USPTO serial 86049695
MISEAN ELECTRICAL ENGINEERING
Reviewed by CopyMark Law Group
Reg. 4536579Status 710
- Filing date
- Status date
- Registration date
- May 27, 2014
- Examiner
- LORENZO, KATHLEEN H
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with MISEAN ELECTRICAL ENGINEERING?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
SAN DIEGO, CA
SAN DIEGO, CA
SAN DIEGO, CA
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 042 | Architectural and engineering services; Computer-aided engineering services for others; Conducting engineering surveys; Consultation in the field of fuel monitoring and metering for gas turbine and combustion engines; Consultation in the field of gas turbine and combustion engine design; Consulting in the field of auxiliary design for ELECTRICAL ENGINEERING; Consulting in the field of engineering; Consulting services in the field of design and development of engineering processes; Consulting services in the field of designing engines to be more efficient; Consulting services in the field of industrial engineering; Consulting services in the field of search engine optimization; Creation of control programs for electric operation control and drive modules; Custom design and engineering of telephony systems, cable television systems and fiber optics; Custom design and engineering of ELECTRICAL SYSTEM; Design and development of automated controller systems, namely, temperature, humidity and electrical controllers; Design and development of automated home controller systems, namely, temperature, humidity, and electrical controllers; Design of engineering products; Design/planning and engineering of compressed-air stations; Development, maintenance and updating of a telecommunication network search engine; Drafting of plans and engineering drawings for others; Electric meter reading and data analysis; Electricity and natural gas services, namely, meter data management and analysis; Electricity and natural gas services, namely, meter reading; Electricity and natural gas services, namely, metering; Electronic and electrical systems design services; Engineering; Engineering and system analysis in the field of home security systems; Engineering design services; Engineering drawing services; Engineering services for building and property condition assessment, facility management, repair and restoration and building instrumentation; Engineering services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; Engineering services in the field of energy efficiency; Engineering services in the field of reduction of operating costs, fuel blending, waste handling, quality performance of co-products and by-products, and chemical distribution; Engineering services in the fields of traffic and transportation; Engineering surveying; Environmental engineering, testing and inspection services; Environmental services, namely, design for others in the field of environmental engineering; Environmental services, namely, technical consultation in the field of environmental science, engineering services and design for others in the field of environmental engineering; Inspection services, namely, detection of plumbing and roof leaks, termites, and electrical conditions in the inaccessible areas of an existing structure or home and/or wall(s) and void(s) by means of infrared imaging units; Metering and monitoring electric power consumption by third parties for electric power providers; Product development and engineering services for others; Providing planning and engineering services in the field of information and communications networks; Technical consultation in the field of environmental science, engineering services, design for others in the field of energy engineering, designing and testing of energy products for others; Technical consultation in the field of power plant engineering, namely, testing and evaluation of power plant equipment to improve performance and efficiency of such equipment; Technical consulting in the field of environmental engineering; ELECTRICAL engineering | SECTION 8 - CANCELLED | Feb 22, 2011 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 1, 2021 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| May 27, 2019 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| May 27, 2014 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 11, 2014 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 11, 2014 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 19, 2014 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 31, 2014 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jan 25, 2014 | ALIE | ASSIGNED TO LIE | — |
| Jan 2, 2014 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 30, 2013 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Dec 30, 2013 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Dec 30, 2013 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Dec 30, 2013 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Dec 11, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 10, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 10, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 10, 2013 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 10, 2013 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 10, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 10, 2013 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 6, 2013 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 30, 2013 | NWAP | NEW APPLICATION ENTERED | — |