USPTO serial 85919489
TRISTAR GLOBAL ENERGY SOLUTIONS
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Sep 22, 2015
- Examiner
- PARKS, KIMBERLY L
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with TRISTAR GLOBAL ENERGY SOLUTIONS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
TriStar Global Energy Solutions, Inc.
Houston, TX
Other trademarks owned by TriStar Global Energy Solutions, Inc.
TriStar Global Energy Solutions, Inc.
Houston, TX
Other trademarks owned by TriStar Global Energy Solutions, Inc.
TriStar Global Energy Solutions, Inc.
Houston, TX
Other trademarks owned by TriStar Global Energy Solutions, Inc.
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Tod T. Tumey
TOD T. TUMEY TUMEY L.L.P.PO BOX 22188HOUSTON, TX 77227-2188UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Chemicals for industrial use, namely, chemicals for oxidizing sulfides and pyrophorics, chemicals for treating benzene, chemicals for emulsifying and demulsifying hydrocarbons, chemicals for de-oiling solids, chemicals for absorption of hydrocarbon vapors into liquids, chemicals for degassing of industrial equipment; chemicals for use in odor control, degassing, and volatile organic compound control; enzyme preparations for use in the oil refinery industry, chemical industry, and manufacturing industry and surfactant based compositions as raw materials for use in decontamination; chemicals for neutralizing contaminants, namely, ammonia for industrial purposes; chemical additives, namely, additives for refinery solvents, additives for hydrocarbon solvents, and additives for petrochemical solvents; chemical compositions and chemical solvent additives for industrial use for degassing of tanks, vessels, reactors, piping, pipelines, and other industrial equipment | SECTION 8 - CANCELLED | Mar 1, 2012 |
| 003 | Cleaning preparations for industrial use, namely, cleaning preparations containing chemical compositions and solvent additives for cleaning, decontaminating, and degassing of tanks, vessels, reactors, piping, pipelines, and other industrial equipment | SECTION 8 - CANCELLED | Mar 1, 2012 |
| 007 | Equipment in the nature of cleaning machines for industrial tank, vessel, pipeline, and containment cleaning; machines and machine parts for degassing, namely, pressure vessels, centrifugal separators, oil and gas separators, centrifugal stage separators, traps, knockout vessels, flash champers, centrifugal expansion separators, expansion vessels, scrubbers, and filters | SECTION 8 - CANCELLED | Mar 1, 2012 |
| 011 | Equipment for odor control, decontamination, and degassing, namely, thermal oxidizers for airborne volatile organic compound control and odor control, vapor recovery units for catalytic oxidation, industrial vacuum truck gas scrubbers and industrial liquid scrubbers for removing solid or liquid particulate matter from the air | SECTION 8 - CANCELLED | Mar 1, 2012 |
| 035 | Plant turnaround business management, namely, preparing decontamination procedures, drawings, and timelines for turnarounds | SECTION 8 - CANCELLED | Mar 1, 2012 |
| 037 | Maintenance and cleaning of industrial equipment, namely, tank, vessel, piping, pipeline, and reactor processing equipment; consultancy in the fields of facility turnarounds in the nature of cleaning industrial facilities, and industrial equipment maintenance; consultancy regarding cleaning of industrial equipment, namely, tanks, vessels, piping, pipelines, and reactors; cleaning of pits, ponds, and containments; pipeline, tank farm, and product terminal cleaning; sludge extraction, namely, robotic sludge extraction in the nature of mechanically removing scale and sludge from tanks, vessels, piping, pipelines, reactors, pits, ponds, and product terminals; cleaning of industrial equipment, namely, cleaning of tanks, vessels, piping, pipeline, and reactors | SECTION 8 - CANCELLED | Mar 1, 2012 |
| 040 | Treatment of materials, namely, chemical and waste treatment of sulfides, hydrocarbons, pyrophorics, benzene, sludge, crude oil, fuel oil, decanted slurry oil, sour water, slop oil, light end products in the nature of liquefied petroleum gas, kerosene, and aircraft fuel, finished products in the nature of petroleum, naphtha, diesel fuel, heating oil, motor oil, asphalt, gasoline, and wastewater; sludge extraction, namely, robotic sludge extraction for the purpose of treating soil and water by removing sludge; waste stream treating, namely, processing sludge streams for coker injection; treating waste hydrocarbons, namely, processing waste hydrocarbons to break emulsions, perform two-phase liquid and solid separations, and perform three-phase oil, water, and solid separations; waste and water treatment services, namely, sludge separation and dewatering in the nature of centrifugal sludge separation and dewatering; decontamination of industrial equipment, namely, decontamination of tanks, vessels, piping, pipeline, and reactors; decontamination in the nature of degassing services, namely, chemical degassing, marine degassing, refinery and petrochemical degassing, and thermal oxidation gas removal; consultancy in the field of degassing, namely, chemical degassing, marine degassing, refinery and petrochemical degassing, and thermal oxidation gas removal; environmental remediation services and consultancy, namely, treatment of waste in the nature of controlling volatile organic compounds, contaminants, and waste; consultancy regarding treatment of chemicals, gas, and waste materials; decontamination of hazardous materials, waste, chemicals, and volatile gases; consultancy in the field of environmental remediation services; consultancy in the field of degassing, processing, and decontamination of industrial equipment; decontamination of hazardous materials, sludge waste, and chemicals in pits, ponds, and containments; pipeline, tank farm, and product terminal decontamination of hazardous materials, volatile organic compounds, sludge, waste, and gases; decontamination in the nature of degassing of pipeline, tank farm, and product terminals; consultancy regarding treatment of chemicals, gas, and waste materials; waste processing of pits, ponds, and containments | SECTION 8 - CANCELLED | Mar 1, 2012 |
| 042 | Engineering services; consultancy regarding engineering activity | SECTION 8 - CANCELLED | Mar 1, 2012 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by TriStar Global Energy Solutions, Inc.
- Other trademarks owned by TriStar Global Energy Solutions, Inc.
- Other trademarks owned by TriStar Global Energy Solutions, Inc.
- Other trademarks in Class 001
- Other trademarks in Class 003
- Other trademarks in Class 007
- Other trademarks in Class 011
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named TRISTAR GLOBAL ENERGY SOLUTIONS
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 1, 2022 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Sep 22, 2020 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Sep 22, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 18, 2015 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Aug 17, 2015 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Aug 7, 2015 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Aug 7, 2015 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jul 15, 2015 | IUAF | USE AMENDMENT FILED | — |
| Jul 15, 2015 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Jan 17, 2015 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 15, 2015 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jan 15, 2015 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jan 15, 2015 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 14, 2015 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Jul 15, 2014 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| May 20, 2014 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 20, 2014 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 30, 2014 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 16, 2014 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 16, 2014 | ALIE | ASSIGNED TO LIE | — |
| Mar 25, 2014 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 25, 2014 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 25, 2014 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Mar 25, 2014 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Mar 25, 2014 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 22, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 21, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 21, 2014 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 21, 2013 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 21, 2013 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 21, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 16, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| May 8, 2013 | MDSM | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| May 7, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 3, 2013 | NWAP | NEW APPLICATION ENTERED | — |