Drawing for LEDCOR GROUP

USPTO serial 85744120

LEDCOR GROUP

Reviewed by CopyMark Law Group

Reg. 4651185Status 800Registered
Filing date
Status date
Registration date
Dec 9, 2014
Examiner
RICHARDS, LESLIE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with LEDCOR GROUP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Alexis P. Grilli

Alexis P. Grilli Nixon Peabody LLP799 9th Street, NW, Suite 500Washington, DC 20001United States

Goods and services

ClassDescriptionStatusFirst use
037Construction of [ high rise condominiums, ] industrial buildings; [ office buildings, retail buildings, mixed office, retail and/or residential buildings; ] construction and installation project management, namely, carrying out and management of the carrying out of [ roads, road paving, gravel crushing projects, earth moving projects, mining projects, wind power projects, ] industrial buildings, [ commercial buildings, high rise residential buildings, office buildings, retail buildings, mixed office buildings, retail and residential buildings, ] power plants and power facilities, processing plants, industrial plants; construction and installation of underground piping for water, utilities, hydrocarbons and sewers; construction and installation of piping for plants; erection of pre-built structures, equipment rigging and lifting apparatus; fiber optics projects, namely, installation of cable data transmission, laying and installation of wire and cable for Internet, high-speed Internet and Internet protocol television systems, telephony and voice systems; mining projects, namely, mining extraction; reclamation projects, namely, mind reclamation services and installation of mined material processing facilities; construction and installation project management for buildings, industrial plants, [ road building, road paving, ] earth moving, mining, voice, internet, and video data transmission apparatus, pipeline, [ water treatment facilities, aqueduct and other municipal facilities, and equipment rigging and lifting in relation to construction and installation of the above projects; ] repair, electronic repair and emergency restoration and maintenance of telephony and voice systems [ ; Land development services, namely, planning and laying out of residential and/or commercial communities; development of raw or developable land and project management of same; Retrofitting of electrical, plumbing, heating, air conditioning, insulation, glass, roof and other component parts of buildings for better energy efficiency (and project management of same) ]ACTIVEDec 31, 2003
039[ Transportation of large equipment and industrial structures from prefabrication or fabrication facility to customer site via truck and rail transport in the fields of construction, energy, pipeline, mining, forestry, oil and gas, manufacturing ]SECTION 8 - CANCELLEDDec 31, 2003
042[ Civil, structural and process engineering for the design of road building, road paving, gravel crushing, earth moving, mining, mined material processing, wind power facilities and farms, industrial building, commercial building, high rise residential building, office building, retail building, mixed office, retail and/or residential building, power plant and power facility, processing plants, plants, underground piping for water, utilities, hydrocarbon and sewer, piping for plants, erection of pre-built structures, equipment rigging and lifting, fiber optics, cable data transmission, Internet, high-speed Internet and Internet protocol television systems, telephony and voice systems; Custom design and engineering of road building, road paving, gravel crushing, earth moving, mining, mined material processing, wind power facilities and farms, industrial building, commercial building, high rise residential building, office building, retail building, mixed office, retail and/or residential building, power plant and power facility, processing plants, plants, underground piping for water, utilities, hydrocarbon and sewer, piping for plants, erection of pre-built structures, equipment rigging and lifting, fiber optics, cable data transmission, Internet, high-speed Internet and Internet protocol television systems, and telephony and voice systems; Design for others in the fields of computer networks, software, and engineering for the fiber optics, cable data transmission, Internet, high-speed Internet, Internet protocol television systems, telephony and voice systems, road building, road paving, gravel crushing, earth moving, mining, mined material processing, industrial building, commercial building, high rise residential building, office building, retail building, mixed office, retail and/or residential building, power plant and power facility, underground piping for water, utilities, hydrocarbon and sewer, piping for plants, water treatment and purification plants, solid waste treatment plants, aqueducts, and other municipal infrastructure facilities; Engineering services for the construction of water treatment and purification plants, solid waste treatment plants, aqueducts, and other municipal infrastructure facilities; Engineering services, namely, engineering for the road building, road paving, gravel crushing, earth moving, mining, mined material processing, wind power facilities and farms, industrial building, commercial building, high rise residential building, office building, retail building, mixed office, retail and/or residential building, power plant and power facility, underground piping for water, utilities, hydrocarbon and sewer, piping for plants, erection of pre-built structures, equipment rigging and lifting, fiber optics, cable data transmission, Internet, high-speed Internet and Internet television systems, and telephony and voice systems; Providing planning and engineering services in the field of information and communications networks; Engineering and design services for the mining industry; Inspection of cable television systems, high-speed Internet in Internet protocol television systems, and telephony and voice systems ]SECTION 8 - CANCELLEDDec 31, 2003
045[ Seeking and obtaining entitlements, namely, government and regulatory permits, licenses and approvals for the construction, installation and carrying out of projects in the fields of road building, road paving, gravel crushing, earth moving, mining, mined material processing, wind power facilities and farms, industrial building, commercial building, high rise residential building, office building, retail building, mixed office, retail and/or residential building, power plant and power facility, processing plants, plants, underground piping for water, utilities, hydrocarbon and sewer, piping for plants, erection of pre-built structures, equipment rigging and lifting, fiber optics, cable data transmission, Internet, high-speed Internet and Internet protocol television systems, telephony and voice systems ]SECTION 8 - CANCELLEDDec 3, 2003

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 26, 2025NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Mar 26, 2025RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Mar 26, 202589AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Mar 21, 2025EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Feb 26, 2025PR89POST REGISTRATION ACTION MAILED - SEC. 8 & 9—
Feb 24, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 24, 2025ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Feb 24, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 24, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 24, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Feb 24, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Feb 24, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 24, 2024E89RTEAS SECTION 8 & 9 RECEIVED—
Dec 9, 2023REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Aug 1, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 1, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 1, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 1, 2023CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Aug 1, 2023COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jun 4, 2020NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Jun 4, 2020C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
May 20, 2020EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Apr 23, 2020PR23POST REGISTRATION ACTION MAILED - SEC. 8 & 15—
Apr 22, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 27, 2020E815TEAS SECTION 8 & 15 RECEIVED—
Dec 9, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 9, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Dec 9, 2019REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Dec 9, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 23, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 23, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 3, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 20, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 15, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 15, 2014DMCCDATA MODIFICATION COMPLETED—
Aug 13, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 12, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 12, 2014ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Feb 24, 2014GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Feb 24, 2014GNSIINQUIRY TO SUSPENSION E-MAILED—
Feb 24, 2014CNSISUSPENSION INQUIRY WRITTEN—
Feb 21, 2014RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Aug 21, 2013GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Aug 21, 2013GNSLLETTER OF SUSPENSION E-MAILED—
Aug 21, 2013CNSLSUSPENSION LETTER WRITTEN—
Jul 31, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 31, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 30, 2013ALIEASSIGNED TO LIE—
Jul 22, 2013ALIEASSIGNED TO LIE—
Jul 17, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 12, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 12, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 12, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 30, 2013DOCKASSIGNED TO EXAMINER—
Oct 10, 2012MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
Oct 9, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 5, 2012NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance