Drawing for IPV

USPTO serial 85606105

IPV

Reviewed by CopyMark Law Group

Reg. 4491729Status 710
Filing date
Status date
Registration date
Mar 4, 2014
Examiner
ANKRAH, NAAKWAMA S
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with IPV?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

MORTON J. ROSENBERG

MORTON J. ROSENBERG ROSENBERG, KLEIN & LEE3458 ELLICOTT CENTER DR STE 101ELLICOTT CITY, MD 21043-4178UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009SILICON WAFERS; PHOTOVOLTAIC CELLS; SOLAR CELLS; PANELS, NAMELY, PHOTOVOLTAIC PANELS AND SOLAR CELL PANELS FOR THE PRODUCTION OF ENERGY; PANELS, NAMELY, PHOTOVOLTAIC PANELS AND SOLAR CELL PANELS FOR GENERATING ELECTRICITY; SOLAR MODULES FOR ELECTRICITY GENERATION; SOLAR SYSTEMS FOR GENERATION OF ELECTRICITY, NAMELY, SOLAR MODULES, SOLAR GENERATORS, AND INVERTERS; MODULES, NAMELY, PHOTOVOLTAIC MODULES AND SOLAR CELL MODULES FOR THE PRODUCTION OF ENERGY; MODULES, NAMELY, PHOTOVOLTAIC MODULES AND SOLAR CELL MODULES; PHOTOVOLTAIC INSTALLATION APPARATUS FOR ELECTRICITY GENERATION, NAMELY, SOLAR MODULES FOR PRODUCTION OF ELECTRICITY, SOLAR THERMAL AND ELECTRIC RECEIVERS, AND PHOTOVOLTAIC CONCENTRATORS; SOLAR POWER INSTALLATIONS; PHOTOVOLTAIC CONCENTRATORS; SOLAR INSTALLATIONS AND INSTALLATIONS FORMED THEREFROM AS WELL AS PARTS THEREFOR FOR PRODUCTION OF ELECTRICITY, NAMELY, AN ENERGY CONVERTING, COLLECTING AND OUTPUTTING DEVICE FEATURED WITH CONVERTING ENERGY FROM SOLAR ENERGY TO ELECTRICITY COMPRISING A PLURALITY OF SOLAR CELLS, SOLAR MODULES, DC/AC CONVERTERS, CONTROLLER, CONDITION SENSOR, SAFETY PROTECTOR AND THE BATTERIES; SEMICONDUCTORS; ELECTRONIC CONTROL MECHANISMS FOR THERMAL AND PHOTOVOLTAIC SOLAR SYSTEMS; THIN-FILM SOLAR CELLS; ELECTRICAL CONNECTING PARTS FOR ELECTRIC CONDUITS, NAMELY, ELECTRICAL CONNECTORS, CONNECTING ELECTRICAL CABLES; ELECTRIC ACCUMULATORS; ELECTRIC BATTERIES, INVERTERS; CHARGERS FOR ELECTRIC BATTERIES; ELECTRICITY COLLECTORS; ELECTRICITY LIMITERS; ELECTRIC COLLECTORS, NAMELY, PHOTOVOLTAIC CELLS ALSO INCLUDING A SOLAR THERMAL COLLECTOR SOLD AS A UNIT; ELECTRIC COMMUTATORS; COMMUTATORS; CIRCUIT BREAKERS; POWER INVERTERS; ELECTRIC MONITORING APPARATUS FOR MONITORING ELECTRIC CURRENTS; VOLTAGE SURGE PROTECTORS; ELECTRICITY CONDUITS; ELECTRIC CONDUCTORS; ELECTRONIC TRANSISTORS; JUNCTION SLEEVES FOR ELECTRIC CABLES; ELECTRIC PLUGS FOR ELECTRIC CABLES; ELECTRIC SWITCHES; ELECTRIC WIRES; ELECTRIC CABLES; CLAMP METERS FOR MEASURING ELECTRICITY; INTEGRATED CIRCUITSSECTION 8 - CANCELLEDApr 17, 2013

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 9, 2020C8..CANCELLED SEC. 8 (6-YR)—
Mar 4, 2019REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Mar 4, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 30, 2014SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Jan 29, 2014REGVLAW OFFICE REGISTRATION REVIEW COMPLETED—
Jan 29, 2014CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Jan 23, 2014SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Jan 15, 2014AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jan 13, 2014AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Dec 4, 2013IUAFUSE AMENDMENT FILED—
Dec 4, 2013EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Jun 25, 2013NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Apr 30, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 30, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 10, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 22, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 19, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 22, 2013RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Feb 13, 2013ALIEASSIGNED TO LIE—
Aug 13, 2012GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Aug 13, 2012GNSLLETTER OF SUSPENSION E-MAILED—
Aug 13, 2012CNSLSUSPENSION LETTER WRITTEN—
Aug 11, 2012DOCKASSIGNED TO EXAMINER—
Apr 30, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 27, 2012NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance