USPTO serial 85814639
M MILBANK
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jul 5, 2016
- Examiner
- MULLEN, MARK
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with M MILBANK?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $748*
Plus Government fees of $1,700
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
KANSAS CITY, MO, US
KANSAS CITY, MO, US
KANSAS CITY, MO, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
James J. Cronin
James J. Cronin Stinson LLP1201 Walnut St., Suite 2900KANSAS CITY, MO 64106United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | METAL BOXES, NAMELY, EMPTY METAL BOXES FOR USE IN HOLDING TELEPHONE LINE JUNCTIONS, CABLE TELEVISION JUNCTIONS, ELECTRICAL JUNCTIONS, POWER OUTLETS, TRANSFORMERS, GENERAL DUTY ELECTRICAL SWITCHES, SAFETY SWITCHES, TEST SWITCHES, CONDUIT HUBS, WIREWAY GUTTERS, ELECTRICAL DISCONNECT DEVICES, CONTROL PANELS, INSTRUMENTATION PANELS, CURRENT TRANSFORMERS, DISTRIBUTION UNIT SUBSTATIONS, CIRCUIT BREAKERS, RESIDENTIAL AND COMMERCIAL ELECTRIC METERS AND ELECTRICAL WIRING; AND EMPTY METAL ELECTRICAL ENCLOSURES FOR USE IN HOLDING ELECTRICAL APPARATUSES, NAMELY, ELECTRICAL DISCONNECT DEVICES, ELECTRICAL TERMINALS, CIRCUIT BREAKERS, TEST SWITCHES, GENERAL DUTY ELECTRICAL SWITCHES, SAFETY SWITCHES, ELECTRIC METERS, METER MAINS, AND OUTLET PEDESTALS | ACTIVE | Dec 31, 2013 |
| 007 | [Electricity generators; home standby electricity generators; portable electricity generators; machines, motors, engines and components thereof for renewable energy power generation, storage and distribution] | SECTION 8 - CANCELLED | Dec 31, 2013 |
| 009 | [Battery chargers for electric vehicles;] apparatus and instruments for conducting, switching, transforming, accumulating, regulating and/or controlling electrical current; electrical apparatuses, namely, electrical disconnect devices, electrical terminals, circuit breakers, test switches, meter mains for electricity metering and control primarily at the electrical service entrance to a facility or residence, and outlet pedestals for temporary site power supply, mobile home park site supply, and recreational vehicle site supply; electrical components, namely, vertical gang sockets, horizontal gang sockets, watt-hour meter sockets, power outlets, connectors, electrical terminals, transformers, trans-sockets for electricity metering at industrial facilities; termination lugs and bypass links for the installation and testing of electricity metering equipment; triplex ground assemblies for attaching the grounding electrode conductor to electricity metering equipment; electrical components, namely, vertical gang sockets, horizontal gang sockets, termination lugs, bypass links, triplex grounds, and jaw clamping levers, all sold as a unit; [electrical transfer switches for electricity generators; power management system upgrades for electricity generators comprised of integrated circuits and electrical switches; integrated switches for transferring power; electrical and electronic apparatus and components for renewable energy power generation, storage and distribution; charging stations for charging electric vehicles; transfer switches for transferring and/or distributing electrical energy from various sources; software for use in energy management;] electrical and electronic components for all of the foregoing | ACTIVE | Dec 31, 2013 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by MILBANK MANUFACTURING COMPANY
- Other trademarks owned by MILBANK MANUFACTURING COMPANY
- Other trademarks owned by MILBANK MANUFACTURING COMPANY
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 009
- Similar marks named M MILBANK
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 19, 2026 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Aug 19, 2026 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Aug 19, 2026 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Aug 19, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 24, 2026 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Jul 5, 2025 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Jan 22, 2023 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Jan 22, 2023 | C15P | REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Dec 31, 2022 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 17, 2022 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Jul 5, 2021 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Jul 5, 2016 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 3, 2016 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Jun 2, 2016 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Jun 1, 2016 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| May 9, 2016 | IUAF | USE AMENDMENT FILED | — |
| May 9, 2016 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Dec 8, 2015 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Dec 7, 2015 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Nov 17, 2015 | EXT4 | SOU EXTENSION 4 FILED | — |
| Nov 17, 2015 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Nov 17, 2015 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 22, 2015 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Apr 21, 2015 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Apr 14, 2015 | EXT3 | SOU EXTENSION 3 FILED | — |
| Apr 14, 2015 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 3, 2014 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Dec 2, 2014 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Dec 1, 2014 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Oct 30, 2014 | EXT2 | SOU EXTENSION 2 FILED | — |
| Oct 30, 2014 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Oct 30, 2014 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 29, 2014 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Apr 27, 2014 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Apr 27, 2014 | EXT1 | SOU EXTENSION 1 FILED | — |
| Apr 27, 2014 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 27, 2014 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 19, 2013 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Sep 24, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 24, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 4, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 17, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 16, 2013 | ALIE | ASSIGNED TO LIE | — |
| Aug 5, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 5, 2013 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 5, 2013 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 5, 2013 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 5, 2013 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 24, 2013 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 24, 2013 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 24, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 17, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 15, 2013 | MDSC | NOTICE OF DESIGN SEARCH CODE MAILED | — |
| Jan 14, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 7, 2013 | NWAP | NEW APPLICATION ENTERED | — |