What this means

Status 705 means a Madrid-based U.S. registration has accepted Section 71 maintenance and Section 15 incontestability. The U.S. extension is active with strengthened rights. Track next renewal deadlines in TSDR and WIPO records.

Status 705: Status 705 means a Madrid-based U.S. registration has accepted Section 71 maintenance and Section 15 incontestability. The U.S. extension is active with strengthened rights.

Need help with CCL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Matthew J. Kinnier

Matthew J. Kinnier HOFFMAN WARNICK LLC6 Tower PlaceALBANY, NY 12203United States

Goods and services

ClassDescriptionStatusFirst use
006Construction materials made wholly or principally of common metal for use with wire ropes, cables, and slings for lifting precast concrete fabrications, namely, splices for connecting reinforcing bars for use in concrete columns, splices for making up wire nets, anchor sockets that form part of a concrete element, sleeves, namely, junction sleeves for non-electric cables, loops and thimbles, fixing bolts, fixing screws, fixing plates, and fixing holders; metal moulds for forming concrete fabrications, namely, ducts, formers, spacers, sheathing, thrust rings, bearing plates, anchor plates, locking rings, helix springs, anchorage castings, compression grips, wedge grips, and mechanical gripping devices, not being hand tools or machines; metal hardware for use in connection with non-electric overhead cables and with stressed cable constructions, namely, connectors, couplers, joints, sleeves, clamps, anchor lugs, line taps, loop stirrups, cable socks, cable rollers, cable blocks; industrial metal high pressure hose and fittings therefor; metal mechanical bearings other than parts of machines for use in the pre-stressing and post-tensioning of engineered structuresACTIVE—
007Electric, hydraulic, and power lifting jacks and pumps, all for use in civil engineering construction or the construction of other engineered structures; machines for use in the mixing and setting of concrete and of colloidal mixes, namely, concrete mixers, concrete mixing trucks and portable concrete mixers for on-site use; machines for vibrating and pre-stressing concrete in moulds and in forms; power operated machines and power operated apparatuses, all for use in vibrating and compacting concrete masses and for compacting ground surfaces of building areas; power operated pushing machines for use with wire ropes, strand and other steel tensile elements; power operated cutting machines incorporating annealing devices, and for use with wire ropes; power operated hand held tools, namely, hydraulic jacks, saws and clippers for cutting tensing elements and wire, hydraulic pumps for use in civil engineering construction or the construction of other engineered structures, and flexible drives and grinding attachments for use therewith; power operated industrial machine presses for use in civil engineering construction or the construction of other engineered structures, none being for printing; motors other than for land vehicles for use with all the aforesaid goods [; machines for the production of hollowcore pre-cast units for use in pre-stressed concrete in the construction field; machines for curing of concrete, namely, by water heating systems and electrical heating elements ]ACTIVE—
008[Hand operated hydraulic presses for use in civil engineering construction or the construction of other engineered structures; hand operated jacks, hand tools, and parts thereof, namely, hydraulic jacks, saws and clippers for cutting tensing elements and wire, and hand-operated hydraulic pumps, all for use in civil engineering construction or the construction of other engineered structures, and for use with strands, wires and with cables; hand operated pumps and parts therefor, for use in civil engineering construction or the construction of other civil engineered structures, and for lifting engineered structures and tensile bars]SECTION 8 - CANCELLED—
009Hand operated tools in the nature of electronic instrumentation for the measurement of forces, strength, and corrosion in concrete structures; gripping and locating devices, namely, anchorage connectors for use in supporting workmen in the course of operations on overhead cables for the purpose of pre-stressing and post-tensioning civil engineering structures and other engineered structures; power operated hand held tools, namely, measurement devicesACTIVE—
011[Pre-stressing beds, stressing units, and vibration beds, namely, heat stress machines having temperature controlled ceramic heating elements for heating tubes, pipes, and welds, all for use in the production of pre-cast concrete fabrications]SECTION 8 - CANCELLED—
019[ Rubber and elastomeric bearing pads and strips, all for use in engineered structures, namely, buildings and bridges ]ACTIVE—
037The construction, maintenance and repair of civil engineering structures and other engineered structures, namely, residential buildings, commercial buildings, office buildings, mixed use buildings, arts, cultural and entertainment buildings, educational facilities, health facilities, worship buildings, hotels, car parks, historic monuments, museums, bridges, subways and railways, nuclear power stations, oil drilling facilities, factories, warehouses and industrial facilities, power stations, containment structures, wind turbines, road underpasses and overpasses, soil structures, marine structures including ports, marinas, and dams, tanks for gas, oil, water, and waste, shopping malls, government buildings, law enforcement buildings, military buildings and structures, airports and transport stations; the mechanical joining together of strand reinforcing bars predominantly used in reinforced concrete structures; stressing of concrete; construction, maintenance and repair of pre-cast concrete plants, namely, pre-cast and pre-stressed concrete factories; engineering services, namely, repair of engineered structuresACTIVE—
040[Metal treatment; metal fabrication services, namely, the mechanical joining of metal products]SECTION 8 - CANCELLED—
042Engineering design services; engineering services, namely, structural investigation of engineered structures; design of pre-cast and pre-stressed concrete factories, including software designACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 24, 2026PUM1OFFICE ACTION ISSUED POU1—
Sep 23, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 25, 2026E89RTEAS SECTION 8 & 9 RECEIVED—
Mar 29, 2025REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Aug 10, 2023NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Aug 10, 2023C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Jul 11, 2023EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Mar 29, 2023PR23POST REGISTRATION ACTION MAILED - SEC. 8 & 15—
Mar 11, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 26, 2022E815TEAS SECTION 8 & 15 RECEIVED—
Mar 29, 2021REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Mar 29, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 25, 2016DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Feb 20, 2016AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jan 25, 2016IUCNNOTICE OF ALLOWANCE CANCELLED—
Jan 25, 2016D1BRTEAS DELETE 1(B) BASIS RECEIVED—
Nov 3, 2015NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Sep 8, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 8, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 19, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 5, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 5, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 5, 2015XAECEXAMINER'S AMENDMENT ENTERED—
Aug 5, 2015GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 5, 2015GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 5, 2015CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 5, 2015ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jul 14, 2015PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jun 29, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 25, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 24, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 24, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 19, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 28, 2015GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 28, 2015GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 28, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 8, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 8, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 7, 2015ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jul 11, 2014GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jul 11, 2014GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 11, 2014CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 16, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 16, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 5, 2014ALIEASSIGNED TO LIE—
May 22, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 5, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 5, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 5, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 4, 2013DOCKASSIGNED TO EXAMINER—
Aug 28, 2013MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Aug 27, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 22, 2013NWAPNEW APPLICATION ENTERED—