Drawing for SUN ENERGY GROUP

USPTO serial 85607843

SUN ENERGY GROUP

Reviewed by CopyMark Law Group

Reg. 4374580Status 710
Filing date
Status date
Registration date
Jul 30, 2013
Examiner
JOHNSON, AISHA CLARKE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with SUN ENERGY GROUP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jason M. Vogel

JASON M. VOGEL KILPATRICK TOWNSEND & STOCKTON LLP1114 AVENUE OF THE AMERICASNEW YORK, NY 10036-7703UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; components for electrical and electronic systems, namely, protection relays, electric contactors, apparatus for transmission of communication and electronic display interfaces; photovoltaic cells; photovoltaic inverters; solar panels for production of electricity; solar batteries; solar cells; photovoltaic apparatus and installations for production of solar electricity, namely, solar modules, solar thermal receivers, and photovoltaic cells and modules; electric and electronic sensors for measuring solar radiation; electricity meters; energy meters for tracking and monitoring energy usage; smart meters, namely, electricity meters and frequency meters; energy metering and storage equipment and systems, namely, electricity meters, electrical storage batteries; computer software for managing energy measurement data for the energy and power industry; electrical apparatus utilizing solar cells, namely, electric light switches, electric light dimmers; apparatus for the testing of solar cells and solar panels; inverters; fuel cells; electric control panels; electric converters and transformers; electric cables and wires; electronic and infrared control devices for heating and energy management and for controlling photovoltaic apparatus and installations for production of solar electricity, namely, solar modules, solar thermal receivers, and photovoltaic cells and modules; video display monitors; relay protection devices; electronic motor controllers; solid state electronic controls used to regulate current flow; electronic control units including computer software for monitoring solar electric or wind power systems; photoelectric sensors; calibrated photovoltaic reference cells; ampere-hour meters; anodes; capacitors; circuit breakers and electric circuit closers; light emitting diodes (LED); light emitting diode (LED) circuit boards; light emitting diode (LED) displaysSECTION 8 - CANCELLED—
037Building construction services; installation of solar heat collection panels and computer systems; maintenance and repair of solar heat collection panels, electrical systems and computer systems; installation, maintenance and repair of solar powered systems for residential and commercial use; installation, maintenance and repair of solar installations for generating power, solar collectors and photovoltaic modules; installation, maintenance and repair of solar panels; electrical installation services, namely, installation of electrical systems; electrical wiring installation services; installation of electricity generators; installation, maintenance and repair of LED lighting apparatus; installation of renewable energy generation equipment; consultation in the field of building construction; consultation in the field of installation, maintenance and repair of solar power systems, solar collectors, photovoltaic modules, electric wiring, electricity generators, LES lighting and renewable energy generation equipmentSECTION 8 - CANCELLED—
039Distribution of electricity; providing information relating to the distribution of electricity; transmission, distribution and supply of electricity; consultation in the field of distribution, transmission, and supply of electricitySECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 6, 2020C8..CANCELLED SEC. 8 (6-YR)—
Jul 30, 2018REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jul 30, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 14, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 14, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 24, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 11, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 11, 2013ALIEASSIGNED TO LIE—
Mar 21, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 18, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 18, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 18, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 29, 2012GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 29, 2012GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 29, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 13, 2012DOCKASSIGNED TO EXAMINER—
May 3, 2012MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
May 2, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 28, 2012NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance