USPTO serial 85885535
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
SABIC International Holdings B.V.
Sittard, NL
SABIC International Holdings B.V.
Sittard, NL
SABIC International Holdings B.V.
Sittard, NL
SABIC GLOBAL TECHNOLOGIES B.V.
Bergen op Zoom, NL
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Christopher M. Weimer
Christopher M. Weimer Pirkey Barber PLLCSuite 3001801 East 6th StreetAustin, TX 78702| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Chemicals used in industry, science and photography, namely, photographic chemicals, as well as in agriculture, horticulture and forestry, excluding fungicides, herbicides, insecticides and pesticides; unprocessed artificial resins, unprocessed plastics; manures; fire extinguishing compositions; tempering preparations; soldering preparations, namely, soldering chemicals and soldering flux; chemical substances for preserving foodstuffs; tanning substances for use in the manufacture of leather; adhesives used in industry; plastics, namely, unprocessed artificial resins; unprocessed plastics; engineered plastics, namely, plastic moulding compounds for use in the manufacture of moulded plastic articles; synthetic resins; unprocessed plastics, namely, recombined plastics, mixtures, compositions and dispersions of plastics, all for use in the further manufacture of plastics | SECTION 8 - CANCELLED | — |
| 006 | Common metals and their alloys; metal building materials, namely, structural columns and beams, rebar, wire rod, pre-fabricated steel buildings, pre-fabricated parts for ship building, pipes and tubes, transportable buildings of metal; metal billets and slabs, metal hot rolled products, namely, coils and slit coils; materials of metal for railway tracks; non-electric cables and wire of common metal; small items of metal hardware, namely, wire rods and metal bars; pipes and tubes of metal; metal safes; metal ores | SECTION 8 - CANCELLED | — |
| 017 | Plastic in extruded form for use in manufacture; packing and insulating materials | SECTION 8 - CANCELLED | — |
| 023 | Yarns and threads, for textile use | SECTION 8 - CANCELLED | — |
| 037 | Consulting services with regard to the building of factories and chemical manufacturing installations | SECTION 8 - CANCELLED | — |
| 040 | Custom treatment of products and materials, namely, chemicals used in industry, science and photography, agriculture, horticulture and forestry, unprocessed artificial resins, unprocessed plastics, manures, fire extinguishing compositions, tempering and soldering preparations, chemical substances for preserving foodstuffs, tanning substances, adhesives used in industry, common metal and their alloys, metal building materials, billets and slabs, hot rolled products, pre-engineered steel building materials, ship building materials, pipes and tubes, transportable building materials of metal, materials of metal for railway tracks, non-electric cables and wires of common metal, ironmongery and small items of metal hardware, namely, wire rods and metal bars, pipes and tubes of metal, metal safes, metal ores; technical consulting services in the field of chemical manufacturing of chemical products and synthetic materials | SECTION 8 - CANCELLED | — |
| 042 | Technical consulting services in the use of chemical products and synthetic materials, namely, chemical and synthetic material engineering, research, analysis design and development; Design for others of factories and chemical manufacturing installations; engineering and consulting services with regard to the design of factories and chemical manufacturing installations; simulation of chemical and scientific processes; scientific research and technological consultation and research in the field of chemistry, biology, physics, microbiology, bacteriology and genetics; industrial analysis and research services in the field of chemical engineering, polymers, metallurgy | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 23, 2024 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Aug 8, 2022 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Mar 14, 2022 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Mar 14, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 14, 2022 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Mar 14, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 14, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 14, 2022 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Jun 2, 2021 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Sep 24, 2019 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 24, 2019 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 8, 2017 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 23, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 23, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 3, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 19, 2017 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 7, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 6, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 6, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 6, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 7, 2016 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 7, 2016 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 7, 2016 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 4, 2016 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Sep 27, 2016 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Sep 9, 2016 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Aug 23, 2016 | ATRQ | ATTORNEY REVIEW/DECISION ON AMENDMENT REQUIRED | — |
| Aug 23, 2016 | PCBG | PETITION TO DIRECTOR - CHANGE BASIS - GRANTED | — |
| Aug 10, 2016 | APET | ASSIGNED TO PETITION STAFF | — |
| Aug 5, 2016 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 4, 2016 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Aug 1, 2016 | EXT5 | SOU EXTENSION 5 FILED | — |
| Aug 1, 2016 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 1, 2016 | TPAD | TEAS PETITION TO AMEND BASIS RECEIVED | — |
| Jan 29, 2016 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 28, 2016 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Jan 21, 2016 | EXT4 | SOU EXTENSION 4 FILED | — |
| Jan 21, 2016 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 7, 2015 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 6, 2015 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Jun 29, 2015 | EXT3 | SOU EXTENSION 3 FILED | — |
| Jun 29, 2015 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 18, 2015 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Mar 17, 2015 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Mar 16, 2015 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Feb 3, 2015 | EXT2 | SOU EXTENSION 2 FILED | — |
| Feb 3, 2015 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 30, 2014 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 28, 2014 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jul 28, 2014 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jul 28, 2014 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 4, 2014 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Dec 10, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 10, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 20, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 5, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Oct 31, 2013 | ALIE | ASSIGNED TO LIE | — |
| Oct 17, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 17, 2013 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Oct 17, 2013 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Oct 17, 2013 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Oct 17, 2013 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 10, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 10, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 10, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 10, 2013 | GPRN | NOTIFICATION OF PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Jul 10, 2013 | GPRA | PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Jul 10, 2013 | CPRA | PRIORITY ACTION WRITTEN | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Jul 3, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 28, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 28, 2013 | NWAP | NEW APPLICATION ENTERED | — |