Drawing for Serial No. 86023386

USPTO serial 86023386

Serial No. 86023386

Reviewed by CopyMark Law Group

Reg. 4810825Status 800Registered
Filing date
Status date
Registration date
Sep 15, 2015
Examiner
SWAIN, MICHELE LYNN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with Serial No. 86023386?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Timothy J. Maier

Timothy J. Maier Maier & Maier, PLLC345 South Patrick St.Alexandria, VA 22314United States

Goods and services

ClassDescriptionStatusFirst use
037Building construction; Plant construction; Building construction services; Plant construction services; General civil engineering works, namely, construction, repair and modernization of infrastructure, installations and apparatus, namely, buildings; Machinery installation; Plumbing; Electrical works, namely, installation, maintenance and repair of electrical systems; Instrumentation works, namely, installation, maintenance and repair of instruments for controlling electrical, heating, ventilation, and air conditioning systems in buildings, and of instruments used for automated or partly automated industrial operations; Painting; Dredging; Maintenance of energy generation facilities; Maintenance of chemical plants; Maintenance of utility system plants, namely, water supply plants, water treatment plants, electricity production plants and fuel supply plants; Maintenance of food manufacturing and processing plants; Maintenance of machinery manufacturing plants; Maintenance of environmental protection facilities, namely, facilities for the reduction of air, water and soil pollution; Maintenance of warehouse and distribution facilities; Maintenance of medicinal chemical manufacturing plants; Maintenance of materials processing and assembly plants; Maintenance of automobile plants; Construction consultancy, namely, consultancy in the field of constructing buildings for utilities, industrial companies, commercial companies and governments; Building construction supervision; Inspection and maintenance of plant facility, namely, inspection during the course of construction of industrial plants, and maintenance of industrial plant buildings; Providing information on construction, repair, restoration, maintenance and installation in the field of general construction contracting; Consultancy relating to installation, maintenance and repair services in the field of general construction contracting; Supervision of construction projects; Maintenance of computer network systems, namely, computer hardware systemsACTIVE—
042Construction drafting; Civil engineering services; Designing of electrical plant; Designing of communications plant; Designing of chemical plant; Designing of ironmaking plant; Designing of utility system plant; Designing of food manufacturing and processing plant; Designing of machinery manufacturing plant; Designing of environmental protection facilities system; Designing of storage and transport facilities system; Designing of medicinal chemical manufacturing plant; Designing of process and assembly plant; Designing of automobile plant; Research and development of technology in the fields of environmental protection, food manufacturing, process and assembly, medicinal chemical manufacturing, stockpiling and distribution facilities, utility system, machinery manufacturing plants, chemical and fine chemical plants, energy production facilities, information processing facilities, facilities for the prevention of pollution, coal, nuclear power and alternative energy production facilities, and biotechnology facilities; Computer software design, computer programming; Maintenance of computer software; Environmental assessment, namely, environmental testing and inspection services; Industrial research, namely, conducting of feasibility studies in the field of environmental engineering; Industrial research, namely, conducting of feasibility studies in the field of new technologies; Design and programming of computer network systems; Information processing using computer, namely, computer system administration for othersACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 19, 2025NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Sep 19, 2025RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Sep 19, 202589AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Sep 14, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 15, 2025E89RTEAS SECTION 8 & 9 RECEIVED—
Sep 15, 2024REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Nov 4, 2021NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Nov 4, 2021C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Nov 4, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 30, 2021E815TEAS SECTION 8 & 15 RECEIVED—
Sep 15, 2020REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Sep 15, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 30, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 30, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 10, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 27, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 27, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 11, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 11, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 11, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 14, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 14, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 14, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 7, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 7, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 6, 2014ALIEASSIGNED TO LIE—
Nov 5, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 24, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 24, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 24, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 1, 2014RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Jun 23, 2014ALIEASSIGNED TO LIE—
Jun 7, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 7, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 7, 2014ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Dec 14, 2013GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Dec 14, 2013GNSLLETTER OF SUSPENSION E-MAILED—
Dec 14, 2013CNSLSUSPENSION LETTER WRITTEN—
Nov 28, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 28, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 28, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 17, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 17, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 17, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 13, 2013DOCKASSIGNED TO EXAMINER—
Aug 6, 2013MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Aug 5, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 2, 2013NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance