Drawing for SMITHGROUPJJR

USPTO serial 85867497

SMITHGROUPJJR

Reviewed by CopyMark Law Group

Reg. 4531891Status 710
Filing date
Status date
Registration date
May 20, 2014
Examiner
MACIOL II, EUGENE VALENTINE-JO
Law office
TMEG LAW OFFICE 103

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with SMITHGROUPJJR?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Anna K. Rolbinson

Anna K. Rolbinson BROOKS KUSHMAN P.C.1000 Town Center22nd FloorSOUTHFIELD, MI 48075

Goods and services

ClassDescriptionStatusFirst use
035ASSISTING WITH THE FORMATION, NEGOTIATION, AND MANAGEMENT OF CONSTRUCTION CONTRACTS; COST ESTIMATION SERVICES IN THE NATURE OF ESTIMATING BUILDING COSTS AND BUILDING LIFECYCLE COSTS; ENVIRONMENTAL CONSULTING, NAMELY, NATURAL RESOURCE MANAGEMENTSECTION 8 - CANCELLEDNov 18, 2011
037REAL ESTATE DEVELOPMENT, NAMELY, MASTER AND SITE PLANNING OF RESIDENTIAL AND/OR COMMERCIAL COMMUNITIES, THE PLANNING AND DESIGN OF LAND AND WATER RESOURCES, CAMPUSES, AND WATERFRONT PROPERTIES, THE PLANNING AND DESIGN OF PARKS AND RECREATION AREASSECTION 8 - CANCELLEDNov 18, 2011
042ENERGY AUDITING; REAL ESTATE SERVICES, NAMELY, LAND USE PLANNING SERVICES; ENVIRONMENTAL CONSULTING SERVICES, NAMELY, CONDUCTING ENVIRONMENTAL SURVEYS, ENVIRONMENTAL SITE INSPECTIONS, MONITORING OF ENVIRONMENTAL SITES, PREPARING ENVIRONMENTAL IMPACT STATEMENTS, ENVIRONMENTAL ASSESSMENTS, WATER QUALITY STUDIES, WILDLIFE IMPACT STATEMENTS, COMMUNITY IMPACT STATEMENTS, WETLAND DELINEATION PLANS, WETLAND MIGRATION PLANS, NATURAL RESOURCE PROTECTION PLANS; LANDSCAPE ARCHITECTURE DESIGN SERVICES; CIVIL ENGINEERING, INCLUDING CONDUCTING FEASIBILITY STUDIES AND TRAFFIC PLANNING, DESIGN AND CAPACITY STUDIES; ARCHITECTURAL SERVICES, NAMELY, ARCHITECTURAL DESIGN, MASTER PLANNING, SPACE PLANNING, LIGHTING DESIGN, AND INTERIOR DESIGN; PRESERVATION ARCHITECTURE, NAMELY, ARCHITECTURAL DESIGN AND ARCHITECTURAL CONSULTATION SERVICES RELATING TO PRESERVING AND/OR RESTORING THE HISTORICAL APPEARANCE OF BUILDINGS; ENGINEERING SERVICES RELATED TO BUILDING CONSTRUCTION, NAMELY, ELECTRICAL ENGINEERING, MECHANICAL ENGINEERING AND, STRUCTURAL ENGINEERING; FORENSIC ENGINEERING; CIVIL ENGINEERING; BUILDING AND REAL ESTATE SITE SECURITY PLANNING AND DESIGN IN THE NATURE OF ARCHITECTURAL AND ENGINEERING SERVICES; ENGINEERING SERVICES FOR BUILDING AND PROPERTY CONDITION ASSESSMENT; BUILDING ENGINEERING SYSTEMS EVALUATION; ENERGY CONSERVATION SERVICES, NAMELY ARCHITECTURAL AND ENGINEERING SERVICES FOR ENERGY EFFICIENT BUILDINGS; CONDUCTING OF FEASIBILITY STUDIES; CONSULTATION IN THE FIELD OF COMPUTER GRAPHICS AND COMPUTER-AIDED DRAFTING AND DESIGN; CONSULTATION IN CORPORATE DESIGN, NAMELY, LAYOUT OF BUILDING FUNCTIONAL SPACES FOR OPTIMAL OPERATIONAL EFFICIENCYSECTION 8 - CANCELLEDNov 18, 2011
045REAL ESTATE SERVICES, NAMELY, REVIEWING STANDARDS AND PRACTICES TO ASSURE COMPLIANCE WITH ZONING LAWS AND REGULATIONS; PERMITTING, NAMELY, OBTAINING ENVIRONMENTAL, DESIGN, ZONING, AND OTHER GOVERNMENTAL PERMITS FOR DEVELOPMENT PROJECTS; LITIGATION SUPPORT SERVICES; PERMITTING AND LICENSING APPLICATION SERVICES PERTAINING TO BUILDING CONSTRUCTION AND OCCUPANCY, NAMELY, OBTAINING PERMITS AND LICENSES BY IDENTIFYING WHICH PERMITS ARE REQUIRED, PREPARING DOCUMENTATION FOR PERMITS, ATTENDING COMMUNITY AND AGENCY MEETINGS TO ASSIST CLIENTS IN COMPLYING WITH REQUIREMENTS, AND SECURING PERMITS AND LICENSESSECTION 8 - CANCELLEDNov 18, 2011

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 6, 2024CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9
May 20, 2023REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
Jul 22, 2020NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
Jul 22, 2020C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
Jul 21, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
May 5, 2020E815TEAS SECTION 8 & 15 RECEIVED
May 20, 2019REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
May 20, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 15, 2014DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION
Mar 28, 2014AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL
Feb 28, 2014IUCNNOTICE OF ALLOWANCE CANCELLED
Feb 28, 2014EPPATEAS POST PUBLICATION AMENDMENT RECEIVED
Feb 18, 2014NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Dec 24, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Dec 24, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 4, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Nov 15, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Nov 7, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Nov 5, 2013DMCCDATA MODIFICATION COMPLETED
Oct 16, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Oct 16, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Oct 9, 2013ALIEASSIGNED TO LIE
Oct 8, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 10, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 10, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 10, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 3, 2013DOCKASSIGNED TO EXAMINER
Mar 12, 2013MPMKNOTICE OF PSEUDO MARK E-MAILED
Mar 11, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Mar 8, 2013NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance