Drawing for GEMMA

USPTO serial 85675281

GEMMA

Reviewed by CopyMark Law Group

Reg. 4524146Status 800Registered
Filing date
Status date
Registration date
May 6, 2014
Examiner
LEHKER, DAWN FELDMAN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with GEMMA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Ryan A. McGonigle

Ryan A. McGonigle Hodgson Russ LLP605 Third Avenue, Suite 2300New York, NY 10158United States

Goods and services

ClassDescriptionStatusFirst use
035Physical operation of power plants; power plant operation for others; business consultation in the field of power plant operations and maintenance; operation of power plants; business services, namely, operation of power generation equipment and facilities for others; procurement services, namely, the procurement of building materials, supplies and equipment for the construction, installation, commissioning, operation and maintenance of power plants; assisting with the formation, negotiation, and management of power purchase agreements, facility service agreements and site development; Negotiation and settlement of commercial transactions for third partiesACTIVEMay 1, 1997
037Building construction; construction planning; construction, installation, commissioning, maintenance and repair of power stations, power plants, renewable energy generation equipment, and power plant equipment for on-site energy generation; development of power plants, namely, planning and laying out of power plant facilities; commissioning of power plants; cleaning services, namely, mechanically removing scale and sludge from tubes in steam generators in power plants; construction project management services in the field of construction of renewable energy and energy generation equipment support structures and ancillary structures for supporting meteorological data gathering equipment; consulting services in the field of construction of wind energy facilities; consulting services in the field of construction of renewable energy power plants; consulting services in the field of construction of biodiesel production plants; Repair or maintenance of pollution control equipment; retrofitting existing power generating facilities and power plants with pollution control equipment; Machinery retrofit and conversion services; Maintenance, repair, replacement and tuning of components, parts or systems in steam and gas turbine generators; Installation and maintenance of mechanical systems in the nature of selective catalytic reduction (SCR) systems for boilers in biomass generation facilities; power generation engine cleaning servicesACTIVEMay 1, 1997
040Consulting services in the field of production of wind energy; consulting services in the field of production of renewable energy; technical consultation in the field of production of renewable energy; energy generation services; assembly of power generation engines for others; consultation in the field of custom fabrication of power generation equipment; providing technical information in the field of power generationACTIVEMay 1, 1997
042Design of power plants; design of facilities that convert waste or biomass to energy; engineering services in the field of industrial, commercial, and government construction projects; conducting technical measurements, inspections and calculations in the field of power plants; technological consulting services in the field of alternative energy generation; engineering services for generation, supply, distribution and transmission of electricity and gas; designing plant components and equipment for power plants; engineering services; quality control for others; development of quality control standards for power plants; Technical consulting in the field of pollution detection; Scientific and research consultation in the field of biodiesel fuel and ethanol; Technical air quality monitoring services; Custom design and development of air quality measurement programs; research in the field of energy; research and development of environmentally friendly forms of energy and power; technological planning and consulting services in the field of renewable energy generationACTIVEMay 1, 1997
045Consulting in the field of workplace safety; inspection of power plants and associated fabrication facilities for safety purposes; Analysis and consultation pertaining to job site safety; Consultancy on regulations on safety at work; Safety consulting services in the fields of hazard assessments and abatement procedures; Advice and consultancy on environmental regulatory matters; Control of building environmental access and security systemsACTIVEMay 1, 1997

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 7, 2024NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Aug 7, 2024RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Aug 7, 202489AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Aug 7, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 17, 2024E89RTEAS SECTION 8 & 9 RECEIVED—
May 6, 2023REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Aug 20, 2020NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Aug 20, 2020C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Aug 17, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 25, 2020E815TEAS SECTION 8 & 15 RECEIVED—
May 6, 2019REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jul 14, 2017TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 27, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 27, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 6, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 18, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 18, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 6, 2014CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Feb 6, 2014COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jan 29, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 14, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 6, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 20, 2013XAECEXAMINER'S AMENDMENT ENTERED—
Dec 20, 2013GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Dec 20, 2013GNEAEXAMINERS AMENDMENT E-MAILED—
Dec 20, 2013CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 6, 2013GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Sep 6, 2013GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 6, 2013CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 12, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 12, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 8, 2013ALIEASSIGNED TO LIE—
Jul 2, 2013NREVNOTICE OF REVIVAL - E-MAILED—
Jul 1, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 1, 2013PETGPETITION TO REVIVE-GRANTED—
Jul 1, 2013PROATEAS PETITION TO REVIVE RECEIVED—
Jun 11, 2013MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jun 11, 2013ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Nov 13, 2012GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 13, 2012GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 13, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 5, 2012DOCKASSIGNED TO EXAMINER—
Jul 19, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—

Frequently asked questions

Related guidance