Drawing for SUNBELT RENTALS

USPTO serial 85874074

SUNBELT RENTALS

Reviewed by CopyMark Law Group

Reg. 5195834Status 705Renewal
Filing date
Status date
Registration date
May 2, 2017
Examiner
REGAN, JOHN B
Law office
—

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 705: Status 705 means a Madrid-based U.S. registration has accepted Section 71 maintenance and Section 15 incontestability. The U.S. extension is active with strengthened rights.

Need help with SUNBELT RENTALS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $5,634*

Plus Government fees of $10,400

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Tasneem A. Dharamsi

Tasneem A. Dharamsi PARKER POE ADAMS & BERNSTEIN LLP110 East Court Street, Suite 200Greenville, SC 29601UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Metal scaffolding, metal aerial work platforms, and metal ladders; general-purpose metal storage containers and reservoirs; metal fuel-storage tanks; metal air conditioning, heating, and ventilating ducts; non-electric air hose cables of metal; chain hoists used for lifting and rigging; metal come-a-long-chains; trench-shoring equipment, namely, manhole shields, trench boxes; metal enclosures serving as barriers around generators and construction equipmentACTIVEDec 31, 1999
007Construction and industrial machinery and equipment, namely, power-operated forklifts, conveyors, hoists, winches, jacking systems consisting of hydraulic cylinders, bottle jacks, duct jacks, hydraulic jacks, screw jacks, railroad jacks, and transmission jacks; electric tools, namely, drills, saws, sanders, grinders, screwdrivers, wrenches, planers, routers, hammers, cable pullers, conduit benders, pipe threaders, welders, plasma cutters; hydraulic tools, namely, wrenches, excavators, pump heads, cutterheads, backhoes, skidsteers, punches, spreaders, nut splitters, cable benders, conduit benders; air tools, namely, compressors, wrenches, post drivers, backfill tampers, saws, drills, grinders, nailers, staplers; paint sprayers; power-operated cleaning and maintenance equipment, namely, floor scrubbers, floor sweepers, multi-purpose high-pressure washers, street sweepers, vacuum cleaners, wet-dry vacuums, carpet extractors, floor buffers, floor scrapers, tile scrapers, floor strippers, floor nailers, floor sanders, floor edgers, carpet irons, carpet stretchers, tile rollers, dry ice blasters, sand blasters, soda blasters; power-operated compaction equipment, namely, plate tampers, jumping jack tampers, asphalt rollers, trench rollers, vibratory rollers, jumping jack rollers, plate compactors; power-operated concrete and masonry equipment, namely, planers, saws, drills, scabblers, grinders, mixers, concrete buckets, trowels, vacuum cleaners, shot blasters, gas breakers, concrete vibrators, rebar cutters, rebar benders; power-operated earth-moving equipment, namely, backhoe loaders, skid-steer loaders, crawler loaders, landscape loaders, wheel loaders, bulldozers, excavators, trenchers; power-operated material-handling equipment, namely, dockplates, loading ramps, dry wall lifts and carts, material lifts; power-operated demolition equipment, namely, hydraulic breakers, chipping hammers, paving breakers, rivet busters, rock drills; pile-drivers; power-operated golf course maintenance equipment, namely, aerators, dethatchers, and overseeders; power-operated water-damage equipment, namely, carpet water extractors, turbodryers, negative air machines, air movers, water pumps; power-operated lawn, landscape, and tree equipment, namely, overseeders, lawn vacuum cleaners, edgers, tillers, trimmers, trenchers, pruners, sod cutters, aerators, dethatchers, lawn mowers, brush cutters, chain saws, lawn spreaders, lawn rollers, stump grinders, log splitters, wood and brush chippers, straw blowers, hydroseeders, leaf blowers, mulchers, post hole augers; diesel, gas, and electric pumps; hydraulic and submersible pumps; AC generators, DC generators, and electric power generators; pipe beveling machines; beam trolleys for attaching hoists; machine welding torches, cutting torchesACTIVEDec 31, 1999
008Hand tools, namely, wrenches, pliers, sledge hammers, pry bars, wedges, clamps, hand-operated pumps, hand jacks, and vacuum-suction cups for lifting glassACTIVEDec 31, 2013
009Traffic safety equipment, namely, luminous or mechanical arrow boards and message boards; video pipe inspection cameras, laser and optical levels; carpenter's levelsACTIVEDec 31, 2013
011Air conditioners, air conditioning units, dehumidifiers, electric fans, space ventilating fans for commercial and industrial use, portable air scrubbers featuring high-efficiency particulate air filters, confined space ventilators, portable electric, kerosene, propane, and natural gas heaters for commercial, residential, and industrial use; portable light stands; electric tools, namely, heat gunsACTIVEDec 31, 1999
012Electric carts and all-terrain vehicles; equipment trailers; earth-moving equipment, namely, tractors; material-handling equipment, namely, appliance trucks, hand trucks, pallet trucksACTIVEDec 31, 1999
020[ Cabinets ]SECTION 8 - CANCELLEDDec 31, 1999
021Handheld grindersACTIVEDec 31, 1999
035Retail store services featuring construction and industrial equipment, machines, tools, and apparatus, lawn, landscape, and tree equipment, pumps and power generators, enclosures for generators and commercial equipment, scaffolding, aerial work platforms, and ladders, metal storage containers, fuel tanks, metal air conditioning, heating, and ventilating ducts, traffic safety equipment, air conditioners, air conditioning units, dehumidifiers, electric fans, fans for industrial and commercial use, air scrubbers, blowers, ventilators, air circulators, portable space heaters, heaters for commercial, residential, and industrial use, light towers and portable lighting equipment, electric carts and all-terrain vehicles, equipment trailersACTIVEDec 31, 1999
036Financing servicesACTIVEDec 31, 2006
037Rental of construction and industrial building equipment, construction and building machines, construction and building tools, construction and building apparatus, pumps, and hand and power tools from mobile site locations; repair and maintenance of construction and industrial equipment, machines, tools, and apparatus, lawn, landscape, and tree equipment, enclosures for generators and commercial equipment, metal storage containers, traffic safety equipment, air conditioners, air conditioning units, dehumidifiers, electric fans, fans for industrial and commercial use, air scrubbers, blowers, ventilators, air circulators, portable space heaters, heaters for commercial, residential, and industrial use, portable lighting equipment, electric carts and all-terrain vehicles, equipment trailers, and pumps and power generators; rental, installation, erection, dismantling, maintenance, and repair of scaffolding and aerial work platformsACTIVEDec 31, 1999
039Rental of enclosures for generators and commercial equipment, metal storage containers, cabinets, and reservoirs, fuel tanks, electric carts and all-terrain vehicles, and equipment trailersACTIVEDec 31, 2002
040Rental of air conditioners, air conditioning units, dehumidifiers, electric fans, fans for industrial and commercial use, air scrubbers, blowers, ventilators, air circulators, portable space heaters, heaters for commercial, residential, and industrial use, and power generatorsACTIVEDec 31, 1999
041Educational classes on the proper use and operation of construction equipment, machines, and apparatus; safety training classes on the proper use and operation of construction equipment, machines, and apparatusACTIVEDec 31, 2003
043Rental of portable lighting equipment for use at construction and industrial sites and for special eventsACTIVEDec 31, 2002
044Rental of lawn, landscape, and tree equipmentACTIVEDec 31, 1999
045Rental of traffic safety equipmentACTIVEDec 31, 2002

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 2, 2026REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Oct 28, 2023NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Oct 28, 2023C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Oct 28, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 1, 2023E815TEAS SECTION 8 & 15 RECEIVED—
May 2, 2022REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Sep 24, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 24, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 2, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 29, 2017SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Mar 28, 2017CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Mar 24, 2017EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Mar 23, 2017SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Mar 23, 2017EX5GSOU EXTENSION 5 GRANTED—
Mar 22, 2017AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Mar 16, 2017IUAFUSE AMENDMENT FILED—
Mar 16, 2017EXT5SOU EXTENSION 5 FILED—
Mar 16, 2017EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 16, 2017EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Oct 14, 2016EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Oct 13, 2016EX4GSOU EXTENSION 4 GRANTED—
Sep 16, 2016EXT4SOU EXTENSION 4 FILED—
Sep 16, 2016EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 29, 2016EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Mar 26, 2016EX3GSOU EXTENSION 3 GRANTED—
Mar 16, 2016EXT3SOU EXTENSION 3 FILED—
Mar 16, 2016EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 18, 2015EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Sep 16, 2015EX2GSOU EXTENSION 2 GRANTED—
Sep 16, 2015EXT2SOU EXTENSION 2 FILED—
Sep 16, 2015EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Apr 14, 2015EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Apr 13, 2015EX1GSOU EXTENSION 1 GRANTED—
Apr 9, 2015AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Mar 9, 2015EXT1SOU EXTENSION 1 FILED—
Mar 9, 2015EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 9, 2015TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 16, 2014NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 22, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 22, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 2, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 19, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 13, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 13, 2014XAECEXAMINER'S AMENDMENT ENTERED—
Jun 13, 2014GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jun 13, 2014GNEAEXAMINERS AMENDMENT E-MAILED—
Jun 13, 2014CNEAEXAMINERS AMENDMENT -WRITTEN—
May 23, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 22, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 22, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 27, 2014GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 27, 2014GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 27, 2014CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 6, 2014XAECEXAMINER'S AMENDMENT ENTERED—
Mar 6, 2014GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 6, 2014GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 6, 2014CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 13, 2014XAECEXAMINER'S AMENDMENT ENTERED—
Feb 13, 2014GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 13, 2014GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 13, 2014CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 23, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 23, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 21, 2014ALIEASSIGNED TO LIE—
Dec 30, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 29, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 29, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 29, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 29, 2013XAECEXAMINER'S AMENDMENT ENTERED—
Jun 29, 2013GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jun 29, 2013GNEAEXAMINERS AMENDMENT E-MAILED—
Jun 29, 2013CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 28, 2013XAECEXAMINER'S AMENDMENT ENTERED—
Jun 28, 2013GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jun 28, 2013GNEAEXAMINERS AMENDMENT E-MAILED—
Jun 28, 2013CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 21, 2013DOCKASSIGNED TO EXAMINER—
Mar 19, 2013MPMKNOTICE OF PSEUDO MARK E-MAILED—
Mar 18, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 15, 2013NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance