USPTO serial 85978025
Serial No. 85978025
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Nov 12, 2013
- Examiner
- HAN, DAWN L
- Law office
- GENERIC WEB UPDATE
What this means
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
Need help with Serial No. 85978025?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Tercel Oilfield Products USA LLC
Houston, TX
Tercel Oilfield Products USA LLC
Houston, TX
Tercel Oilfield Products USA LLC
Houston, TX
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Andrew J. Plummer
Andrew J. Plummer MH2 Technology Law Group1951 Kidwell, Suite 310Tysons Corner, VA 22182UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | [ Oil and gas well construction, namely, construction project management services in the field of construction of offshore oil and gas facilities; cementing services for oil and gas wells; construction of facilities, structures, living quarters and utility buildings, production modules and subsea modules in the oil and gas industry; consultancy services in the field of offshore oil and gas facility construction, oil and gas drilling, oil well drilling and completion in the nature of offshore oil and gas facility construction; ] installation, maintenance and repair of drilling machines and parts therefor in oil and gas well construction; installation of oil production apparatus; [ installation of oil exploration instruments; rental of oil and gas drilling platforms and drilling tools; bio-hazard biological clean-up services in the field of oil and gas wells; cleaning machines for oil and gas industrial machines; physical clean-up of exploration and drilling project locations to restore them to their original condition; wellbore installation; installation of oil and gas well casings, tubings and drill pipes; oil well drill pipe installation; cementing during well construction; interior sealing of oil and gas well liners; wirelining for oil wells; boring of wells to deepen them and to achieve multiple levels during well construction; installation of downhole tools to decrease wellbore geometry; ] technical consulting related to the installation of oil and gas equipment, control systems, and machinery; advisory and consultancy services in the field of oil extraction; [ disposal for others of drilling waste in the field of oil and gas wells; physical clean-up of oil and gas well exploration and drilling project locations to restore them to their original condition; advisory and consultancy services in relation to oil and gas extraction and to all the aforesaid services ] | ACTIVE | Dec 1, 2010 |
| 042 | Scientific and technological services, namely, scientific research, analysis and testing in the oil and gas fields and design relating thereto; industrial analysis and research services in the oil and gas fields; [ design and development of computer hardware and software; analysis services for oil field exploration; exploration and searching of oil and gas; geophysical exploration for the oil, gas and mining industries; oil and gas well testing; oil and gas prospecting, namely, well logging and testing; oil and gas field surveys; analysis of chemicals, oils, gases, greases and lubricants for oil workings; architectural design and industrial design associated with oil and gas fields, oil workings and gas and oil installations; industrial research services associated with oil and gas fields, oil workings and gas and oil installations; geological research and exploration for the oil and gas industries; conducting geological surveys; land surveying; geological prospecting; engineering drawing services; recording data for others on optical, digital and magnetic media for electronic storage of technical documents, technical reports and technical project study reports; research in the field of environmental protection; research and development for others in the oil, gas and mining fields; underwater exploration; calibration; quality control for others; material testing; design of oil well casings and liner setting tools; ] information, advisory and consultancy services relating to all of the aforesaid services | ACTIVE | Dec 1, 2010 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Tercel Oilfield Products USA LLC
- Other trademarks owned by Tercel Oilfield Products USA LLC
- Other trademarks owned by Tercel Oilfield Products USA LLC
- Other trademarks in Class 037
- Other trademarks in Class 042
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 16, 2024 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Apr 16, 2024 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Apr 16, 2024 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Apr 1, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Nov 8, 2023 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Nov 12, 2022 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Mar 31, 2021 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Jul 23, 2020 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Jul 23, 2020 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Jul 20, 2020 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| May 4, 2020 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Nov 12, 2018 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Nov 12, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 27, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 27, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 7, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 24, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 21, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 9, 2013 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 9, 2013 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 9, 2013 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 9, 2013 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 9, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 9, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 8, 2013 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jan 8, 2013 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jan 8, 2013 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 8, 2013 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 21, 2012 | MDSC | NOTICE OF DESIGN SEARCH CODE MAILED | — |
| Nov 20, 2012 | DPCC | DIVISIONAL PROCESSING COMPLETE | — |
| Nov 19, 2012 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Nov 19, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 19, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 19, 2012 | ALIE | ASSIGNED TO LIE | — |
| Nov 9, 2012 | DRRR | DIVISIONAL REQUEST RECEIVED | — |
| Nov 9, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 9, 2012 | ERTD | TEAS REQUEST TO DIVIDE RECEIVED | — |
| May 9, 2012 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 9, 2012 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 9, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 1, 2012 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 28, 2012 | MDSC | NOTICE OF DESIGN SEARCH CODE MAILED | — |
| Jan 27, 2012 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 27, 2012 | NWAP | NEW APPLICATION ENTERED | — |