Drawing for FIRSTENERGY SOLUTIONS

USPTO serial 85979363

FIRSTENERGY SOLUTIONS

Reviewed by CopyMark Law Group

Reg. 4504548Status 710
Filing date
Status date
Registration date
Apr 1, 2014
Examiner
KLINE, MATTHEW
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with FIRSTENERGY SOLUTIONS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Suzanne K. Ketler

SUZANNE K. KETLER ROETZEL & ANDRESS222 S MAIN ST STE 400AKRON, OH 44308-1500UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
035Business management consultation; auditing utility rates for others; energy bill auditing and rate analysis; consulting services relating to energy purchasing; consulting services relating to the purchase of industrial equipment and power co-generation, and other power supply equipmentSECTION 8 - CANCELLEDSep 1, 2001
037Installation, maintenance, and repair of outdoor lighting fixtures and outdoor architectural lighting for others; leasing of outdoor lighting fixtures; construction, installation, and maintenance of facilities and infrastructure for others for energy generation, transmission, storage, and distribution; installation and maintenance of industrial equipment and power co-generation and other power supply equipment; installation of computerized energy management systems; HVAC construction and maintenance services; consulting services relating to the design, installation, and maintenance of industrial equipment and power co-generation and other power supply equipment; consulting services relating to the installation of computerized energy management systems; consulting services relating to energy use and energy efficiency; installation and maintenance of refrigeration systemsSECTION 8 - CANCELLEDSep 1, 2001
039Public utility services in the nature of electricity distribution and natural gas distribution and transmissionSECTION 8 - CANCELLEDSep 1, 2001
040Generation of power through the operation of power generation equipment and facilitiesSECTION 8 - CANCELLEDSep 1, 2001
042Outdoor architectural landscape lighting design for others; consulting services relating to the design of computerized energy management systems; laboratory services, namely, equipment calibration, metrology, and predictive maintenance in the fields of energy use, energy management, and energy efficiencySECTION 8 - CANCELLEDSep 1, 2001

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 6, 2020C8..CANCELLED SEC. 8 (6-YR)—
Apr 1, 2019REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Apr 1, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 21, 2014DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Jun 20, 2013MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jun 19, 2013DPCCDIVISIONAL PROCESSING COMPLETE—
Jun 14, 2013MREINOTICE OF REINSTATEMENT MAILED—
Jun 14, 2013MREINOTICE OF REINSTATEMENT MAILED—
Jan 14, 2013MAB6ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Jan 14, 2013ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Dec 14, 2012IUCNNOTICE OF ALLOWANCE CANCELLED—
Dec 14, 2012RGOAREINSTATEMENT GRANTED - REMAIL OFFICE ACTION—
Jun 19, 2012EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jun 18, 2012EX2GSOU EXTENSION 2 GRANTED—
Jun 13, 2012EXT2SOU EXTENSION 2 FILED—
Jun 13, 2012EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 13, 2011EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Dec 9, 2011DRRRDIVISIONAL REQUEST RECEIVED—
Dec 9, 2011EX1GSOU EXTENSION 1 GRANTED—
Dec 9, 2011EXT1SOU EXTENSION 1 FILED—
Dec 9, 2011EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 9, 2011AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Dec 9, 2011ERTDTEAS REQUEST TO DIVIDE RECEIVED—
Jun 14, 2011NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Apr 19, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 19, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 16, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 16, 2011ALIEASSIGNED TO LIE—
Feb 27, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 26, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 25, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 25, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 31, 2010GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 31, 2010GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 31, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 30, 2010DOCKASSIGNED TO EXAMINER—
May 22, 2010MDSMNOTICE OF DESIGN SEARCH CODE MAILED—
May 21, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 20, 2010NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance