Drawing for BAUER PASSION FOR PROGRESS

USPTO serial 86024698

BAUER PASSION FOR PROGRESS

Reviewed by CopyMark Law Group

Reg. 4729934Status 800Registered
Filing date
Status date
Registration date
May 5, 2015
Examiner
CORDOVA, RAUL
Law office

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with BAUER PASSION FOR PROGRESS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Trevor C. Jackson

Trevor C. Jackson HOFFMAN WARNICK LLC540 BROADWAY STE 4ALBANY, NY 12207-2708United States

Goods and services

ClassDescriptionStatusFirst use
001[ Suspension and drilling chemical fluids for construction drilling and mining ]SECTION 8 - CANCELLED
006[ Metal building materials of steel, aluminum, aluminum alloys and copper, namely, beams, panels, boards, frameworks, nails, rivets, bolts, screws; anchors, mainly of metal, for anchoring components in the ground, and components thereof, namely, anchor bills, anchor friction elements, anchor heads; metal tie rods and tension cables for earth anchors, metal soil nails for anchoring components in the ground; expandable earth anchors, spiral-wound earth anchors; temporary flood protection walls of metal; metal drill tubing, metal drill pipe and metal pipe and rod couplings for use therewith ]SECTION 8 - CANCELLED
007[ Building machines, namely, excavators, front shovels, loaders, tool carriers, soil compactors and structural parts thereof; drilling rigs for civil engineering and for the exploration of raw material sources and structural parts thereof; drilling tools, namely, bits for downhole earth drills; power-operated auger blades; excavating machines, namely, diaphragm wall cutters and diaphragm wall grabbers, and structural parts thereof; hydraulic units, namely, hydraulic couplers, hydraulic power transmitters, and hydraulic drives; vibrators for making drill holes and for compressing earth and building material, in particular depth vibrators and top vibrators for inserting sheet piles or posts, and structural parts thereof; sheet pile presses; pile-driving and free-flying hammers for hammering down sheet pile walls and posts; excavating machines, namely, racks for diaphragm wall cutters, diaphragm wall grabbers, depth vibrators and depth compressors and top vibrators for earth compaction; cable excavators and structural parts thereof; wheeled cranes and structural parts thereof; pneumatic and hydraulic compacting and drawing tools, presses for earth compaction, and pumps for transporting fluids and solid/liquid mixtures; industrial mixers for solid/liquid suspensions, mechanical separators for separating soil components from aqueous solutions, in particular sand removal installations; industrial decanter and precipitation reactors for use in processing solid/liquid suspensions; hydraulic and power-operated ramming devices for civil engineering applications and structural parts thereof; ground stabilization machines, namely, compressors and compactors; on-site mechanical soil mixers; displacement drilling rigs and structural parts thereof; top drilling rigs and structural parts thereof; racks for cranes and construction equipment, and displacement drilling machines; geothermal and deep-drilling rigs; mobile cranes and structural parts thereof; pneumatic lifting cushions for well casing pipes; capsule presses for well casing pipes; drilling rigs with multiple drilling heads; drill rig for extracting soil samples ]SECTION 8 - CANCELLED
009[ Heat sensing probes of metal for geothermal applications; post and trench inclinometers; measurement installations, namely, position sensors for measuring a position or orientation of a post or trench; pile inclinometers, measuring apparatus, namely, optical or acoustic position sensors, Load sensing cells ]SECTION 8 - CANCELLED
011[ Filter and mixer for cleaning and filtering removed water and gases from construction and mining sites ]SECTION 8 - CANCELLED
019[ Non-metal construction materials for use in special civil engineering, foundation engineering, deep drilling, geothermics, water supply, well construction, mining and flood protection applications, namely, cement, concrete and compressed earth ]SECTION 8 - CANCELLED
037[ Drilling for the exploration of raw material sources, in particular oil, gas and water; Geothermal and deep well drilling; ] mining extraction of ore, stones and minerals; Building construction supervision; [ Water extraction; oil, natural gas, minerals, and ] ore deposit exploration; mining and drilling extraction of raw materials, namely, ore, stones and mineralsACTIVE
040[ Environmental remediation services for cleaning and treatment of soil, water and air ]SECTION 8 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 29, 2025NP89NOTICE OF ACCEPTANCE OF PARTIAL SEC. 8 & 9 EMAILED
Aug 29, 2025RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Aug 29, 20259G8PREGISTERED - SEC. 9 GRANTED/CHECK RECORD FOR SEC. 8
Aug 29, 20258PRTREGISTERED - PARTIAL SEC. 8 (10-YR) ACCEPTED
Aug 28, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Apr 23, 2025E89RTEAS SECTION 8 & 9 RECEIVED
May 5, 2024REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
Mar 17, 2021NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
Mar 17, 2021C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
Mar 16, 2021EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Feb 1, 2021PR23POST REGISTRATION ACTION MAILED - SEC. 8 & 15
Feb 1, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Oct 16, 2020E815TEAS SECTION 8 & 15 RECEIVED
May 5, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 17, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 28, 2015NPUBNOTICE OF PUBLICATION
Jan 14, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Jan 12, 2015ALIEASSIGNED TO LIE
Dec 20, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Nov 26, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Nov 25, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Nov 25, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 27, 2014CPRAPRIORITY ACTION MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
May 23, 2014CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
May 8, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED
May 8, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
May 8, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 4, 2014DOCKASSIGNED TO EXAMINER
Nov 21, 2013CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 20, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 14, 2013DOCKASSIGNED TO EXAMINER
Oct 3, 2013AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED
Sep 30, 2013ALIEASSIGNED TO LIE
Sep 25, 2013PARITEAS VOLUNTARY AMENDMENT RECEIVED
Aug 7, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Aug 3, 2013NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance