Drawing for ARANER

USPTO serial 85834276

ARANER

Reviewed by CopyMark Law Group

Reg. 4627032Status 710
Filing date
Status date
Registration date
Oct 28, 2014
Examiner
CASSIDY, COLLEEN MULCRONE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ARANER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Ruy Garcia-Zamor, Esquire

RUY GARCIA-ZAMOR, ESQUIRE GARCIA-ZAMOR INTELLECTUAL PROPERTY LAW12960 LINDEN CHURCH RDCLARKSVILLE, MD 21029-1123UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
011Air conditioning apparatus; heat accumulators; steam accumulators; electric air deodorizing apparatus; air cooling apparatus; air driers, namely, dehumidifiers; air conditioning installations; air filtering installations; ionization apparatus for the treatment of air or water; air valves for steam heating installations; air purifying apparatus and machines; air sterilizers; boiler pipes for heating installations; boilers, other than parts of machines, namely, electrical boilers, furnace boilers, Boilers for heating installations, Heating boilers, industrial boilers; burners, namely, gas burners, burners for lamps; gas condensers, other than parts of machines; refrigerating containers; cooling installations and machines for liquids; desalination plants; refrigerating display cabinets; drying apparatus and installations, namely, drying apparatus for use in heating, ventilation systems, air conditioning systems and refrigeration systems, touchless hand drying apparatus, forage drying apparatus; heating elements; evaporators; expansion tanks for central heating installations; filters, namely, water filters, filters for air conditioning; industrial air filter machines; freezers; gas scrubbers; gas boilers; glue-heating appliances, namely, electric hot glue melting pots; heat pumps; heaters for heating irons; immersion heaters; heating apparatus for vehicles, pavement, industrial plants; heating installations; incinerators; lamps; lanterns for lighting; lighting apparatus and installations; microwave ovens for industrial purposes; oxhydrogen burners; petrol burners; pipes, namely, pipes for heating boilers; heat pipes to cool heat producing components; pressure water tanks; refrigerating cabinets; refrigerating chambers; refrigerating appliances and installations; refrigerators; heat regenerators; safety lamps; solar thermal collectors; solar furnaces; fabric steamers; swimming pool chlorinating apparatus; taps; electric torches for lighting; level controlling valves in tanks; thermostatic valves; lighting, namely, lighting fixtures, lighting apparatus for vehicles, lighting fixtures with motion detection; ventilation hoods; ventilation installations and apparatus, namely, ventilating exhaust fans, heat recovery ventilators, ventilating fans for commercial and industrial use, ventilating louvers; hydro-cooling systems comprised primarily of reservoirs, pumps, filters and cleaners; solar energy based cooling apparatus; solar-powered cooling units; vacuum cooling systems comprised primarily of reservoirs, pumps, filters and cleaners; spiral freezers; solar thermal air systems for heating purposesSECTION 8 - CANCELLED—
037Construction service, namely, construction of buildings, construction management, construction of facilities energy plants; plant construction, maintenance and construction project management services for businesses in the energy production and transmission sector; repair services, namely, repair services for installations of heating, cooling and environmental control systems; construction consultancy; all aforementioned services in the field of installations for the production, storage and distribution of energySECTION 8 - CANCELLED—
042Industrial analysis and research services in the field of installations for the production, storage and distribution of energy; design and development of computer hardware and software; engineering services; services provided by engineers who are responsible for evaluations, estimates, research and reports in the technological and industrial fields; research and development of new products; consulting services and advice on engineering; technology consulting services and advice in the field of installations for the production, storage and distribution of energySECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 4, 2021C8..CANCELLED SEC. 8 (6-YR)—
May 20, 2020ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Oct 28, 2019REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Oct 27, 2017TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 28, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 12, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 12, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 23, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 5, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 1, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 16, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 16, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 10, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 13, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 13, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 13, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 22, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 22, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 15, 2013ALIEASSIGNED TO LIE—
Nov 11, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 15, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 15, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 15, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 9, 2013DOCKASSIGNED TO EXAMINER—
Feb 1, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 31, 2013NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance