Drawing for AB INDUSTRY

USPTO serial 85800107

AB INDUSTRY

Reviewed by CopyMark Law Group

Reg. 4483572Status 710
Filing date
Status date
Registration date
Feb 18, 2014
Examiner
EULIN, INGRID C
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with AB INDUSTRY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael Diaz

MICHAEL DIAZ DIAZ AND ASSOCIATES555 REPUBLIC DR STE 200PLANO, TX 75074-5469UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Automated wrapper in-feed machine; Conveyors; Electric pumps; Electric welding machines; Heat exchangers being parts of machines; Incubators for eggs; Industrial robots; Machine couplings and transmission components except for land vehicles; Material handling machines, namely, palletizers, case elevators, automatic pallet dispensing machines and automatic slip sheet dispensing machines; Motor and engines except for land vehicles; Pump control valves; Pumps for machines; Valves being parts of machines; Winding machines, packaging machines, conveying machines, particularly conveyor belts, roller conveyors and carrier rollers for web materialsSECTION 8 - CANCELLEDAug 1, 2012
009Access control and alarm monitoring systems; Alarm monitoring systems; Analysis instruments for photogrammetric purposes; Apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current; Apparatus and instruments for weighing; Apparatus for broadcasting, recording, transmission or reproduction of sound or images; Automated process control system, namely, micro-processor based hardware and software used to monitor the status of industrial machinery, namely turbines, generators and compressors; Automatic valves; Batteries; Cameras; Computer controls for the operation of machine tools; Computer hardware; Computer hardware for communicating audio, video and data between computers via a global computer network, wide-area computer networks, and peer-to-peer computer networks; Computers; Electric cables; Electric connectors; Electric control panels; Electric installations for the remote control of industrial operations; Electric junction boxes; Electric relays; Electric warning light systems; Electrical terminal blocks; Electrical transformers; Electro-optical instruments for use in inspection and measurement of industrial components; Electronic apparatus for the remote control of industrial operations; Electronic control systems for machines; Electronic data processing apparatus; Electronic video surveillance products, namely, electronic components of security systems; Fire alarms; Fire extinguishing apparatus; Industrial automation controls; Integrated circuits; Junction sleeves for electric cables; Metal detectors; Optical cables; Optical fibers; Programmable logic controller (PLC); Rectifiers; Scales; Sheaths for electric cables; Software for monitoring and controlling communication between computers and automated machine systems; Tool measuring instruments; Video monitors; Voltage regulators for electric powerSECTION 8 - CANCELLEDAug 1, 2012
037Building construction and repair; Construction project management services; Electrical repairs and installation of electrical and electronic equipment; Installation and maintenance of electrical and lighting systems, robot stations, piping, pumps, shields, tanks, containers, filters, heat exchangers, conveyors, robots, palletizers, cleaning stations, Big Bag stations; Installation of conveying lines and systems; Installation, maintenance and repair of manual assembling stations, stations for automatic assembly, heating, cooling, drying and ventilation systems,; Planning and laying out of production facilitiesSECTION 8 - CANCELLEDAug 1, 2012
042Installation of electrical and electronic software; Computer hardware and software design; Computer network design for others; Computer programming services for control systems; Computer software design and updating; Computer systems analysis; Consulting in the field of designing industrial automation systems, monitoring systems, robotized machines, cable trays, electrical and piping installations, electricity and lighting control systems, complex installation in building and property security systems, alarm systems, fire protection and extinguishing systems; Creation of control programs for electric operation control and drive modules; Design for others in the field of mechanical assemblies, conveying and transporting lines and positioning in automatic assembly; Design of production facilities; Quality management services, namely, quality evaluation and analysis, quality assurance, and quality control, in the field of manufacturing and production management systems; Research and development in the field of hardware and softwareSECTION 8 - CANCELLEDAug 1, 2012

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 25, 2020C8..CANCELLED SEC. 8 (6-YR)—
Feb 18, 2019REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Feb 18, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 3, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 3, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 13, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 30, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Oct 30, 2013ALIEASSIGNED TO LIE—
Oct 15, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 24, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 24, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 24, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 27, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 27, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 27, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 27, 2013DOCKASSIGNED TO EXAMINER—
Dec 21, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 14, 2012NWAPNEW APPLICATION ENTERED—