Drawing for ASK INDUSTRIES

USPTO serial 85576657

ASK INDUSTRIES

Reviewed by CopyMark Law Group

Reg. 4541434Status 710
Filing date
Status date
Registration date
Jun 3, 2014
Examiner
CLAYTON, CHERYL A
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ASK INDUSTRIES?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Bobby W. Braxton

Bobby W. Braxton Braxton, Hilton & Perrone PLLC4975 Preston Park Blvd Ste 490Plano, TX 75093UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
042Chemical analysis; Chemical engineering; Chemical research; Civil engineering; Civil engineering for the design of energy and process plants; Consulting in the field of engineering; Consulting in the field of structural engineering; Consulting in the fields of engineering and architecture; Consulting services in the field of industrial engineering; Engineering; Engineering design services; Engineering services and consultation for the detection of contaminants in water and waste water; Engineering services for building and property condition assessment, facility management, repair and restoration and building instrumentation; Engineering services, namely, engineering for the energy, oil and gas industry; Executing of chemical analyses; Mechanical engineering; Performance of chemical analyses; Structural engineering design services; Technology consultation in the field of energy, oil and gas production and exploration; Working on and evaluation of chemical analyses; Working on and evaluation of chemical syntheses; Chemical engineeringSECTION 8 - CANCELLEDJan 1, 2004

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 8, 2021C8..CANCELLED SEC. 8 (6-YR)—
Jun 3, 2019REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jun 3, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 18, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 18, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 17, 2014TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 26, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 12, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 30, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 16, 2014RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Sep 4, 2013ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 4, 2013REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 12, 2013RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Jan 10, 2013RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Jan 2, 2013ALIEASSIGNED TO LIE—
Jun 27, 2012GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jun 27, 2012GNSLLETTER OF SUSPENSION E-MAILED—
Jun 27, 2012CNSLSUSPENSION LETTER WRITTEN—
Jun 27, 2012DOCKASSIGNED TO EXAMINER—
Mar 29, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 26, 2012NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance