Drawing for ASRC

USPTO serial 85885987

ASRC

Reviewed by CopyMark Law Group

Reg. 4647445Status 800Registered
Filing date
Status date
Registration date
Dec 2, 2014
Examiner
SOBRAL, CHRISTINA
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with ASRC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Grace Han Stanton

Grace Han Stanton PERKINS COIE LLPP.O. Box 2608SEATTLE, WA 98111United States

Goods and services

ClassDescriptionStatusFirst use
035Association services, namely, promoting the business, economic, cultural, social and other interests of Alaska Native Corporation Shareholders; Natural resource management; Business consulting services in the field of information assuranceACTIVEDec 31, 1976
037Pipeline construction and maintenance; Construction services, namely, planning, laying out and construction of commercial, industrial, and governmental facilities; Oilfield construction; construction of oil, gas, commercial, industrial, and governmental facilities; Icefield construction for oil drilling, gas drilling, commercial and industrial facilities; Maintaining oil and gas drilling facilities in the field of the energy industry; Construction project management services in the field of the energy industry; Installation of computer network and communication cabling in the nature of laying cable; Construction and construction management of air fields, airplane runways, highways, roads, power plants, water, sewer and fuel systems infrastructure, water, sewer and storm drain utilities, embankments, onshore and offshore pipelines and compressor stations; renovation of buildings and structures; Construction services, namely, site clearing, excavation, pad preparation, grading, and asphalt paving services; road paving services; excavation services; rock and gravel quarrying and rock crushing and screening; mining extraction; consulting services in the field of offshore oil spill clean-up, containment in the nature of localization, drying and cleaning of oils, and collection in the nature of oil removal services; technical consultation in the field of crude, oil well, oil and gas drilling; maintenance and sustainment in the nature of repair of computer networks, radio frequencies, analog and digital equipment, data compression subsystems, and circuit boardsACTIVEDec 31, 2011
040Concrete and asphalt demolition services; custom fabrication services, namely, pipe fabrication, structural steel fabrication and insulation fabrication; Custom fabrication of oil and gas drilling facilities in the field of the energy industry; Custom manufacturing of hot mix asphaltACTIVEDec 31, 2005
041Technical consultancy in the nature of training in the technological use and technological operation of oil spill recovery response equipmentACTIVEDec 31, 2011
042Engineering; Technical consultation in the field of production engineering, drilling engineering, oil well-testing, facility engineering and design; Aerospace engineering services; Technical consultation services in the field of information technology, namely, computer software development, creating web sites, operating and maintaining computer network and help desks, and installing network and communication cabling; Test and evaluation planning for military computer systems for quality control and assessment for security vulnerability; development in the field of subsurface natural resource development; oil, gas, coal and base metal sulfides exploration services; Engineering, geological, land and road, and oil field surveying; metrology services; comprehensive operational and sustainment technical support for real-time command, control, and monitoring for manned and unmanned flights; database design and development services; testing of computer network, radio frequency, analog and digital equipment for the purpose of certification, and troubleshooting services in the nature of diagnosing computer hardware and software problems; information technology infrastructure design and architecture; technical support services, namely, troubleshooting and test certification of computer networks, radio frequencies, analog and digital equipment, data compression subsystems, and circuit boards; computer security services, namely, restricting access to and by computer networks to and of undesired web sites, media, and individuals and facilities; testing and evaluation of computer networks for the purpose of certification and to assure compliance with industry standards; development in the field of natural resourcesACTIVEDec 31, 2011

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 19, 2024NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
May 19, 2024RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
May 19, 202489AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
May 19, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 5, 2024E89RTEAS SECTION 8 & 9 RECEIVED—
Dec 2, 2023REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jun 3, 2020NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Jun 3, 2020C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Jun 3, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 7, 2020E815TEAS SECTION 8 & 15 RECEIVED—
Dec 2, 2019REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Dec 2, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 18, 2014DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Sep 17, 2014AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Sep 12, 2014IUCNNOTICE OF ALLOWANCE CANCELLED—
Sep 12, 2014EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Mar 18, 2014NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jan 21, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 21, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 1, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 19, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 19, 2013ALIEASSIGNED TO LIE—
Nov 25, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 23, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 21, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 21, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 21, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 21, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 21, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 21, 2013DOCKASSIGNED TO EXAMINER—
Mar 29, 2013MPMKNOTICE OF PSEUDO MARK E-MAILED—
Mar 28, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 28, 2013NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance