USPTO serial 85885987
Reviewed by CopyMark Law Group
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Arctic Slope Regional Corporation
Anchorage, AK
Arctic Slope Regional Corporation
Anchorage, AK
Arctic Slope Regional Corporation
Anchorage, AK
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Grace Han Stanton
Grace Han Stanton PERKINS COIE LLPP.O. Box 2608SEATTLE, WA 98111United States| Class | Description | Status | First use |
|---|---|---|---|
| 035 | Association services, namely, promoting the business, economic, cultural, social and other interests of Alaska Native Corporation Shareholders; Natural resource management; Business consulting services in the field of information assurance | ACTIVE | Dec 31, 1976 |
| 037 | Pipeline construction and maintenance; Construction services, namely, planning, laying out and construction of commercial, industrial, and governmental facilities; Oilfield construction; construction of oil, gas, commercial, industrial, and governmental facilities; Icefield construction for oil drilling, gas drilling, commercial and industrial facilities; Maintaining oil and gas drilling facilities in the field of the energy industry; Construction project management services in the field of the energy industry; Installation of computer network and communication cabling in the nature of laying cable; Construction and construction management of air fields, airplane runways, highways, roads, power plants, water, sewer and fuel systems infrastructure, water, sewer and storm drain utilities, embankments, onshore and offshore pipelines and compressor stations; renovation of buildings and structures; Construction services, namely, site clearing, excavation, pad preparation, grading, and asphalt paving services; road paving services; excavation services; rock and gravel quarrying and rock crushing and screening; mining extraction; consulting services in the field of offshore oil spill clean-up, containment in the nature of localization, drying and cleaning of oils, and collection in the nature of oil removal services; technical consultation in the field of crude, oil well, oil and gas drilling; maintenance and sustainment in the nature of repair of computer networks, radio frequencies, analog and digital equipment, data compression subsystems, and circuit boards | ACTIVE | Dec 31, 2011 |
| 040 | Concrete and asphalt demolition services; custom fabrication services, namely, pipe fabrication, structural steel fabrication and insulation fabrication; Custom fabrication of oil and gas drilling facilities in the field of the energy industry; Custom manufacturing of hot mix asphalt | ACTIVE | Dec 31, 2005 |
| 041 | Technical consultancy in the nature of training in the technological use and technological operation of oil spill recovery response equipment | ACTIVE | Dec 31, 2011 |
| 042 | Engineering; Technical consultation in the field of production engineering, drilling engineering, oil well-testing, facility engineering and design; Aerospace engineering services; Technical consultation services in the field of information technology, namely, computer software development, creating web sites, operating and maintaining computer network and help desks, and installing network and communication cabling; Test and evaluation planning for military computer systems for quality control and assessment for security vulnerability; development in the field of subsurface natural resource development; oil, gas, coal and base metal sulfides exploration services; Engineering, geological, land and road, and oil field surveying; metrology services; comprehensive operational and sustainment technical support for real-time command, control, and monitoring for manned and unmanned flights; database design and development services; testing of computer network, radio frequency, analog and digital equipment for the purpose of certification, and troubleshooting services in the nature of diagnosing computer hardware and software problems; information technology infrastructure design and architecture; technical support services, namely, troubleshooting and test certification of computer networks, radio frequencies, analog and digital equipment, data compression subsystems, and circuit boards; computer security services, namely, restricting access to and by computer networks to and of undesired web sites, media, and individuals and facilities; testing and evaluation of computer networks for the purpose of certification and to assure compliance with industry standards; development in the field of natural resources | ACTIVE | Dec 31, 2011 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| May 19, 2024 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| May 19, 2024 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| May 19, 2024 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| May 19, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Feb 5, 2024 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Dec 2, 2023 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Jun 3, 2020 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Jun 3, 2020 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Jun 3, 2020 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Apr 7, 2020 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Dec 2, 2019 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Dec 2, 2014 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 18, 2014 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| Sep 17, 2014 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Sep 12, 2014 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Sep 12, 2014 | EPPA | TEAS POST PUBLICATION AMENDMENT RECEIVED | — |
| Mar 18, 2014 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jan 21, 2014 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 21, 2014 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 1, 2014 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 19, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Dec 19, 2013 | ALIE | ASSIGNED TO LIE | — |
| Nov 25, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 23, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 21, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 21, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 21, 2013 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 21, 2013 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 21, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 21, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 29, 2013 | MPMK | NOTICE OF PSEUDO MARK E-MAILED | — |
| Mar 28, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 28, 2013 | NWAP | NEW APPLICATION ENTERED | — |