Drawing for WINGYRO

USPTO serial 85864716

WINGYRO

Reviewed by CopyMark Law Group

Reg. 4461344Status 710
Filing date
Status date
Registration date
Jan 7, 2014
Examiner
HARDY LUDLOW, TARAH KIM
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with WINGYRO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

J. Scott Gerien

J. SCOTT GERIEN DICKENSON, PEATMAN & FOGARTY1455 1ST ST STE 301NAPA, CA 94559-2822UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Wind power generation systems in the nature of generators for generating electricity from wind; wind turbines; wind mills; turbines for power generation; vertical axis wind turbines; vertical axis wind mills; vertical axis wind power plants; horizontal axis wind turbines; horizontal axis wind power plants; machine and structural parts for wind-operated machines, wind power generators, wind power generator collectors, wind turbines, windmills, turbines for power generation, vertical axis wind mills, vertical axis wind turbines, horizontal axis wind turbines, horizontal axis wind-operated machines, and wind power propulsion machines, namely, towers, masts, housings, casings, cowlings, main shafts, universal joints, transmissions, clutches and electric generators, blade hubs, blades, rotation devices for rotating the aforesaid machines and devices to face the wind, yaw rings and gears, devices for setting the pitch of the wings, brakes and brake devices; pumps as parts of machines; air pumps as parts of machines; water pumps for pumping water or other fluids; wind-operated pumps for pumping water or other fluids; wind operated motors and engines, except for land vehicles; components, parts and fittings for all the aforesaid goodsSECTION 8 - CANCELLED
037Erection, installation, servicing, maintenance and repair of wind power plants, wind-operated machines, wind power generation systems, wind power collection systems, wind turbines, wind mills, turbines for power generation, vertical axis wind turbines, vertical axis wind mills, vertical axis wind power plants and other vertical axis wind-operated machines, horizontal axis wind turbines, horizontal axis wind power plants and other horizontal axis wind-operated machines, wind power propulsion systems except for land vehicles, and components, parts and fittings therefor; advisory, consultancy and information in connection with all the aforesaid servicesSECTION 8 - CANCELLED
040Custom construction of wind power plants, wind-operated machines, wind power generation systems, wind power collection systems, wind turbines, wind mills, turbines for power generation, vertical axis wind turbines, vertical axis wind mills, vertical axis wind power plants and other vertical axis wind-operated machines, horizontal axis wind turbines, horizontal axis wind power plants and other horizontal axis wind-operated machines, wind power propulsion systems except for land vehicles, and components, parts and fittings therefor; advisory, consultancy and information services relating to all the aforesaid servicesSECTION 8 - CANCELLED
042Design and development of and scientific research, testing and analysis in connection with, wind power plants, wind-operated machines, wind power generation systems, wind power collection systems, wind turbines, wind mills, turbines for power generation, vertical axis wind turbines, vertical axis wind mills, vertical axis wind power plants and other vertical axis wind-operated machines, horizontal axis wind turbines, horizontal axis wind power plants and other horizontal axis wind-operated machines, wind power propulsion systems except for land vehicles, and components, parts and fittings therefor; technical services in the nature of technical research and development concerning wind power plants, wind-operated machines, wind power generation systems, wind power collection systems, wind turbines, wind mills, turbines for power generation, vertical axis wind turbines, vertical axis wind mills, vertical axis wind power plants and other vertical axis wind-operated machines, horizontal axis wind turbines, horizontal axis wind power plants and other horizontal axis wind-operated machines, wind power propulsion systems except for land vehicles, and components, parts and fittings therefor; advisory, consultancy and information services relating to all the aforesaid servicesSECTION 8 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 14, 2020C8..CANCELLED SEC. 8 (6-YR)
Jan 7, 2019REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
Jan 7, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 22, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Oct 22, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 2, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Sep 14, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Sep 13, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Sep 13, 2013XAECEXAMINER'S AMENDMENT ENTERED
Sep 13, 2013GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Sep 13, 2013GNEAEXAMINERS AMENDMENT E-MAILED
Sep 13, 2013CNEAEXAMINERS AMENDMENT -WRITTEN
Sep 13, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Sep 13, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Sep 6, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 14, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 14, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 14, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 13, 2013DOCKASSIGNED TO EXAMINER
Apr 25, 2013AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED
Apr 17, 2013ALIEASSIGNED TO LIE
Apr 11, 2013PARITEAS VOLUNTARY AMENDMENT RECEIVED
Mar 8, 2013MPMKNOTICE OF PSEUDO MARK E-MAILED
Mar 7, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Mar 5, 2013NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance