Drawing for EMPOWERING ENERGY

USPTO serial 85958151

EMPOWERING ENERGY

Reviewed by CopyMark Law Group

Reg. 4685420Status 710
Filing date
Status date
Registration date
Feb 10, 2015
Examiner
KEAN, AMY C
Law office
TMO LAW OFFICE 112

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with EMPOWERING ENERGY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

John Seth Bullard

John Seth Bullard ORGAIN, BELL & TUCKER, LLPPO BOX 1751BEAUMONT, TX 77704-1751UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Silicon controlled rectifier speed drives; the drilling rig top drives used for controlling the speed of the drill string; and traction motors; all for use in oil, gas and chemical exploration on gas and oil drilling rigs and in electrical power co-generation and other industrial and commercial electrical power, instrumentation and control systemsSECTION 8 - CANCELLEDNov 13, 2014
009Electrical power, instrumentation and control equipment, namely, low and medium voltage metal clad and metal enclosed switchgear, arc resistant switchgear, motor control centers, motor starters, circuit breakers, disconnect switches both fused and unfused, generator controls, low and medium voltage bus ducts; drilling rig control systems used for monitoring different functions of drilling rig operations, monitoring and control apparatus for monitoring hazardous conditions and shutting down electrical and mechanical systems when conditions reach pre-determined levels, portable power and control system buildings used for power control and distribution, alternating current drives for power control and distribution, digital and analog direct current drives for power control and distribution, wind power converters, utility grade solar power inversions systems; all for use in the oil, gas and chemical production, distribution and manufacturing industries and on oil and gas drilling rigs and in electrical power co-generation and other industrial and commercial electrical power, instrumentation and control systems; drilling rig automation systems comprising of hardware and software for monitoring and operating oil and gas drilling rig functions; electrical instruments used to control and monitor ballast in offshore drilling rigs and vessels; instruments for monitoring and controlling machinery on vessels; security systems for vessels comprising of hardware and software used to monitor, control and respond to access and usage of locations and equipment aboard vesselsSECTION 8 - CANCELLEDOct 30, 2014
037Construction, repair, maintenance and testing of electrical power, instrumentation and control equipment comprised of low and medium voltage metal clad and metal enclosed switchgear, including motor control centers, motor starters, circuit breakers, disconnect switches both fused and unfused, silicon controlled rectifier speed drives, drilling rig top drives, generator controls, drilling rig control systems, industrial shutdown systems, and traction motors, complete raceway systems, alternating current and direct current variable speed drives, lighting systems, high-voltage cable installation, communication systems, and security systems used in the oil, gas and chemical production, distribution and manufacturing industries, the pulp and paper industries, oil and gas drilling industries, electrical power co-generation and other industrial and commercial electrical power, instrumentation and control systemsSECTION 8 - CANCELLEDNov 13, 2014

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 22, 2025CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
Feb 10, 2024REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jun 16, 2021NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Jun 16, 2021C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Jun 16, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 9, 2021E815TEAS SECTION 8 & 15 RECEIVED—
Sep 30, 2020ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
May 20, 2020ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Feb 10, 2020REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Feb 10, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 6, 2015SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Jan 5, 2015CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Dec 3, 2014SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Nov 20, 2014IUAFUSE AMENDMENT FILED—
Nov 20, 2014EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Jul 25, 2014EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jul 24, 2014EX1GSOU EXTENSION 1 GRANTED—
Jul 23, 2014AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jun 26, 2014EXT1SOU EXTENSION 1 FILED—
Jun 26, 2014EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 31, 2013NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Nov 5, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 5, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 16, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 25, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 23, 2013DOCKASSIGNED TO EXAMINER—
Jun 20, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 15, 2013NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance