USPTO serial 86017396
METRALABS
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Aug 16, 2016
- Examiner
- SHANOSKI, JOANNA MARIE
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with METRALABS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Grossmehring, DE
Grossmehring, DE
Grossmehring, DE
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Mobile robots and mobile robotic platforms for use in manufacturing other goods and structural parts therefor; mobile robots and mobile robotic platforms for industrial use and structural parts therefor; mobile robots and mobile robotic platforms for use as automated production equipment, for manufacturing and assembling goods, and structural parts therefor; mobile robots and mobile robotic platforms for automated production and for use with automated production equipment and systems; mobile robots and mobile robotic platforms for controlling industrial processes; mobile robot based automation equipment; industrial mobile robots and industrial mobile robotic platforms for transportation and handling of goods and tools, and structural parts therefor; mobile robots and mobile robotic platforms for guiding and carrying manufactured items along an assembly line, guiding products into bins for packaging, for guiding persons to certain destinations in workshops, facilities and buildings, and structural parts therefor; robot arms, grippers and end effectors as mechatronic and pneumatic parts of machines and machine tools; robotic tool changers; kits for building industrial mobile robotic machines, mobile robotic platforms, and mobile industrial robots consisting primarily of a programmable mobile robot driving base, robot arm, tool couplers, end effectors, and also including robot sensors and actuators, electronics, data acquisition, storage and processing equipment, multimedia input/ output devices, and corresponding control software; industrial mobile robots and mobile robotic platforms for inspection, surveillance and monitoring of preassembled and assembled products, industrial environmental conditions, critical processes, workplaces, shop floors, assembly line machinery in difficult to reach locations, facilities, buildings and properties for maintaining structural integrity, detecting critical and dangerous situations, keeping defined environmental and working conditions and product quality, and structural parts therefor; robots for use in industrial metrology, industrial clean rooms, fuel cell manufacturing, quality assurance testing, medical device manufacturing, and semiconductor and solar panel manufacturing | SECTION 8 - CANCELLED | Jan 1, 2016 |
| 009 | Mobile robots and mobile robotic platforms for personal, educational, laboratory and hobby use, and structural parts therefor; mobile robots and mobile robotic platforms for conducting scientific experiments and investigations, and structural parts therefor; scientific research mobile robots and mobile robotic platforms for inspecting, monitoring, surveying and controlling environmental conditions, and exploration of specific and unknown areas, and structural parts therefor; interactive mobile robots and interactive mobile robotic platforms for use as professional mobile service robots for providing personal assistance and information to visitors and customers in museums, retail environments, entertainment and amusement parks, commercial businesses, banks, airports, and entertainment facilities, and structural parts therefor; mobile social robots and structural parts therefor; mobile robots and mobile robotic platforms for interacting with people, interviewing and guiding people, and conduction marketing analysis in retail areas, and structural parts therefor; mobile entertainment robots and mobile entertainment robotic platforms, and structural parts therefor; mobile robots and mobile robotic platforms for use in shopping, and structural parts therefor; computer hardware, computers and computer software for robotic systems and applications; computer hardware and computer software for use in controlling robotic systems and robotic system applications; computer hardware, sensors and computer software for localization, navigation and autonomous driving of mobile robots; computer hardware, sensors, interfaces, actuators and computer software for use in and for operating mobile robots; robots for use in scientific mobile exploration and surveillance, laboratory metrology, laboratory clean rooms, fluidics research, tactical mapping robots for large-scale deployment, computer hardware and computer software for use in controlling mobile robotic systems; robots for personal use, and structural parts therefor | SECTION 8 - CANCELLED | Jan 1, 2016 |
| 010 | Mobile hospital robots for administering medical procedures, namely, post-operative treatments after surgical procedures, rehabilitation after stroke, administering medication, providing medical assistance to patients, and providing medical assistance in support of healthcare staff, and structural parts therefor | SECTION 8 - CANCELLED | Jan 1, 2016 |
| 028 | Toy robots, robotic toy vehicles, and toy mobile robot platforms, and structural parts therefor; toy robots for entertainment and pleasure, and structural parts therefor | SECTION 8 - CANCELLED | Jan 1, 2016 |
| 042 | Research, development, custom design, engineering, technology and deployment consulting, testing and advisory in the field of robots and their parts, and computer hardware and software for robots; research, development, design, engineering, consultation, testing and advisory services in the field of computer software and computer hardware for mobile robotic systems and applications; Design, maintenance, repair and updating of computer software for use with robots; providing information concerning robots, and computer software engineering and design; custom design of mobile robot based automation equipment, and structural parts therefor | SECTION 8 - CANCELLED | Jan 1, 2016 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Welser, Manuel
- Other trademarks owned by Welser, Manuel
- Other trademarks owned by Welser, Manuel
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 010
- Other trademarks in Class 028
- Other trademarks in Class 042
- Similar marks named METRALABS
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 3, 2023 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Aug 16, 2021 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Aug 16, 2016 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 12, 2016 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Jul 11, 2016 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Jul 8, 2016 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Jun 16, 2016 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| May 24, 2016 | IUAF | USE AMENDMENT FILED | — |
| May 24, 2016 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Nov 24, 2015 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Sep 29, 2015 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 29, 2015 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 9, 2015 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 25, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 24, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 24, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 22, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 22, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 23, 2015 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 23, 2015 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 23, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 23, 2015 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Feb 10, 2015 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jan 28, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jan 28, 2015 | ALIE | ASSIGNED TO LIE | — |
| Jan 8, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 7, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 7, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 7, 2015 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Dec 9, 2014 | GNS1 | NOTIFICATION OF SUBSEQUENT FINAL EMAILED | — |
| Dec 9, 2014 | GNCF | CONTINUATION OF FINAL REFUSAL E-MAILED | — |
| Dec 9, 2014 | CNCF | ACTION CONTINUING A FINAL - COMPLETED | — |
| Nov 18, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 18, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 18, 2014 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| May 19, 2014 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| May 19, 2014 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| May 19, 2014 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| May 5, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 4, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 4, 2014 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 6, 2013 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 6, 2013 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 6, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 5, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 27, 2013 | MPMK | NOTICE OF PSEUDO MARK E-MAILED | — |
| Jul 26, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 26, 2013 | NWAP | NEW APPLICATION ENTERED | — |