Drawing for SBC SAIA BURGESS CONTROLS

USPTO serial 86003553

SBC SAIA BURGESS CONTROLS

Reviewed by CopyMark Law Group

Reg. 4777795Status 800Registered
Filing date
Status date
Registration date
Jul 21, 2015
Examiner
THOMPSON, HEATHER
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with SBC SAIA BURGESS CONTROLS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Peter S. Sloane

Peter S. Sloane Leason Ellis LLPOne North Lexington Ave., Suite 1200White Plains, NY 10601United States

Goods and services

ClassDescriptionStatusFirst use
009[ Electric conductors; electric meters; electronic data loggers; ] Electronic smart meters for [ measuring flow, volume, ] energy [, temperature, pressure, and humidity ] ; computer network adapters, interface cards, and interface controllers; [ electricity network controllers; electric control panels; data access ports for use with electrical control panels for connecting multiple data and electrical devices; lighting control panels; lighting panel control boards; power access ports for use with electrical control panels for connecting multiple data and electrical devices; ] electrical control devices for energy management and savings; [ electrical switching apparatus; ] programmable logic controllers (PLC); pre-programmed logic controllers; software to control building environment [, access and security systems ] ; industrial automation controls, automation stations in the nature of controls for machine and process automation for industrial use; electric luminescent display panels, namely, text displays, data displays, graphical displays, industrial displays, displays for controls for buildings, rooms, machines, vending machines, and automatic processes; [ electricity branch boxes; electricity junction boxes; circuit breakers; printed circuits; integrated circuits; ] electrical switches, namely, timer switches [, locking switches, short-time switches, remote controlled switches, automatic switches for staircases, pressure switches, rotary selector switches, float-type switches, program switches, reversal switches, miniature switches, and current impulse switches ] ; electric and electronic relays, namely, time-delay relays or time lapse relays, * and * impulse relays [, stepping relays, booting relays, latching relays, fluid pressure relays, and pilot relays ] ; [ automatic electronic pressure control instruments; controllers for level regulators and flow regulators for domestic, commercial and industrial use; illumination regulators, induction voltage regulators, static voltage regulators, voltage regulators, voltage regulators for electric power and fluid pressure regulators; electric installations for the remote control of industrial operations; electronic apparatus for the remote control of industrial operations; remote controls for motors; electronic sensors for anti-theft automotive alarms; remote control transmitters and receivers for remote controls; radio controls; remote circuit breaker control switch operators; remote control starters for vehicles; remote control telemeters; remote control transmitters for radio-controlled devices; remote controls for radios, televisions, stereos, multi-media devices, and computers; apparatus and instruments for remote management, namely, electronic control systems for remote observation, management and operation of machines and devices comprised of computers, software, electromechanical controls, video display screens, sensors and power management devices; telecommunications transmitters; electronic data transmitters; computer data servers ]ACTIVEFeb 2, 2013

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 29, 2025NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Oct 29, 2025RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Oct 29, 202589AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Oct 29, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 10, 2025E89RTEAS SECTION 8 & 9 RECEIVED—
Jul 21, 2024REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jun 27, 2022NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Jun 27, 2022C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Jun 27, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 21, 2022E815TEAS SECTION 8 & 15 RECEIVED—
Jul 21, 2020REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jul 21, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 30, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 30, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 16, 2015SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Jun 15, 2015CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
May 26, 2015SUPCSTATEMENT OF USE PROCESSING COMPLETE—
May 15, 2015IUAFUSE AMENDMENT FILED—
May 15, 2015EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Apr 7, 2015EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Apr 6, 2015EX1GSOU EXTENSION 1 GRANTED—
Apr 2, 2015AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Feb 27, 2015EXT1SOU EXTENSION 1 FILED—
Feb 27, 2015EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 2, 2014NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 8, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 8, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 18, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 3, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 29, 2014ALIEASSIGNED TO LIE—
May 15, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 15, 2014XAECEXAMINER'S AMENDMENT ENTERED—
May 15, 2014GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 15, 2014GNEAEXAMINERS AMENDMENT E-MAILED—
May 15, 2014CNEAEXAMINERS AMENDMENT -WRITTEN—
May 5, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 5, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 5, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 10, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 9, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 9, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 26, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 26, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 26, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 17, 2013DOCKASSIGNED TO EXAMINER—
Jul 17, 2013MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jul 16, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 10, 2013NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance