USPTO serial 85702228
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Melbourne, Vic 3000, AU
Melbourne, Vic 3000, AU
Melbourne, Vic 3000, AU
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Bharati Bakshani
Bharati Bakshani Ladas & Parry LLP1040 Avenue of the AmericasNew York, NY 10018-3738UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Common metals and alloys of common metals; precoated metal sheet, precoated and prepainted metal in the form of sheets, coil and strip; prepainted metal building materials, namely, composite panels composed primarily of metal, soffits, fascia; metal in the form of sheets, coils, strips, plates, bars, rods, slabs and ingots; cladding of metal for construction and building, ceiling supports of metal, trusses, purlins, joists and structural decking; metal formwork and reinforcing materials of metal for building purposes; metal mesh, steel in expanded metal form; metal rainwater products, namely, facias, guttering, ridge capping, downpipe for draining water; metal drain pipes; metal roofing; metal rainwater tanks; metal building frames, framing sections and accessories thereto for houses and commercial buildings, namely, metal joists and metal roof trusses; transportable buildings of metal; metal fencing materials, namely, metal wire fencing; metal posts and panels; pipes and tubes of metal; metal facias, metal channels, metal angles, brackets, clips and clamps, all of metal | SECTION 8 - CANCELLED | — |
| 019 | Non-metallic building materials, namely, plastic decking boards; non-metallic drainage pipes; rigid pipes not of metal for building; reinforcing mesh made of textile fibers for construction purposes; non-metallic roof sheets, non-metallic wall sheets and non-metallic building panels; non-metal fence panels; non-metallic posts and clips for buildings | SECTION 8 - CANCELLED | — |
| 035 | Business management and administration; commercial or industrial management assistance; cost-price analysis; computerized file management; providing an online database featuring trade information in the field of building and construction, manufacturing and automotive applications; arranging bartering exchanges between buyers and sellers; export agency services for the goods of others; import-export agencies; advertising services, namely, promoting and marketing the goods and services of others; the bringing together, for the benefit of others, of a variety of goods, excluding the transport thereof, enabling customers to conveniently view and purchase those goods; computerized retail store services featuring products for building and construction, manufacturing and automotive applications, namely, steel slab, plate, hot and cold rolled coil, coated and painted strip products, roof and wall cladding, purlins and house framing; data processing services; storage and retrieval of business information | SECTION 8 - CANCELLED | — |
| 037 | Building construction; repair, installation and maintenance of products for building and construction, manufacturing and automotive applications, namely, steel slab, plate, hot and cold rolled coil, coated and painted strip products, roof and wall cladding, purlins and house framing; construction planning | SECTION 8 - CANCELLED | — |
| 040 | Treatment of metal; processing of plastic; manufacturing services for others in the field of building and construction, manufacturing and automotive applications; custom manufacturing of products for building and construction, manufacturing and automotive applications, namely, steel slab, plate, hot and cold rolled coil, coated and painted strip products, roof and wall cladding, purlins and house framing; applying metal coatings on metal and on non-metal surfaces to provide surface protection and surface build up; cutting and processing of metal material for commercial use; metal galvanization and chromium plating services | SECTION 8 - CANCELLED | — |
| 042 | Engineering services, namely, engineering design, engineering land surveying, engineering drawing and construction engineering; engineering consulting; scientific research; industrial research in the field of building and construction, manufacturing and automotive applications; technical research; construction drafting computer project management; industrial design; professional, consultancy and technical services relating to the production and testing of metal products and building materials; materials testing; chemical research; chemistry services; computer programming; development, design, updating, modifying and maintenance of computer software; rental of computer software and hardware; computer software and hardware advisory services relating to the installation, maintenance and repair of computer systems; technical consultancy services in the fields of computer software and computer hardware systems | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| May 6, 2022 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Oct 20, 2020 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Feb 27, 2017 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 27, 2017 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 20, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 4, 2015 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 4, 2015 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 15, 2015 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 29, 2015 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Jun 17, 2015 | ATRQ | ATTORNEY REVIEW/DECISION ON AMENDMENT REQUIRED | — |
| Jun 17, 2015 | PCBG | PETITION TO DIRECTOR - CHANGE BASIS - GRANTED | — |
| Jun 8, 2015 | APET | ASSIGNED TO PETITION STAFF | — |
| Jun 1, 2015 | TPAD | TEAS PETITION TO AMEND BASIS RECEIVED | — |
| Mar 5, 2015 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Mar 4, 2015 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Feb 20, 2015 | EXT3 | SOU EXTENSION 3 FILED | — |
| Feb 20, 2015 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Sep 5, 2014 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Sep 4, 2014 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Sep 4, 2014 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Aug 13, 2014 | EXT2 | SOU EXTENSION 2 FILED | — |
| Aug 13, 2014 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 11, 2014 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 7, 2014 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Feb 7, 2014 | EXT1 | SOU EXTENSION 1 FILED | — |
| Feb 7, 2014 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 20, 2013 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jun 25, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 25, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 5, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 23, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 18, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 14, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 14, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 14, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 10, 2012 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 10, 2012 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 10, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 9, 2012 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 27, 2012 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| Aug 22, 2012 | ALIE | ASSIGNED TO LIE | — |
| Aug 20, 2012 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 17, 2012 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Aug 16, 2012 | NWAP | NEW APPLICATION ENTERED | — |