Drawing for ATCO EMISSIONS MANAGEMENT

USPTO serial 85699003

ATCO EMISSIONS MANAGEMENT

Reviewed by CopyMark Law Group

Reg. 4934767Status 710
Filing date
Status date
Registration date
Apr 12, 2016
Examiner
SAITO, KIM
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ATCO EMISSIONS MANAGEMENT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Connie L. Ellerbach, Esq.

Connie L. Ellerbach, Esq. FENWICK & WEST LLP801 California StreetSilicon Valley CenterMountain View, CA 94041

Goods and services

ClassDescriptionStatusFirst use
006PREFABRICATED AND PORTABLE METAL CLAD BUILDINGS USED, NAMELY, AS INDUSTRIAL BUILDINGS TO HOUSE EQUIPMENT AND TO ABATE EQUIPMENT NOISESECTION 8 - CANCELLED—
007COMBUSTION AIR INTAKE AND EXHAUST SILENCERS FOR GAS TURBINES; GAS TURBINE COMBUSTION AIR INLET FILTER HOUSE; SIMPLE CYCLE CATALYST SYSTEMS FOR REDUCING CARBON MONOXIDE AND NITROGEN OXIDES EMISSIONS AND MINIMIZING AMMONIA SLIP IN GAS TURBINES USED IN POWER GENERATION FACILITIES COMPRISED OF COMBUSTION TURBINESSECTION 8 - CANCELLED—
011INLET HEATING INSTALLATIONS FOR MODULAR AND PREFABRICATED BUILDINGS; VENTILATING INTAKE AND EXHAUST SYSTEMS COMPRISED OF BYPASS STACKS, DIVERTER DAMPERS, GUILLOTINE DAMPER, VERTICAL SILENCER DUCTS, EXHAUST STACKS, BYPASS DIVERTERS, AND EXHAUST DIFFUSER AND PLENUM, ALL SOLD AS A UNIT; EXHAUST STACKS AND HOT EXHAUST SILENCERS, ALL PART OF VENTILATING EXHAUST AND INTAKE SYSTEMS; WASTE HEAT RECOVERY BOILERS FOR USE IN PETROCHEMICAL PLANTS AND HEAT RECOVERY STEAM GENERATORS TO RECOVER WASTE HEAT FROM GAS TURBINES; DIVERTER DAMPERS IN THE NATURE OF HEAT RECOVERY STEAM GENERATOR OF A GAS TURBINE BYPASS SYSTEM WHICH ALLOW WORKERS AT POWER GENERATION FACILITIES TO PERFORM MAINTENANCE TO THE HEAT RECOVERY SYSTEM WITHOUT ENDANGERING WORKERS TO HOT LETHAL GASES, BY DIVERTING GASES FROM THE HEAT RECOVERY STEAM GENERATOR AND FOR CONTROLLED RAMPING UP OF THE HEAT RECOVERY STEAM GENERATOR AND STEAM CYCLESECTION 8 - CANCELLED—
017INDUSTRIAL ACOUSTIC NOISE BARRIER UNITS FOR INDUSTRIAL FACILITIES FOR RETROFITTING EXISTING FACILITIES, FOR POWER GENERATION PLANTS, FOR COMPRESSOR, REGULATOR, METER AND PUMPING STATIONS, NAMELY, ACOUSTIC ROOFING PANELS, WALLS AND WALL BARRIER PANELS; INDUSTRIAL ACOUSTIC NOISE BARRIER SYSTEMS FOR INDUSTRIAL FACILITIES, FOR RETROFITTING EXISTING FACILITIES, FOR POWER GENERATION PLANTS, FOR COMPRESSOR, REGULATOR, METER AND PUMPING STATIONS, COMPRISED OF NOISE SILENCERS IN THE NATURE OF LAYERED ACOUSTICAL TILES, MODULAR ACOUSTICAL PANELS, ACOUSTICAL INSULATION BARRIER PANELS, ACOUSTICAL INSULATION FOR USE IN BUILDINGS, ACOUSTICAL EQUIPMENT ENCLOSURES, ACOUSTICAL MECHANICAL SYSTEMS, ACOUSTICAL DOORS AND WINDOWS; ACOUSTIC BUILDING VENTILATION, NAMELY, ACOUSTIC BUILDING HEATING, AIR CONDITIONING AND VENTILATION SYSTEMS, COMPRISED OF ACOUSTIC NOISE SILENCERS, MUFFLERS AND ACOUSTIC WALLS, NOISE AND VIBRATION DAMPENING MATERIALSSECTION 8 - CANCELLED—
019INDUSTRIAL ACOUSTIC NOISE BARRIER UNITS FOR INDUSTRIAL FACILITIES, FOR RETROFITTING OF EXISTING FACILITIES, FOR POWER GENERATION PLANTS, FOR COMPRESSOR, METER AND PUMPING STATIONS, NAMELY, NON-METAL DOORS AND WINDOWSSECTION 8 - CANCELLED—
035BUSINESS PROJECT MANAGEMENT SERVICES RELATING TO POWER PLANTSSECTION 8 - CANCELLED—
036RENTAL AND LEASING OF ACOUSTIC EQUIPMENT ENCLOSURE STRUCTURESSECTION 8 - CANCELLED—
037INSTALLATION OF PREFABRICATED BUILDINGS AND GAS TURBINE SYSTEMS AT POWER PLANTS; INSTALLATION OF INTERIOR ACOUSTIC AND BUILDING ENCLOSURES, NAMELY, WALLS, DOORS, ROOFS AND WINDOWS AND ACOUSTIC AND MODELING SURVEYING; PROVIDING TECHNICAL INFORMATION ABOUT THE CONSTRUCTION OF MODULAR AND PREFABRICATED BUILDINGS, INSTALLATION OF BUILDING ACOUSTICS AND NOISE REDUCTION; MAINTENANCE OF ACOUSTIC EQUIPMENT ENCLOSURE STRUCTURES; MAINTENANCE OF CATALYTIC REDUCTION AND OXIDATION UNITS FOR TREATING AND CONTROLLING EMISSIONSSECTION 8 - CANCELLED—
039TRANSPORTATION OF PREFABRICATED BUILDINGS AND ALL POWER PLANT EQUIPMENTSECTION 8 - CANCELLED—
040RENTAL AND LEASING OF CATALYTIC REDUCTION AND OXIDATION UNITS FOR TREATING AND CONTROLLING EMISSIONSSECTION 8 - CANCELLED—
042DESIGN AND ENGINEERING SERVICES RELATING TO PREFABRICATED BUILDINGS; DESIGN OF EMISSIONS MANAGEMENT SYSTEMS, WASTE HEAT RECOVERY SYSTEMS, GAS TURBINE EQUIPMENT AND NOISE REDUCTION SYSTEMS, ALL FOR USE WITH POWER PLANTS; INDUSTRIAL DESIGN, DRAFTING, ENGINEERING, MATERIAL TESTING, MECHANICAL RESEARCH, AND TECHNICAL RESEARCH AND DEVELOPMENT STUDIES RELATING TO SILENCING ARTICLES AND STRUCTURES, NAMELY, LAYERED ACOUSTICAL ASSEMBLIES, MODULAR ACOUSTICAL PANEL PACKAGES, ACOUSTICAL BARRIERS, ACOUSTICAL BUILDINGS, ACOUSTICAL EQUIPMENT ENCLOSURES, ACOUSTICAL MECHANICAL SYSTEMS, ACOUSTICAL DOORS AND WINDOWS; DESIGN OF INTERIOR ACOUSTIC AND BUILDING ENCLOSURES, NAMELY, WALLS, DOORS, ROOFS AND WINDOWS; OPERATIONS SERVICES, NAMELY, FIELD ENGINEERING, INSPECTION AND TESTING OF PREFABRICATED BUILDINGSSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 28, 2022C8..CANCELLED SEC. 8 (6-YR)—
Jun 28, 2021CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jun 28, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 28, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 28, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 28, 2021COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Apr 12, 2021REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Dec 17, 2018TMBNTTAB RELEASE CASE TO TRADEMARKS—
Dec 17, 2018CANTCANCELLATION TERMINATED NO. 999999—
Dec 17, 2018CANDCANCELLATION DENIED NO. 999999—
Jul 20, 2017ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 20, 2017REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 11, 2017PETCCANCELLATION INSTITUTED NO. 999999—
Apr 12, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 8, 2016DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Feb 20, 2016AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jan 28, 2016IUCNNOTICE OF ALLOWANCE CANCELLED—
Jan 28, 2016EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Jul 28, 2015NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jun 2, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 2, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 13, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 29, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 21, 2015CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Apr 21, 2015COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Apr 20, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 17, 2015XAECEXAMINER'S AMENDMENT ENTERED—
Apr 17, 2015GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 17, 2015GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 17, 2015CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 2, 2015XAECEXAMINER'S AMENDMENT ENTERED—
Apr 2, 2015GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 2, 2015GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 2, 2015CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 12, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 12, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 6, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 13, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 13, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 8, 2014CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 6, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 30, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 30, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 23, 2014ALIEASSIGNED TO LIE—
Jul 22, 2014ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Jun 13, 2014TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 22, 2014CNSIINQUIRY AS TO SUSPENSION MAILED—
Jan 21, 2014CNSISUSPENSION INQUIRY WRITTEN—
Jan 21, 2014RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Jan 21, 2014ALIEASSIGNED TO LIE—
Jul 5, 2013CNSLLETTER OF SUSPENSION MAILED—
Jul 5, 2013CNSLSUSPENSION LETTER WRITTEN—
Jun 18, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 17, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 17, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 17, 2012CPRAPRIORITY ACTION MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Dec 17, 2012CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Dec 5, 2012DOCKASSIGNED TO EXAMINER—
Aug 17, 2012MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
Aug 16, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 11, 2012NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance