Drawing for ALNOR

USPTO serial 85969221

ALNOR

Reviewed by CopyMark Law Group

Reg. 4732171Status 800Registered
Filing date
Status date
Registration date
May 5, 2015
Examiner
BIBBINS, ODESSA
Law office

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with ALNOR?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Nicholas D. Wells

Nicholas D. Wells Legends Law Group, PLLC330 Main St.Kaysville, UT 84037United States

Goods and services

ClassDescriptionStatusFirst use
006metal conduits for central heating systems; metal ejector/deflectors for roofs; metal chimneys; metal assemblies of non-electrical cables; metal angle irons and corner pieces; metal conduits for ventilation and air-conditioning installations; bent metal tubes; metal building materials, namely, fascia, hood casings; metal pipe fittings for rigid pipes; metal pipe screens; metal bins; metal bars for welding and brazing; metal piping for installations; metal pipework for water distribution networks; metal pipework sleeves; metal pipe fittings; metal pressure pipes; metal gutter pipes; metal sealing joints; metal valves for water distribution networks; binding screws of metal for cables; central heating pipes of metal; chimney cowls of metal; chimney pots of metal; cable joints of metal, non-electric; manifolds of metal for pipelines; angle irons of metal; ducts of metal for ventilating and air conditioning installations; elbows of metal for pipes; building materials of metal, namely, ducts and round fittings for ventilation installations; branching pipes of metal; pipe muffs of metal; general purpose metallic containers for storage; rods of metal for brazing and welding; water-pipes of metal; metal junctions for pipes; junctions of metal for pipes; penstock pipes of metal; gutter pipes of metal; metal hardware, namely, bindings of metal; washers of metal for faucets; water-pipe valves of metal; metal valves for pipework; fire bars, namely, metal rods used in fireplace grates of metalACTIVEJan 1, 2015
011[apparatus for ventilating, namely, fans, recuperators, electric and gas water heaters for use in ventilation systems; heating boilers; radiators for central heating systems; radiator humidifiers for central heating systems; cooling equipment and installations for water; heat exchangers not being parts of machines; heat recovery units, namely, heat recovery ventilators; fans for air conditioning apparatus; water distribution installations,; heating elements; household and industrial installation air filters; regulating and safety accessories for gas apparatus, namely, pressure regulators for gas installations; commercial and industrial cookware, namely, gas boilers; gas clean-up devices, namely, gas injectors for disbursing solids and/or liquids for purification and sterilization purposes; gas scrubbers, namely, electro-chemical flue gas scrubbing machines; boiling equipment and installations, namely, boilers for heating installations; radiators; heating boilers; chimney flues; chimney flues for heating boilers; sauna bath installations; heating elements for baths; bath equipment, namely, shower and bath cubicles; air conditioning equipment; air conditioners for vehicles; solar collectors; fireplaces; air casings in the nature of chimney flues; air conditioning system hoods; suction hoods, namely, exhaust hoods for kitchens; cooling chambers, namely, cooling units for industrial purposes; solid, liquid and gas-fueled heating equipment, namely, heating furnaces for industrial purposes; hot water installations, namely, hot water tanks; fire bars; fireplaces; steam production installations, namely, apparatus for the exchange of substances and heat for use in the production of steam, for use in cooking and for use in refrigeration; automatic watering installations, namely, watering machines for agricultural purposes; air driers, namely, dryers for the removal of water vapor from compressed air and gases; mixer taps for water distribution ducts; sanitary installations in the nature of steam rooms; sanitary fittings, namely, pipes being parts of sanitary facilities; refrigerating cabinets; sewage treatment plants; waste water purification plants; water conditioning units; coils as part of heating and cooling installations; water decalcification instruments and devices, namely, tap water purifying apparatus; water sterilizers; drinking water filters; filters for air conditioning; humidifiers for central heating radiators; cooling installations for water; air conditioners; water conduits installations, namely, plumbing fittings in the nature of valves; clean chambers being sanitary installations, namely, clean rooms; gas condensers, other than parts of machines; boiler pipes for heating boilers; expansion tanks for central heating installations; air purifying apparatus and machines; air valves for steam heating installations; hot water heating tanks; air filtering installations; air conditioners; regulating accessories for water, gas or heating apparatus; drying apparatus and installation, namely, drying apparatus for use in heating, ventilation systems, air conditioning systems and refrigeration systems; air conditioning apparatus; ventilation and air-conditioning installations for vehicles; fans for air-conditioning apparatus; water purification installations for water supply; dampers for heating installations, namely, chimney dampers; pipe line cocks, namely, spigots; thermostatic valves being parts of heating installations]SECTION 8 - CANCELLEDJan 1, 2015
017[packing materials in the nature of glass wool used as an insulation material; insulating fabrics, namely, insulating blankets made of silica fibers; flexible pipes, not of metal; non-conducting materials for retaining heat, namely, thermoplastic and foamed plastic sections for use in the manufacture of windows, doors, façade glazings, and partition walls for use as building materials for heat-insulating applications; mineral wool for use as building insulator; slag wool for use as building insulator; rings of rubber for use as pipe connection seals; reinforcing materials, not of metal, for pipes; semi-processed plastic substances in the forms of films, sheets, tubes, bars or rods; gasket material in sheets for use in ventilation and air-conditioning apparatus, fittings and appliances; pipe gaskets; expansion joint fillers; clack valves of rubber for use in ventilation and air-conditioning apparatus, fittings and appliances; valves of India-rubber or vulcanized fiber; stuffing rings, namely, watertight rings for plumbing pipes; pipe fittings, not of metal, namely, for flexible compressed air pipes; semi-processed foams or films of plastic in the nature of filtering materials in ventilation and air-conditioning apparatus, fittings and appliances, namely, filtering mats for air filtering and parts of duct filters; non-metal fittings for flexible compressed air pipes; insulating paints; materials blocking heat radiation, namely, reflective insulating materials for use in assembly of ventilation systems in housing and industrial buildings; flexible tubes, not of metal; non-metallic tube fittings; sealant compounds for joints; glass wool for insulation; fiberglass fabrics for building insulation; insulating tapes; thermal insulating materials, namely, material for thermal insulation and fire protection, namely, fire-resistant composite panels made of aramid, glass, carbon, or ceramic fibers; insulating fabrics; non - metal seals for use in ventilation and air-conditioning apparatus, fittings and appliances; seals of rubber, namely, washers of rubber and vulcanized fiber; semi-worked synthetic resins in the nature of semi-finished products in the form of foams, fibers, films and sheets]SECTION 8 - CANCELLEDJan 1, 2015
019[non-metallic water ejector/deflectors for roofs; non-metallic pipe screens; non-metallic chimneys; non-metallic pipe fittings; non-metallic pressure pipes; non-metallic ducts for ventilation and air conditioning systems; non-metallic ducts for water distribution networks; prefabricated buildings, not of metal; building materials, not of metal, namely, plastic pipe supports; flashing, not of metal, for building; lengthening pieces, namely, non-metal tubing for chimneys; angle irons, not of metal; laths, not of metal; gutter pipes, not of metal; rigid pipes, not of metal being building materials; water-pipes, not of metal; non-metallic chimney ducts; water conduits installations, namely, plastic conduit for drainage; water-pipes, not of metal for use in sanitary systems; plastic conduits for the irrigation and the delivery of water; water conduits installations, namely, plastic conduit for irrigation; Junctions not of metal for ducts; non-metallic couplings for pipes]SECTION 8 - CANCELLEDJan 1, 2015
035[Distributorship services, retail store services, online retail store services, wholesale store services, online wholesales store services, all of the foregoing in the field of building materials, in particular for ventilation and air conditioning systems]SECTION 8 - CANCELLEDJan 1, 2015
037[ installation and repair of air-conditioning and ventilation apparatus; chimney sweeping; boiler cleaning and repair; installation and maintenance and repair of heating installations; furnace installation and repair; pipeline construction and maintenance ]SECTION 8 - CANCELLEDJan 1, 2015

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 11, 2026NP89NOTICE OF ACCEPTANCE OF PARTIAL SEC. 8 & 9 EMAILED
Feb 11, 2026RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Feb 11, 20269G8PREGISTERED - SEC. 9 GRANTED/CHECK RECORD FOR SEC. 8
Feb 11, 20268PRTREGISTERED - PARTIAL SEC. 8 (10-YR) ACCEPTED
Feb 7, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Nov 5, 2025E89RTEAS SECTION 8 & 9 RECEIVED
May 5, 2024REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
Sep 7, 2021NAS8NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED
Sep 7, 20218.PRREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED
Sep 7, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
May 4, 2021ES8RTEAS SECTION 8 RECEIVED
May 5, 2020REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
Jan 5, 2016TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
May 5, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 31, 2015SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
Mar 30, 2015CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
Mar 12, 2015SUPCSTATEMENT OF USE PROCESSING COMPLETE
Mar 10, 2015AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL
Feb 4, 2015IUAFUSE AMENDMENT FILED
Feb 4, 2015EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Nov 8, 2014TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Oct 28, 2014NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Sep 2, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Sep 2, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 13, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jul 26, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Jul 25, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jul 14, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jul 12, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jul 12, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 12, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 12, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 12, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 3, 2014ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN
May 31, 2014PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY
May 19, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
May 16, 2014ALIEASSIGNED TO LIE
May 5, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
May 5, 2014XAECEXAMINER'S AMENDMENT ENTERED
May 5, 2014GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
May 5, 2014GNEAEXAMINERS AMENDMENT E-MAILED
May 5, 2014CNEAEXAMINERS AMENDMENT -WRITTEN
Apr 2, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Apr 2, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Apr 2, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 10, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 10, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 10, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 3, 2013DOCKASSIGNED TO EXAMINER
Jul 8, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jun 28, 2013NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance