USPTO serial 85744120
LEDCOR GROUP
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Dec 9, 2014
- Examiner
- RICHARDS, LESLIE
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
Need help with LEDCOR GROUP?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Vancouver, B.C., CA
Vancouver, B.C., CA
Vancouver, B.C., CA
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Alexis P. Grilli
Alexis P. Grilli Nixon Peabody LLP799 9th Street, NW, Suite 500Washington, DC 20001United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Construction of [ high rise condominiums, ] industrial buildings; [ office buildings, retail buildings, mixed office, retail and/or residential buildings; ] construction and installation project management, namely, carrying out and management of the carrying out of [ roads, road paving, gravel crushing projects, earth moving projects, mining projects, wind power projects, ] industrial buildings, [ commercial buildings, high rise residential buildings, office buildings, retail buildings, mixed office buildings, retail and residential buildings, ] power plants and power facilities, processing plants, industrial plants; construction and installation of underground piping for water, utilities, hydrocarbons and sewers; construction and installation of piping for plants; erection of pre-built structures, equipment rigging and lifting apparatus; fiber optics projects, namely, installation of cable data transmission, laying and installation of wire and cable for Internet, high-speed Internet and Internet protocol television systems, telephony and voice systems; mining projects, namely, mining extraction; reclamation projects, namely, mind reclamation services and installation of mined material processing facilities; construction and installation project management for buildings, industrial plants, [ road building, road paving, ] earth moving, mining, voice, internet, and video data transmission apparatus, pipeline, [ water treatment facilities, aqueduct and other municipal facilities, and equipment rigging and lifting in relation to construction and installation of the above projects; ] repair, electronic repair and emergency restoration and maintenance of telephony and voice systems [ ; Land development services, namely, planning and laying out of residential and/or commercial communities; development of raw or developable land and project management of same; Retrofitting of electrical, plumbing, heating, air conditioning, insulation, glass, roof and other component parts of buildings for better energy efficiency (and project management of same) ] | ACTIVE | Dec 31, 2003 |
| 039 | [ Transportation of large equipment and industrial structures from prefabrication or fabrication facility to customer site via truck and rail transport in the fields of construction, energy, pipeline, mining, forestry, oil and gas, manufacturing ] | SECTION 8 - CANCELLED | Dec 31, 2003 |
| 042 | [ Civil, structural and process engineering for the design of road building, road paving, gravel crushing, earth moving, mining, mined material processing, wind power facilities and farms, industrial building, commercial building, high rise residential building, office building, retail building, mixed office, retail and/or residential building, power plant and power facility, processing plants, plants, underground piping for water, utilities, hydrocarbon and sewer, piping for plants, erection of pre-built structures, equipment rigging and lifting, fiber optics, cable data transmission, Internet, high-speed Internet and Internet protocol television systems, telephony and voice systems; Custom design and engineering of road building, road paving, gravel crushing, earth moving, mining, mined material processing, wind power facilities and farms, industrial building, commercial building, high rise residential building, office building, retail building, mixed office, retail and/or residential building, power plant and power facility, processing plants, plants, underground piping for water, utilities, hydrocarbon and sewer, piping for plants, erection of pre-built structures, equipment rigging and lifting, fiber optics, cable data transmission, Internet, high-speed Internet and Internet protocol television systems, and telephony and voice systems; Design for others in the fields of computer networks, software, and engineering for the fiber optics, cable data transmission, Internet, high-speed Internet, Internet protocol television systems, telephony and voice systems, road building, road paving, gravel crushing, earth moving, mining, mined material processing, industrial building, commercial building, high rise residential building, office building, retail building, mixed office, retail and/or residential building, power plant and power facility, underground piping for water, utilities, hydrocarbon and sewer, piping for plants, water treatment and purification plants, solid waste treatment plants, aqueducts, and other municipal infrastructure facilities; Engineering services for the construction of water treatment and purification plants, solid waste treatment plants, aqueducts, and other municipal infrastructure facilities; Engineering services, namely, engineering for the road building, road paving, gravel crushing, earth moving, mining, mined material processing, wind power facilities and farms, industrial building, commercial building, high rise residential building, office building, retail building, mixed office, retail and/or residential building, power plant and power facility, underground piping for water, utilities, hydrocarbon and sewer, piping for plants, erection of pre-built structures, equipment rigging and lifting, fiber optics, cable data transmission, Internet, high-speed Internet and Internet television systems, and telephony and voice systems; Providing planning and engineering services in the field of information and communications networks; Engineering and design services for the mining industry; Inspection of cable television systems, high-speed Internet in Internet protocol television systems, and telephony and voice systems ] | SECTION 8 - CANCELLED | Dec 31, 2003 |
| 045 | [ Seeking and obtaining entitlements, namely, government and regulatory permits, licenses and approvals for the construction, installation and carrying out of projects in the fields of road building, road paving, gravel crushing, earth moving, mining, mined material processing, wind power facilities and farms, industrial building, commercial building, high rise residential building, office building, retail building, mixed office, retail and/or residential building, power plant and power facility, processing plants, plants, underground piping for water, utilities, hydrocarbon and sewer, piping for plants, erection of pre-built structures, equipment rigging and lifting, fiber optics, cable data transmission, Internet, high-speed Internet and Internet protocol television systems, telephony and voice systems ] | SECTION 8 - CANCELLED | Dec 3, 2003 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Ledcor IP Holdings Ltd.
- Other trademarks owned by Ledcor IP Holdings Ltd.
- Other trademarks owned by Ledcor IP Holdings Ltd.
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 042
- Other trademarks in Class 045
- Similar marks named LEDCOR GROUP
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 26, 2025 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Mar 26, 2025 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Mar 26, 2025 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Mar 21, 2025 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Feb 26, 2025 | PR89 | POST REGISTRATION ACTION MAILED - SEC. 8 & 9 | — |
| Feb 24, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Feb 24, 2025 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Feb 24, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 24, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Feb 24, 2025 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Feb 24, 2025 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Feb 24, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Oct 24, 2024 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Dec 9, 2023 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Aug 1, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 1, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 1, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 1, 2023 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Aug 1, 2023 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Jun 4, 2020 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Jun 4, 2020 | C15P | REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| May 20, 2020 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Apr 23, 2020 | PR23 | POST REGISTRATION ACTION MAILED - SEC. 8 & 15 | — |
| Apr 22, 2020 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Feb 27, 2020 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Dec 9, 2019 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 9, 2019 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Dec 9, 2019 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Dec 9, 2014 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 23, 2014 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 23, 2014 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 3, 2014 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 20, 2014 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 15, 2014 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 15, 2014 | DMCC | DATA MODIFICATION COMPLETED | — |
| Aug 13, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 12, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 12, 2014 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Feb 24, 2014 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| Feb 24, 2014 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| Feb 24, 2014 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Feb 21, 2014 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Aug 21, 2013 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Aug 21, 2013 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Aug 21, 2013 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Jul 31, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 31, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 30, 2013 | ALIE | ASSIGNED TO LIE | — |
| Jul 22, 2013 | ALIE | ASSIGNED TO LIE | — |
| Jul 17, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 12, 2013 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 12, 2013 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 12, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 30, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 10, 2012 | MDSC | NOTICE OF DESIGN SEARCH CODE MAILED | — |
| Oct 9, 2012 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 5, 2012 | NWAP | NEW APPLICATION ENTERED | — |