USPTO serial 85834574
D12
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Sep 29, 2015
- Examiner
- MORRIS, KRISTINA KLOIBER
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with D12?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Susan Hwang
SUSAN HWANG SHEPPARD MULLIN RICHTER & HAMPTON LLP333 S HOPE ST43RD FLOORLOS ANGELES, CA 90071-1422Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal structures, namely, towers and masts of metal for wind energy installations | SECTION 8 - CANCELLED | — |
| 007 | Alternators for wind energy installations; machine parts, namely, anti-vibration mountings; machine parts, namely, axles for machines; parts of machines, namely, blade holders for wind energy installations; machine parts, namely, blades; machine parts, namely, blades for wind energy installations; machine parts, namely, rotors for wind energy installations; brakes for industrial machines, namely, for wind energy installations; brakes for machines, namely, for wind energy installations; brushes being parts of generators for wind energy installations; brushes being parts of motors, generators and dynamos for wind energy installations; machine parts, namely, casing rings; industrial machine parts, namely, casings; hydraulic controls for machines, motors and engines; crankcases for machines, motors and engines, namely, for wind energy installations; drive units, other than for land vehicles, namely, fluid drive couplings, gear drives and variable speed drives for wind energy installations; drives for machines, namely, for wind energy installations; electric drives for motors for wind energy installations; electric generator power sets for wind energy installations; electric generators for wind energy installations; electrical drives for machines, namely, for wind energy installations; engine speed governors, namely, for wind energy installations; structural parts of machines, namely, gear assemblies, for wind energy installations; gear boxes for hydraulic transmissions for wind energy installations; gear boxes for wind energy installations; gear cases for wind energy installations; gear motors for wind energy installations; gear units for wind energy installations; gear units for power transmissions for wind energy installations; geared electric motors for wind energy installations, gearing for machines, namely, for wind energy installations; generators for wind turbines; housings for machines, namely, for wind energy installations; hydrostatic drives, namely, for wind energy installations; machine holders being stands being adapted for the machine, namely, for wind energy installations; nacelles for wind energy installations; planetary gear transmissions, other than for land vehicles; power installations, namely, generators; power shift transmissions other than for land vehicles; Power supply apparatus, namely, generators; power supply devices, namely, generators; power transmissions and gearing for machines not for land vehicles; cooling radiators for motors and engines; regulators being machine parts; shaft mounted gear units other than for land vehicles; shafts for machines; mechanical speed governors for machines, engines and motors; speed governors for machines, engines and motors; stands for machines; transmission control mechanisms; transmission members, other than for land vehicles; variable speed drives for machines; variable speed transmissions other than for land vehicles; wind-powered electricity generators; all the aforesaid goods for wind energy installations | SECTION 8 - CANCELLED | — |
| 009 | Electrical controllers; electronic regulators for controlling power output of wind energy installations; electronic transformers; electronic instruments, namely, power analyzers; power capacitors; power line conditioners; electric power controlling apparatus; electric power dividers; electric power meters; power packs, namely, transformers; power switches; revolution counters; speed reducers, namely, electronic speed controllers for limiting rotor speed of a wind energy installation; electronic speed reducers for reducing speed; electrical speed regulators for regulating speed; electronic speed regulators for regulating speed; step-up transformers; electrical power devices, namely, tap changers for electric transformers; transformers; and electricity transformers | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by DeWind Europe GmbH
- Other trademarks owned by DeWind Europe GmbH
- Other trademarks owned by DeWind Europe GmbH
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 009
- Similar marks named D12
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 8, 2022 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Sep 29, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 26, 2015 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| Aug 23, 2015 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jul 24, 2015 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Jul 24, 2015 | D1BR | TEAS DELETE 1(B) BASIS RECEIVED | — |
| Mar 3, 2015 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jan 6, 2015 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 17, 2014 | NPUB | NOTICE OF PUBLICATION | — |
| Nov 29, 2014 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Nov 24, 2014 | EXPT | EXPARTE APPEAL TERMINATED | — |
| Nov 24, 2014 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 3, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 9, 2014 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Oct 9, 2014 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Sep 10, 2014 | EXPI | EX PARTE APPEAL-INSTITUTED | — |
| Sep 10, 2014 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| Sep 9, 2014 | EXAF | EXPARTE APPEAL RECEIVED AT TTAB | — |
| Aug 18, 2014 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Aug 15, 2014 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 15, 2014 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 24, 2014 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Jul 24, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 17, 2014 | PAPER RECEIVED | — | |
| Jan 13, 2014 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 13, 2014 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 11, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 11, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 2, 2013 | ALIE | ASSIGNED TO LIE | — |
| Nov 20, 2013 | PAPER RECEIVED | — | |
| May 17, 2013 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 16, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 9, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 5, 2013 | MPMK | NOTICE OF PSEUDO MARK MAILED | — |
| Feb 2, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 31, 2013 | NWAP | NEW APPLICATION ENTERED | — |