Drawing for BRANDT

USPTO serial 85698874

BRANDT

Reviewed by CopyMark Law Group

Reg. 4639230Status 800Registered
Filing date
Status date
Registration date
Nov 18, 2014
Examiner
SHIH, SALLY
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with BRANDT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Dyan M. House

Dyan M. House Baker & McKenzie, LLP1900 N. Pearl St., Suite 1500Dallas, TX 75201United States

Goods and services

ClassDescriptionStatusFirst use
037Building contractor services in the nature of mechanical, electrical and plumbing engineering services; Building construction services in the nature of mechanical, electrical and plumbing engineering services; Consulting services for clean room construction, retrofitting, repair and maintenance in the nature of mechanical, electrical and plumbing engineering services; Consulting services for energy-efficient construction, retrofitting, repair and maintenance; Contractor services, namely, review of and remedial recommendations for building plumbing, electrical and mechanical systems for others; Electrical contracting; Electrical contractor services; Electrical repairs and installation of HVAC, plumbing and electrical systems; General contractor services, namely, plumbing, heating and air conditioning, carpentry, drywall, painting, electrical, building and framing contractor services; HVAC contractor services; Hydro-electric factory construction; Industrial pipeline construction and maintenance; Industrial pipeline installation and repair; Installation of electrical systems; Installation of HVAC, plumbing and electrical systems; Installation of industrial piping; Installation of plumbing systems; Installation of process controls; Installation of process piping; Installation, repair and maintenance of clean room facilities and equipment; Mechanical contractor services; Plumbing; Plumbing and gas and water installation; Plumbing contractor services; Providing technical support, namely, technical advice concerning the installation, repair and maintenance of electric or electronic apparatus, equipment and devices used for automated or partly automated industrial operations in the nature of mechanical, electrical and plumbing engineering services; Repair or maintenance of air-conditioning apparatus for industrial purposes; Process piping construction and maintenance; Process piping installation and repair; Technical consulting related to the installation of HVAC equipment, control systems and machineryACTIVENov 4, 2008
042Consulting services in the field of mechanical engineering; Consulting services in the field of design and development of engineering processes in the nature of mechanical, electrical and plumbing engineering services; Custom design and engineering of process controls for HVAC systems; Custom design and engineering of process controls for building systems in the nature of mechanical, electrical and plumbing engineering services; Design of process control systems in the nature of mechanical, electrical and plumbing engineering services; Engineering services in the field of energy efficiency; Engineering services for clean room construction, retrofitting, repair and maintenance in the nature of mechanical, electrical and plumbing engineering services; Engineering services for energy-efficient building construction, retrofitting, repair and maintenance in the nature of mechanical, electrical and plumbing engineering services; Engineering consulting services for the development, implementation and operation of precision cleaning technology, instrumentation and expertise for clean room related facilities and equipment; Engineering consulting services for the development, implementation and operation of process controls in the nature of mechanical, electrical and plumbing engineering services; Mechanical engineering services; Technical support services, namely, troubleshooting of industrial process controls; Planning and layout design services for clean room environmentsACTIVENov 4, 2008

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 28, 2024NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Jun 28, 2024RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Jun 28, 202489AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Jun 28, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 29, 2024E89RTEAS SECTION 8 & 9 RECEIVED—
Nov 18, 2023REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jan 4, 2021NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Jan 4, 2021C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Jan 4, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 7, 2020E815TEAS SECTION 8 & 15 RECEIVED—
Nov 18, 2019REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Apr 17, 2017TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 7, 2016TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 13, 2016TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 18, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 2, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 2, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 13, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 31, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 29, 2014EXPTEXPARTE APPEAL TERMINATED—
Jul 29, 2014EXPTEXPARTE APPEAL TERMINATED—
Jul 29, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 29, 2014ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jul 29, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 18, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 18, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 17, 2014ALIEASSIGNED TO LIE—
Jul 10, 2014ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jul 10, 2014TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 10, 2014EXPIEX PARTE APPEAL-INSTITUTED—
Jul 10, 2014JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Jul 10, 2014EXAFEXPARTE APPEAL RECEIVED AT TTAB—
Jan 10, 2014GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jan 10, 2014GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 10, 2014CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 20, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 19, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 19, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 19, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 19, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 19, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 11, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 10, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 10, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 10, 2012GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 10, 2012GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 10, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 5, 2012DOCKASSIGNED TO EXAMINER—
Aug 16, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 11, 2012NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance