USPTO serial 85770188
CONSEP
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jun 10, 2014
- Examiner
- ABRAMS, JACQUELINE WILLETTE
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
Need help with CONSEP?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
New South Wales, AU
New South Wales 2164, AU
New South Wales 2164, AU
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Ira E. Silfin
Ira E. Silfin Mandelbaum Silfin LLC222 Bloomingdale RoadSuite 120White Plains, NY 10605Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | building extensions (structures) of metal; building frameworks of metal; building panels of metal; building structures of metal; metal beams for building purposes; metal building beams; metal building blocks; deck profiles of metal; decking of metal; access platforms of metal; metal structures for use as platforms; mobile platforms of metal; platform staging of metal for use with scaffolding; platform steps of metal for use with scaffolding; platforms of metal; platforms, prefabricated, of metal; structural platforms of metal; studio platform structures of metal; work platforms of metal; work platforms of metal; working platforms (structures); gutter connection pieces of metal; gutter supports of metal; guttering of metal; gutters of metal; metallic gutters; rain gutters of metal; roof gutters of metal; chutes of metal; bins of metal; rubbish containers of metal | ACTIVE | — |
| 007 | machines for drying and cooling; motors and engines except for land vehicles for use in the mining, construction, water and wastewater industries; machine coupling and transmission components (except for land vehicles) for use in the mining, construction, water and wastewater industries; processing plants, being modular processing units for the recovery of specific minerals from ores, wastewater and or other mineral containing substances in the mining, construction, water and wastewater industries; hoists; elevating or lifting work platforms | ACTIVE | — |
| 037 | mining extraction services; construction, repair, maintenance and installation services relating to buildings and building construction equipment ; construction, repair, maintenance and installation services regarding industrial plants and machines; civil engineering services; rental and hire of apparatus for use in the construction and repair of buildings; rental and hire of building apparatus and building tools; platform rental; rental of platforms and scaffolding; rental of cranes; information and advisory services in connection with all the foregoing | ACTIVE | — |
| 040 | material treatment services, namely, mechanical and chemical processing services, refining and mining services in this class; water treatment services; extraction of metal ions from solutions using organic solvents; processing of minerals, heavy minerals and phosphates; treatment and consultation services related to recovery of metals and minerals; custom manufacture of modular processing plants for the recovery of specific minerals; upgrading and agglomeration of ores being the separation and treatment or minerals; specialist metal recovery services; advisory services in respect of the wet separation of heavy minerals and solvents, extraction technologies, pelletising of iron or radiometric sorting of ore, production of smokeless fuels and stainless steel production; upgrading and agglomeration of ores; information and advisory services in connection with all the foregoing | ACTIVE | — |
| 042 | scientific and technological services and research and design relating thereto; engineering services; planning and consultancy in the field of building and construction drafting; engineering; civil engineering design for the building of industrial and mechanical installations; providing of expert opinion; technical consultancy and providing of expertise; design, technical development and technical planning of industrial installations and machines; technical project management for the projection of industrial installations and machines; material testing; industrial analysis and research services; electronic saving of data; rental of computer capacity for data processing; information and advisory services in connection with all the foregoing | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Consep Pty Ltd
- Other trademarks owned by Consep Pty Ltd
- Other trademarks owned by Consep Pty Ltd
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named CONSEP
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 23, 2024 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Aug 23, 2024 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Aug 23, 2024 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Aug 23, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 9, 2024 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Jun 10, 2023 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Jan 6, 2021 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Jan 6, 2021 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Jan 5, 2021 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Jan 4, 2021 | PR23 | POST REGISTRATION ACTION MAILED - SEC. 8 & 15 | — |
| Jan 4, 2021 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Oct 7, 2020 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Jun 10, 2019 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Jan 12, 2019 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 12, 2019 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jun 10, 2014 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 6, 2014 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| May 6, 2014 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Apr 30, 2014 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Apr 30, 2014 | D1BR | TEAS DELETE 1(B) BASIS RECEIVED | — |
| Jan 7, 2014 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Dec 28, 2013 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 12, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 12, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 23, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 9, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Oct 8, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 8, 2013 | DMCC | DATA MODIFICATION COMPLETED | — |
| Sep 13, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 13, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 5, 2013 | ALIE | ASSIGNED TO LIE | — |
| Sep 3, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 5, 2013 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 5, 2013 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 5, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 1, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 8, 2012 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 6, 2012 | NWAP | NEW APPLICATION ENTERED | — |