Drawing for IDIS&A INTERNATIONAL DEVELOPMENT INTEGRATION STANDARDIZATION AND ACCREDITATION

USPTO serial 85835997

IDIS&A INTERNATIONAL DEVELOPMENT INTEGRATION STANDARDIZATION AND ACCREDITATION

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
SMITH, REBECCA A
Law office
TMO LAW OFFICE 110 - EXAMINING ATTORNEY ASSIGNED

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with IDIS&A INTERNATIONAL DEVELOPMENT INTEGRATION STANDARDIZATION AND ACCREDITATION?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
042Accreditation services, namely, developing, evaluating, and testing for Low voltage power lines carrier (PLC) and automatic meter reading (AMR) equipment as meters, data concentrator and PLC communication module for the purpose of accreditation and Technical testing service; Accreditation services, namely, developing, evaluating, and testing for broadband over Medium voltage power line (BPL) and Advanced Metering Infrastructure (AMI) equipment as meters, data concentrator, Couplers, Nods and BPL communication module for the purpose of accreditation and Technical testing service; Technical writing for others, namely, developing, evaluating, and writing specification and standard for Low voltage power lines carrier (PLC) and automatic meter reading (AMR) equipment as meters, data concentrator and PLC communication module for the purpose of Technical writing Service; Technical writing for others, namely, developing, evaluating, and writing specification and standard for broadband over Medium voltage power line (BPL) and Advanced Metering Infrastructure (AMI) equipment as meters, data concentrator and PLC communication module for the purpose of Technical writing Service; Technical engineering, namely, developing, design and specification for Low voltage power lines carrier (PLC) and automatic meter reading (AMR) equipment as meters, data concentrator and PLC communication module for technical engineering purpose; Technical engineering, namely, developing, design and specification for broadband over Medium voltage power line (BPL) and Advanced Metering Infrastructure (AMI) equipment as meters, data concentrator, Couplers, Nods and BPL communication module for technical engineering purpose; Technical data analysis services, namely, developing, evaluating and Quality control for Low voltage power lines carrier (PLC) and automatic meter reading (AMR) equipment as meters, data concentrator and PLC communication module for the purpose of Technical data analysis services; Technical data analysis services, namely, developing, evaluating and Quality control for broadband over Medium voltage power line (BPL) and Advanced Metering Infrastructure (AMI) equipment as meters, data concentrator, Couplers, Nods and BPL communication module for the purpose of Technical data analysis services; Software design and development, namely, design, developing, updating and testing for Automatic Meter Reading (AMR) system software as management system, power control, IT and billing for the purpose of Software design and development; Software design and development, namely, design, developing, updating and testing for Advanced Metering Infrastructure (AMI) system software as management system, power control, IT and billing for the purpose of Software design and developmentACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB2): The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.

DateCodeEventWhat it means
May 1, 2014MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
May 1, 2014ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jan 11, 2014WOAGWITHDRAWAL OF ATTORNEY GRANTED—
Jan 11, 2014WOARTEAS WITHDRAWAL OF ATTORNEY RECEIVED—
Sep 18, 2013GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Sep 18, 2013GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 18, 2013CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 27, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 27, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 27, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 21, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 21, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 21, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 14, 2013DOCKASSIGNED TO EXAMINER—
Feb 6, 2013MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED—
Feb 5, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 2, 2013NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance