Drawing for VORTEX

USPTO serial 85723522

VORTEX

Reviewed by CopyMark Law Group

Reg. 4728028Status 710
Filing date
Status date
Registration date
Apr 28, 2015
Examiner
LEE, DOUGLAS
Law office
TMO LAW OFFICE 111

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with VORTEX?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeff Goehring

Jeff Goehring Nixon & Vanderhye P.C.901 N. Glebe Road, 11th FloorArlington, VA 22203UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Metal chests and metal frames for dredging machines, machinery, equipment and toolsSECTION 8 - CANCELLEDJul 6, 2009
007Metal dredging machines; [ metal power tools, namely, drill presses; ] machines and machinery used for dredging and excavating operations and parts therefor; dredging rigs, floating or non-floating and fittings there-for in this class; all for use in oil, mining, quarrying industries, dredging works, offshore works, namely, for the offshore oil industry, offshore wind farming, and offshore farming and aquaculture, wet soil treatment and/or wet soil movement, removing accumulated sedimentation from the bottom of water areas such as lakes, rivers, streams, canals, fish hatcheries, and industrial, commercial and agricultural settling basinsSECTION 8 - CANCELLEDJul 6, 2009
012(Based on 44(e)) Materials handling equipment in this class relating to dredging, namely, floating dredges, portable flotation barges [, pontoons boats for dredging equipment ]SECTION 8 - CANCELLED—
016(Based on 44(e)) Printed instructional and teaching material in the field of materials dredging; printed matter, namely, magazines in the field of oil drilling; product manuals, in the field of dredging equipment; brochures in the field of dredging equipment; catalogs in the field of dredging equipment; publicity materials, namely, informational flyers about dredging equipment; posters; printed advertising materials, namely, pamphlets for the goods and services of othersSECTION 8 - CANCELLED—
037(Based on 44(e)) General dredging services in this class; repair, maintenance, and reconditioning of dredging machinery; project preparation, undertaking, carrying out and supervising relating to dredging operations, contracting for and conducting of dredging activities; construction of installations for removing sediment under water; dredging services in the nature of removing sediment under water; rental and installation of dredging equipment; and advisory and consultancy services relating to the aforesaidSECTION 8 - CANCELLED—
042(Based on 44(e)) Design and development of dredging machinery; technological advice in the fields of dredging; provision of evaluations, estimates, research, surveys and technical reports relating to dredging, namely, evaluation of dredging to assure compliance with industry standards; research in the field of dredging; conducting engineering surveys in the field of dredging and preparing related technical reports; developing and testing of dredging equipment; all for use in oil, mining, quarrying industries, dredging works, offshore works, namely, for the offshore oil industry, offshore wind farming, and offshore farming and aquaculture, wet soil treatment and/or wet soil movement, removing accumulated sedimentation from the bottom of water areas such as lakes, rivers, streams, canals, fish hatcheries, and industrial, commercial and agricultural settling basinsSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 7, 2025CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
Apr 28, 2024REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Aug 18, 2021NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Aug 18, 2021C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Aug 18, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 23, 2021E815TEAS SECTION 8 & 15 RECEIVED—
Apr 28, 2020REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Aug 6, 2015CORVREVIEW OF CORRESPONDENCE COMPLETE - POWER OF ATTORNEY ENTERED—
Aug 5, 2015EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Apr 28, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 24, 2015SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Mar 23, 2015CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Mar 20, 2015SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Mar 18, 2015AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Feb 11, 2015IUAFUSE AMENDMENT FILED—
Feb 11, 2015EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Feb 10, 2015DMCCDATA MODIFICATION COMPLETED—
Nov 25, 2014NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Sep 30, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 30, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 10, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 4, 2014EAAUTEAS AMENDMENT OF USE RECEIVED—
Aug 28, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 28, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 19, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 19, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 13, 2014NREVNOTICE OF REVIVAL - E-MAILED—
Aug 13, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 13, 2014PETGPETITION TO REVIVE-GRANTED—
Aug 13, 2014PROATEAS PETITION TO REVIVE RECEIVED—
Jan 25, 2014GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Jan 25, 2014GNSIINQUIRY TO SUSPENSION E-MAILED—
Jan 25, 2014CNSISUSPENSION INQUIRY WRITTEN—
Jul 24, 2013GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jul 24, 2013GNSLLETTER OF SUSPENSION E-MAILED—
Jul 24, 2013CNSLSUSPENSION LETTER WRITTEN—
Jul 19, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 19, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 19, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 9, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 9, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 9, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 8, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 8, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 2, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 3, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 3, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 3, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 2, 2013DOCKASSIGNED TO EXAMINER—
Dec 7, 2012ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 7, 2012REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Dec 4, 2012ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 4, 2012REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Dec 4, 2012CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Nov 29, 2012EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Sep 27, 2012AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—
Sep 21, 2012ALIEASSIGNED TO LIE—
Sep 13, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 11, 2012PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Sep 11, 2012NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance