USPTO serial 85864716
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
J. Scott Gerien
J. SCOTT GERIEN DICKENSON, PEATMAN & FOGARTY1455 1ST ST STE 301NAPA, CA 94559-2822UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Wind power generation systems in the nature of generators for generating electricity from wind; wind turbines; wind mills; turbines for power generation; vertical axis wind turbines; vertical axis wind mills; vertical axis wind power plants; horizontal axis wind turbines; horizontal axis wind power plants; machine and structural parts for wind-operated machines, wind power generators, wind power generator collectors, wind turbines, windmills, turbines for power generation, vertical axis wind mills, vertical axis wind turbines, horizontal axis wind turbines, horizontal axis wind-operated machines, and wind power propulsion machines, namely, towers, masts, housings, casings, cowlings, main shafts, universal joints, transmissions, clutches and electric generators, blade hubs, blades, rotation devices for rotating the aforesaid machines and devices to face the wind, yaw rings and gears, devices for setting the pitch of the wings, brakes and brake devices; pumps as parts of machines; air pumps as parts of machines; water pumps for pumping water or other fluids; wind-operated pumps for pumping water or other fluids; wind operated motors and engines, except for land vehicles; components, parts and fittings for all the aforesaid goods | SECTION 8 - CANCELLED | — |
| 037 | Erection, installation, servicing, maintenance and repair of wind power plants, wind-operated machines, wind power generation systems, wind power collection systems, wind turbines, wind mills, turbines for power generation, vertical axis wind turbines, vertical axis wind mills, vertical axis wind power plants and other vertical axis wind-operated machines, horizontal axis wind turbines, horizontal axis wind power plants and other horizontal axis wind-operated machines, wind power propulsion systems except for land vehicles, and components, parts and fittings therefor; advisory, consultancy and information in connection with all the aforesaid services | SECTION 8 - CANCELLED | — |
| 040 | Custom construction of wind power plants, wind-operated machines, wind power generation systems, wind power collection systems, wind turbines, wind mills, turbines for power generation, vertical axis wind turbines, vertical axis wind mills, vertical axis wind power plants and other vertical axis wind-operated machines, horizontal axis wind turbines, horizontal axis wind power plants and other horizontal axis wind-operated machines, wind power propulsion systems except for land vehicles, and components, parts and fittings therefor; advisory, consultancy and information services relating to all the aforesaid services | SECTION 8 - CANCELLED | — |
| 042 | Design and development of and scientific research, testing and analysis in connection with, wind power plants, wind-operated machines, wind power generation systems, wind power collection systems, wind turbines, wind mills, turbines for power generation, vertical axis wind turbines, vertical axis wind mills, vertical axis wind power plants and other vertical axis wind-operated machines, horizontal axis wind turbines, horizontal axis wind power plants and other horizontal axis wind-operated machines, wind power propulsion systems except for land vehicles, and components, parts and fittings therefor; technical services in the nature of technical research and development concerning wind power plants, wind-operated machines, wind power generation systems, wind power collection systems, wind turbines, wind mills, turbines for power generation, vertical axis wind turbines, vertical axis wind mills, vertical axis wind power plants and other vertical axis wind-operated machines, horizontal axis wind turbines, horizontal axis wind power plants and other horizontal axis wind-operated machines, wind power propulsion systems except for land vehicles, and components, parts and fittings therefor; advisory, consultancy and information services relating to all the aforesaid services | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 14, 2020 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Jan 7, 2019 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Jan 7, 2014 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 22, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 22, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 2, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 14, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 13, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 13, 2013 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 13, 2013 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Sep 13, 2013 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Sep 13, 2013 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Sep 13, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 13, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 6, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 14, 2013 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 14, 2013 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 14, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 13, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 25, 2013 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| Apr 17, 2013 | ALIE | ASSIGNED TO LIE | — |
| Apr 11, 2013 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Mar 8, 2013 | MPMK | NOTICE OF PSEUDO MARK E-MAILED | — |
| Mar 7, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 5, 2013 | NWAP | NEW APPLICATION ENTERED | — |