Drawing for LIDURO

USPTO serial 85914025

LIDURO

Reviewed by CopyMark Law Group

Reg. 4860133Status 800Registered
Filing date
Status date
Registration date
Nov 24, 2015
Examiner
MIZELLE HOWARD, DEZMONA JULYE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with LIDURO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeanne Hamburg

Jeanne Hamburg Norris McLaughlin, P.A.7 Times Square, 21st FloorNew York, NY 10036-6524United States

Goods and services

ClassDescriptionStatusFirst use
009Surveying, optical, measuring, signalling and checking apparatus and instruments, namely, machine gear tooth measuring gauges, machine part position sensors and position detection systems comprised of sensors and controls for use in connection with aircrafts; measuring tapes; carpenter's folding rules; electronic controls for concrete mixing installations; electronic controls for use in connection with cranes of all kinds, earth-moving equipment of all kinds and machine tools; Controls and regulators for air conditioning apparatus and heating vents; electronic controls for use with power converters; controls and regulators for hydraulic modules used in connection with spray damping machines for rail vehicles; electric actuators for tilting systems; controls and regulators for transverse spring centering systems, special-purpose dampers and hydro-pneumatic suspension systems used in construction cranes and earth moving equipment; electronic controls for monitoring the location of travel gear and for monitoring the position of railway bogies; computer software and computer control software for monitoring air conditioning installations and heating vents in connection with rail vehicles; computer software, namely, diagnostic software for use in connection with air conditioning installations and heating vents for rail vehicles; electronic controls for use in supervising flight patterns; flight control devices for use in determining and supervising position of aircraft; flight simulators for aeronautical machines designed for teaching flight skills; computerized controls for aircraft equipment systems, namely, gear activation systems and air conditioning systems; electronic controls for aircraft nose guiding systems; spectacles and spectacles cases; pocket calculators; mouse pads; frequency converters for controlling engines and motors; active main current rectifiers with feedback possibilities; capacitor modules for electrical energy buffering; double layer condensers; battery modules for electrical energy buffering; DC/DC converter; switches for electrical power supplies; sensors for monitoring electrical current and voltage; sensors for monitoring equipment movement and electronic controls for monitoring crane position and other related variables; electronic controls for use with cranes; electric switching apparatus for power electronics circuits; computer software and hardware for visualization feedback in connection with the use of aircraft flight applications and earth-moving equipmentACTIVEDec 16, 2014

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 3, 2025NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Sep 3, 2025RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Sep 3, 202589AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Sep 3, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 19, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 19, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
May 19, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Apr 29, 2025E89RTEAS SECTION 8 & 9 RECEIVED—
Nov 24, 2024REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Sep 10, 2021NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Sep 10, 2021C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Sep 10, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 25, 2021E815TEAS SECTION 8 & 15 RECEIVED—
Nov 24, 2020REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Apr 18, 2017TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 1, 2016COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Feb 1, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 18, 2016ES7RTEAS SECTION 7 REQUEST RECEIVED—
Nov 24, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 21, 2015SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE MAILED—
Oct 20, 2015CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Oct 6, 2015SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Sep 29, 2015IUAFUSE AMENDMENT FILED—
Sep 29, 2015EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Sep 1, 2015EXRANOTICE OF APPROVAL OF EXTENSION REQUEST MAILED—
Aug 31, 2015EX2GSOU EXTENSION 2 GRANTED—
Aug 28, 2015AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Aug 13, 2015EXT2SOU EXTENSION 2 FILED—
Aug 13, 2015EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Feb 17, 2015EXRANOTICE OF APPROVAL OF EXTENSION REQUEST MAILED—
Feb 13, 2015EX1GSOU EXTENSION 1 GRANTED—
Feb 13, 2015EXT1SOU EXTENSION 1 FILED—
Feb 13, 2015EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Aug 19, 2014NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jun 24, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 4, 2014NPUBNOTICE OF PUBLICATION—
May 19, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 19, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 26, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 25, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 25, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 7, 2014CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 7, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 13, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 13, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 12, 2014ALIEASSIGNED TO LIE—
Feb 5, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 19, 2013CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 17, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 9, 2013DOCKASSIGNED TO EXAMINER—
May 1, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 27, 2013NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance