Drawing for GTAP

USPTO serial 85910363

GTAP

Reviewed by CopyMark Law Group

Reg. 4558479Status 710
Filing date
Status date
Registration date
Jul 1, 2014
Examiner
BROWN, BARBARA TROFFKIN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with GTAP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
037Installation, servicing and repair of measuring instruments for thermal analysis (including the thermogravimetry, the thermo-mechanical analysis, the dynamic-mechanical analysis, the di-electrical analysis, detection of boiling, melting and dripping point), for calorimetry, for moisture content analysis and for dry content analysis, including performance of function tests on measuring instruments for thermal analysis (including the thermogravimetry, the thermo-mechanical analysis, the dynamic-mechanical analysis, the di-electrical analysis, detection of boiling, melting and dripping point), for calorimetry, for moisture content analysis and for dry content analysis; provision of information regarding maintenance of measuring instruments for thermal analysis (including the thermogravimetry, the thermo-mechanical analysis, the dynamic-mechanical analysis, the di-electrical analysis, detection of boiling, melting and dripping point), for calorimetry, for moisture content analysis and for dry content analysisSECTION 8 - CANCELLEDApr 19, 2013
042Calibration and testing, analysis and evaluation of measuring instruments of others for the purpose of certification, namely, measuring instruments for thermal analysis including the thermogravimetry, the thermo-mechanical analysis, the dynamic-mechanical analysis, the di-electrical analysis, detection of boiling, melting and dripping point, for calorimetry, for moisture content analysis and for dry content analysis; testing, analysis and evaluation for the purpose of certification of the measurement uncertainty of measuring instruments for thermal analysis including the thermogravimetry, the thermo-mechanical analysis, the dynamic-mechanical analysis, the di-electrical analysis, detection of boiling, melting and dripping point, for calorimetry, for moisture content analysis and for dry content analysis; rental of measuring instruments for thermal analysis including the thermogravimetry, the thermo-mechanical analysis, the dynamic-mechanical analysis, the di-electrical analysis, detection of boiling, melting and dripping point, for calorimetry, for moisture content analysis and for dry content analysis; professional consultancy in the field of scientific laboratory services and providing scientific laboratory services for thermal analysis including the thermogravimetry, the thermo-mechanical analysis, the dynamic-mechanical analysis, the di-electrical analysis, detection of boiling, melting and dripping point, for calorimetry, for moisture content analysis and for dry content analysis for scientific use; consulting on technical process optimization for thermal analysis including the thermogravimetry, the thermo-mechanical analysis, the dynamic-mechanical analysis, the di-electrical analysis, detection of boiling, melting and dripping point, for calorimetry, for moisture content analysis and for dry content analysis; consulting on validation of technical methods and systems for thermal analysis including the thermogravimetry, the thermo-mechanical analysis, the dynamic-mechanical analysis, the di-electrical analysis, detection of boiling, melting and dripping point, for calorimetry, for moisture content analysis and for dry content analysis; consulting on quality testing for thermal analysis including the thermogravimetry, the thermo-mechanical analysis, the dynamic-mechanical analysis, the di-electrical analysis, detection of boiling, melting and dripping point, for calorimetry, for moisture content analysis and for dry content analysis; calibration, namely, adjustment of measuring instruments for thermal analysis including the thermogravimetry, the thermo-mechanical analysis, the dynamic-mechanical analysis, the di-electrical analysis, detection of boiling, melting and dripping point, for calorimetry, for moisture content analysis and for dry content analysis according to instructions of the manufacturer or legal instructions; quality testing of measuring instruments for thermal analysis including the thermogravimetry, the thermo-mechanical analysis, the dynamic-mechanical analysis, the di-electrical analysis, detection of boiling, melting and dripping point, for calorimetry, for moisture content analysis and for dry content analysisSECTION 8 - CANCELLEDApr 19, 2013

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 5, 2021C8..CANCELLED SEC. 8 (6-YR)—
Jul 1, 2019REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jan 13, 2016ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Jul 1, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 15, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 15, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 26, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 13, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 10, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 10, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 10, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 3, 2014ALIEASSIGNED TO LIE—
Feb 20, 2014ALIEASSIGNED TO LIE—
Feb 18, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 22, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 22, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 22, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 8, 2013DOCKASSIGNED TO EXAMINER—
Apr 30, 2013MPMKNOTICE OF PSEUDO MARK E-MAILED—
Apr 27, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 25, 2013NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance