USPTO serial 85882753
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Kar Yee Peluso
Kar Yee Peluso Boral Industries Inc.200 Mansell Court East, Suite 310Roswell, GA 30076UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machine tools used for cutting and shaping metal and like materials; machine parts, namely, coil holders for sheet metal forming machines; cut-off stands for sheet forming machines; machine tool kits consisting of high pressure washers, vinyl strips, plugs, sock cap screws, nuts, handle and rubber pivot pin keepers, for repairing and overhauling a sheet bending brake | SECTION 8 - CANCELLED | Feb 8, 2012 |
| 008 | Manually operated tools, namely, sheet bending brakes and structural parts therefor; structural parts for sheet bending brakes in the nature of a portable leg assembly consisting of tubular steel bars for the support of manually operated sheet bending brakes; manually operated tools, namely, cut-off guides for cutting sheet metal | SECTION 8 - CANCELLED | Feb 8, 2012 |
| 019 | Non-metal building products, namely, shutters, shingles, siding, plastic trim, storm doors, fasteners for windows, fasteners for siding, fasteners for exterior mounting blocks, non-metal exterior mounting blocks, non-metal mount blocks, and non-metal exterior blocks for roofing and siding; lattice; roof coverings; non-metal building materials in the nature of plastic blocks for attachment to siding used in connection with the installation of fixtures; water diverters, namely, gutters; vents, namely, gable, roof, hip, ridge, and soffit ventilating ducts; door surround kits comprising exterior decorative moldings and mounting units; soffits grille pieces; plastic building materials, namely, panel protection strips for protection of seams between adjacent panels for use on residential buildings, and a horizontal wall alignment wedge defining the canted angle of planks covering a wall; alignment strips to be attached to the side of a house to register wall covering sheet material and/or planks, boards, and shingles; non-metal architectural moldings and finish trim and non-metal decorative moldings and trim for use in building construction, namely, wood, vinyl, and plastic moldings; roof stack caps, namely, non-metal chimney caps; J-mold trim for use as decorative molding and trim in building construction; construction elements in the nature of inside corner components and soffits components; all of the foregoing goods being non-metal in composition | SECTION 8 - CANCELLED | Feb 8, 2012 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 8, 2021 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Dec 3, 2021 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| May 26, 2020 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Jan 23, 2019 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Dec 11, 2018 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 11, 2018 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| May 26, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 24, 2015 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Apr 23, 2015 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Apr 23, 2015 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 23, 2015 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 23, 2015 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 23, 2015 | SNEA | SU-EXAMINER'S AMENDMENT WRITTEN | — |
| Apr 1, 2015 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Feb 20, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 20, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 13, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 29, 2014 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 29, 2014 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 29, 2014 | CNRT | SU - NON-FINAL ACTION - WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 9, 2014 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Jun 9, 2014 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| May 16, 2014 | IUAF | USE AMENDMENT FILED | — |
| May 16, 2014 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Dec 10, 2013 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Oct 15, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 15, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 25, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 9, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 3, 2013 | ALIE | ASSIGNED TO LIE | — |
| Aug 22, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 22, 2013 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 22, 2013 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 22, 2013 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 22, 2013 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 10, 2013 | GPRN | NOTIFICATION OF PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Jul 10, 2013 | GPRA | PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Jul 10, 2013 | CPRA | PRIORITY ACTION WRITTEN | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Jun 28, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 26, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 25, 2013 | NWAP | NEW APPLICATION ENTERED | — |