO MARK MAILED
Mar 27, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Mar 21, 2012NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance