Drawing for METZ CONNECT

USPTO serial 85652222

METZ CONNECT

Reviewed by CopyMark Law Group

Reg. 4471707Status 800Registered
Filing date
Status date
Registration date
Jan 21, 2014
Examiner
SPRUILL, DARRYL M
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with METZ CONNECT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Thomas J. Mango

Thomas J. Mango Cantor Colburn LLP20 Church Street22nd FloorHartford, CT 06103

Goods and services

ClassDescriptionStatusFirst use
009Electric connection components, in particular connectors, plugs, bushings, contacts and terminals for printed circuit boards, installation material for making electric connections, in particular connection components comprising of electric connectors, plugs, bases, bushings, terminals, adapters, couplings, connection boxes, sockets, distribution boxes, distribution panels, patch panels, distribution cables, patch cables, cables, cable sets comprising of cables and connectors, pre-installed connection conduits for data and telecommunications network; installation material for making optical connections, in particular connection components comprising of optical fibres, light conduction filaments, optical fibre cords, fibre-optic cables, optical connectors, plugs, bases, bushings, adapters, couplings, connection boxes, sockets, distribution panels, patch panels, distribution cables, patch cables, fibre-optic cable sets comprising of optical cables and connectors, preinstalled fibre-optic connection conduits for data and telecommunication networks; testing and measuring apparatus, in particular for electric networks, for optical networks, for data transmission and for telecommunications; electric, electronic and optical components and systems made thereof comprising of electric connectors, plugs, terminals, adapters, couplings, distribution boxes, distribution panels, patch panels, distribution cables, patch cables, cables, optical fibres, light conduction filaments, optical fibre cords, fibre-optic cables, optical connectors, optical plugs, optical adapters, optical couplings, optical distribution panels, optical patch panels, optical distribution cables, optical patch cables for managing connections on distribution panels or patch panels; electric and electronic assemblies and equipment, namely, analog and digital input and output modules, timers, monitoring assemblies comprising of monitoring modules and monitoring software, electrical power supplies comprising of AC/DC power supplies and DC/DC power supplies, control apparatus, sensors and systems made thereof comprising of analog and digital input and output modules, timers, monitoring assemblies comprising of monitoring modules and monitoring software, electrical power supplies comprising of AC/DC power supplies and DC/DC power supplies, wireless or computer network repeaters, gateway routers, and hubs; electronic devices for the measuring, capture, storage, transmission and evaluation of energy consumption or environmental information; electric and electronic protective and switching equipment, in particular relays, coupling modules, fuses, overvoltage protection modules, and switchesACTIVEFeb 28, 2012

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 12, 2024NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED
Apr 12, 2024RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Apr 12, 202489AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Apr 10, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Nov 29, 2023E89RTEAS SECTION 8 & 9 RECEIVED
Jan 21, 2023REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
Oct 21, 2019NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
Oct 21, 2019C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
Oct 17, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Sep 6, 2019E815TEAS SECTION 8 & 15 RECEIVED
Mar 8, 2014COC.CORRECTION UNDER SECTION 7 - PROCESSED
Mar 7, 2014APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Feb 19, 2014AMD7SEC 7 REQUEST FILED
Feb 19, 2014ES7RTEAS SECTION 7 REQUEST RECEIVED
Jan 21, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 14, 2013SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE MAILED
Dec 13, 2013REGVLAW OFFICE REGISTRATION REVIEW COMPLETED
Dec 9, 2013CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
Nov 19, 2013SUPCSTATEMENT OF USE PROCESSING COMPLETE
Nov 12, 2013AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL
Oct 10, 2013IUAFUSE AMENDMENT FILED
Oct 10, 2013EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Jul 23, 2013NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 28, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 8, 2013NPUBNOTICE OF PUBLICATION
Apr 22, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Apr 19, 2013ALIEASSIGNED TO LIE
Mar 29, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Mar 7, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Mar 6, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 6, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 9, 2012CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 8, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 27, 2012DOCKASSIGNED TO EXAMINER
Jun 22, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jun 18, 2012NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance