USPTO serial 85875301
BLUE EXTRUSION
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Sep 22, 2015
- Examiner
- BLAIR, JASON
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with BLUE EXTRUSION?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Reifenhäuser GmbH & Co. KG Maschinenfabrik
D-53839 Troisdorf, DE
Other trademarks owned by Reifenhäuser GmbH & Co. KG Maschinenfabrik
Reifenhäuser GmbH & Co. KG Maschinenfabrik
D-53839 Troisdorf, DE
Other trademarks owned by Reifenhäuser GmbH & Co. KG Maschinenfabrik
Reifenhäuser GmbH & Co. KG Maschinenfabrik
D-53839 Troisdorf, DE
Other trademarks owned by Reifenhäuser GmbH & Co. KG Maschinenfabrik
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Andrew N. Fredbeck
ANDREW N. FREDBECK FROSS ZELNICK LEHRMAN & ZISSU, P.C.4 TIMES SQUARE, 17TH FLOORNEW YORK, NY 10036UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines for material processing, in the nature of; machines for the manufacturing, processing and production of plastic and films; production machines for manufacturing of plastic films; extrusion presses; extrusion plants machines for the production of tubular films; production machines for manufacturing extruded films; extrusion plant machines for manufacturing of objects of thermoplastic; vacuum hoisting machinery; conveyors for plastic granules and plastic film webs; blowing machines for compression, suction and transport of gases; mono blow film machines, multi-layer blow film machines; blown film dies, cooling rings and heat sinks for film tubes; integrated calibration units for the blow film extrusion apparatus; machine parts, namely, screw extruders and vacuum conveyors for plastic granules and plastic in molten state, extruders and blown film dies for blow film extrusion machines, film take-off units and film winders for film extrusion plants; machine parts, namely, oscillating film take-off units as parts of blow film extrusion machines; machine parts, namely, spiral mandrel distributors and pre-distributors as parts of blow film extrusion machines; fans for machine engines, namely, cooling fans for blow film lines, as machine parts; machine parts, namely, turning bars and guide rollers as parts of blow film extrusion machines; machine parts, namely, brush rollers for blow film lines; machine parts, namely, spreader rollers, temperature rollers and cooling rollers for blow film extrusion machines | SECTION 8 - CANCELLED | — |
| 009 | Electronic controls for film extrusion plants; plastic testing machines and calibration devices calibrating film extrusion machines and their components; industrial material testing and calibration devices for calibrating film extrusion machines; electric and electronic controls for film extrusion machines, machine parts, machine tools, pumps and fuel pumps; industrial measuring systems for thickness control comprised of a measuring device with measuring head, capacitive sensor, optical sensor, radiation sensor, laser, infrared sensor, rotating assembly, processing unit and control unit; industrial measuring systems for width control, comprised of infrared sensors, processing unit and control unit; industrial measuring systems for layer control and layer thickness control, comprised of a gravimeter, dosing unit, measuring unit for contact or contactless measurement, using laser, infrared and white light measurement, interferometer, processing unit and control unit; industrial measuring systems for temperature control, comprised of a contact temperature sensor and contactless temperature sensor; industrial measuring systems for pressure control, comprised of direct or non-direct pressure measurement sensors, strain gauges and pressure membranes; industrial measuring systems for line speed control, web speed control and RPM control, comprised of processing units and control units for rotational speed of the winder, nip and rollers, RPM sensors and speed transmitters; industrial measuring systems for control of web position, comprised of infrared sensors, adjusting unit and positioning unit; industrial measuring systems for tension control and torque control, comprised of load cells, processing unit and control unit; industrial measuring systems, comprised of charging level sensors, liquid level sensors, limit switches, proximity switches and electronic apparatus for testing film extrusion machines; apparatus and instruments for conducting, switching, converting, storing, regulating and controlling of electricity | SECTION 8 - CANCELLED | — |
| 035 | Advertising and marketing; wholesale and retail store services in the field of industrial or extrusion machines and their parts and accessories; arranging of commercial trading transactions for third parties, both online and not online; arranging of contractual services with third parties for the providing of services; arranging of buying and selling contracts for third parties for the buying and selling of goods; professional business consultancy regarding the cost-effective energetic optimizing of machines and mechanical equipment, particularly with regard to the reduction of CO2 emissions, resource efficiency, recyclability, effectiveness and energy saving | SECTION 8 - CANCELLED | — |
| 037 | Installation, maintenance and repair in the nature of alteration, modification and extension of industrial or extrusion machines; organizational and technical consultancy regarding installation, service, repair, alteration, and modification of industrial or extrusion machines; construction planning in the field of plant construction | SECTION 8 - CANCELLED | — |
| 042 | Conceptual design of film extrusion plants; technological application consultancy consultation in the technology field of film extrusion systems and their parts; engineering services in the field of machine construction and extrusion technology; industrial research and analysis in the field of extrusion plants and machines; providing technological consultancy featuring engineering methods for energetic optimizing of machines and mechanical equipment, particularly with regard to the reduction of CO2 emission, resource efficiency, recyclability, effectiveness and energy saving; technological planning in relation to the energetic optimizing of machines and mechanical equipment; development of technological design concepts for energetic machines and mechanical equipment as well as for optimizing of the same; technological consultancy and analysis related to the field of energy saving in the consumption of machines and technical equipment by means of technological measures | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Reifenhäuser GmbH & Co. KG Maschinenfabrik
- Other trademarks owned by Reifenhäuser GmbH & Co. KG Maschinenfabrik
- Other trademarks owned by Reifenhäuser GmbH & Co. KG Maschinenfabrik
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named BLUE EXTRUSION
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 1, 2022 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Apr 5, 2017 | CORV | REVIEW OF CORRESPONDENCE COMPLETE - ADDRESS UPDATED | — |
| Jan 31, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 22, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 7, 2015 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 17, 2015 | NPUB | NOTICE OF PUBLICATION | — |
| Jun 1, 2015 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| May 29, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 29, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 29, 2015 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 29, 2015 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Dec 4, 2014 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 4, 2014 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 7, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 6, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 6, 2014 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Jul 8, 2014 | CNSI | INQUIRY AS TO SUSPENSION MAILED | — |
| Jul 7, 2014 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Jul 7, 2014 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Jul 1, 2014 | ALIE | ASSIGNED TO LIE | — |
| Dec 31, 2013 | CNSL | LETTER OF SUSPENSION MAILED | — |
| Dec 31, 2013 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Dec 21, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 20, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 20, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 24, 2013 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 22, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 22, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 19, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 16, 2013 | NWAP | NEW APPLICATION ENTERED | — |