USPTO serial 85740053
BTM
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Apr 8, 2014
- Examiner
- ALLEN, SUSAN EILEEN BI
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
Need help with BTM?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Marysville, MI
Marysville, MI
Marysville, MI
Marysville, MI
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Monte L. Falcoff
Monte L. Falcoff HARNESS, DICKEY & PIERCE, P.L.C.5445 CORPORATE DR STE 200TROY, MI 48098-2683United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal hardware, namely, [ swivel mounts for tubes, metal tubing, ] retainers, locators and brackets for securing machine tools, all for use in the field of metalworking, part assembly, manufacturing plant automation, or assembly plant automation; none for use in connection with machines, machine tools, and structural parts therefor in the fields of construction, road demolition and road repair, compactors, and horizontal and vertical conveying of construction materials | ACTIVE | Dec 31, 2009 |
| 007 | Metal bending machines; metal joining machines; metal working machines; power-operated metalworking machine tools, namely, punches and dies for metal joining; metal joining machines; metal working machines; power-operated metalworking machine tools, namely, workpiece fastening tools; power operated presses for metal working; power-operated presses for fastening and joining sheet metal; power-operated toggle presses for metal working; power-operated pierce presses and machines, all for metal working; powered presses for industrial machining; machine tools being powered clamps for industrial machining; [ fluid powered rotary actuators, namely, pneumatic valve actuators; ] powered universal presses for industrial machining; power-operated pneumatic presses for industrial machining; power-operated hydraulic presses for metal working; electrically actuated, power-operated presses for industrial machining; rotary-to-linear motion press machines and clamps being machine parts for industrial machining; fluid intensifying cylinders; machine tools, namely, clamps for use in the precision clamping of work pieces; machine tools, namely, fluid powered clamps for use in the precision clamping of work pieces; machine tools, namely, robotic clamps for use in the precision clamping of work pieces; machine tools, namely, pin locating clamps for use in the precision clamping of work pieces; machine tools, namely, grippers for use in the precision clamping of work pieces; machine tools, namely, fluid powered grippers; machine tools, namely, robotic grippers; machine tools, namely, fluid operated hand-held press tools; machine tools, namely, fluid pressure boosters; machine tools, namely, clinching tools and machines; machine tools, namely, clinching dies; machine tools, namely, clinching punches; rivet setting tools and machines, namely, power-operated punches and dies; [ machine tools, namely, robotic end arm effectors; powered machines to move weld gun tip cleaning tools; dump units, namely, rotary actuators for moving tools in a manufacturing plant; ] electronic process monitoring units for metalworking, joining, riveting, clinching and piercing machines comprised of programmable controllers, switches and sensors; robotic, machine and fluid manifolds for use with fluid-operated machine tools; machine parts, namely, [ swivel mounts, tubing, ] retainers, locators and brackets for securing machine tools; parts and fittings for the aforementioned goods; all for use in the field of metalworking, part assembly, manufacturing plant automation, or assembly plant automation; none for use in connection with machines, machine tools, and structural parts therefor in the fields of construction, road demolition and road repair, compactors, and horizontal and vertical conveying of construction materials | ACTIVE | Aug 31, 1966 |
| 008 | Hand tools, namely, punches and dies for metal joining; hand tools, namely, workpiece fastening tools in the nature of workpiece clinching and fastening tools; hand-operated presses for fastening and joining sheet metal; hand-operated toggle presses; hand-operated pierce presses; hand tools, namely, clinching dies; hand tools, namely, clinching punches; hand tools, namely, pierce nut insertion tools; hand tools, namely, rivet setting tools; all for use in the field of metalworking, part assembly, manufacturing plant automation, or assembly plant automation; none for use in connection with machines, machine tools, and structural parts therefor in the fields of construction, road demolition and road repair, compactors, and horizontal and vertical conveying of construction materials | ACTIVE | Dec 31, 2002 |
| 040 | [ Contract manufacturing in the field of metalworking, part assembly, manufacturing plant automation, and assembly plant automation; metalworking services, namely, machining, fabricating, grinding, finishing, assembly and inspection of metal parts for others in the field of part assembly, manufacturing plant automation, and assembly plant automation products ] | ACTIVE | Dec 31, 2013 |
| 042 | [ Engineering in the field of metalworking, part assembly, manufacturing plant automation, or assembly plant automation; product and engineering process design services in the field of metalworking, part assembly, manufacturing plant automation, or assembly plant automation; product development and engineering services for others in the field of metalworking, part assembly, manufacturing plant automation, or assembly plant automation; custom design and engineering of new products for others, namely, metalworking, manufacturing plant automation, and assembly plant automation products; design, inspection [ and testing ] of new products and manufacturing processes for others in the field of metalworking, part assembly, manufacturing plant automation, or assembly plant automation; custom design and engineering of tools and machines for others in the field of metalworking, part assembly, manufacturing plant automation, or assembly plant automation; [ testing in the field of metalworking, part assembly, manufacturing plant automation, ] or assembly plant automation; none for computer software design, computer programming, or maintenance of computer software; none for engineering, technical consulting, or scientific and industrial research in the fields of machines, machine tools, and machine equipment for use in construction, traffic area construction, airfield construction, railway construction, embankment construction, landfill construction, asphalt construction, earthmoving, hydraulic engineering, construction of tips and mining, road demolition and road repair, compactors, or the horizontal and vertical conveying of construction materials ] | ACTIVE | Dec 31, 2003 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by BTM COMPANY LLC
- Other trademarks owned by BTM Corporation
- Other trademarks owned by BTM Corporation
- Other trademarks owned by BTM Corporation
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 008
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named BTM
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 26, 2024 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Nov 26, 2024 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Nov 26, 2024 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Sep 24, 2024 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Jul 2, 2024 | PR89 | POST REGISTRATION ACTION MAILED - SEC. 8 & 9 | — |
| Jul 2, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Apr 5, 2024 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Apr 8, 2023 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Jun 3, 2020 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Jun 3, 2020 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Jun 3, 2020 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Apr 7, 2020 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Apr 8, 2019 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Aug 5, 2015 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Jul 15, 2015 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Apr 8, 2014 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 4, 2014 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Mar 3, 2014 | REGV | LAW OFFICE REGISTRATION REVIEW COMPLETED | — |
| Mar 3, 2014 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Feb 19, 2014 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Feb 17, 2014 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Feb 10, 2014 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jan 16, 2014 | IUAF | USE AMENDMENT FILED | — |
| Jan 16, 2014 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Jul 16, 2013 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| May 21, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 21, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 1, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 18, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 16, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 16, 2013 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 16, 2013 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 16, 2013 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 16, 2013 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 29, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 29, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 29, 2013 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Mar 12, 2013 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Mar 12, 2013 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 12, 2013 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Feb 20, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 20, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 19, 2013 | ALIE | ASSIGNED TO LIE | — |
| Feb 15, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 26, 2013 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 26, 2013 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 26, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 26, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 4, 2012 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 1, 2012 | NWAP | NEW APPLICATION ENTERED | — |