Drawing for THE NUTS AND BOLTS OF GREEN

USPTO serial 86141486

THE NUTS AND BOLTS OF GREEN

Reviewed by CopyMark Law Group

Reg. 5010461Status 710
Filing date
Status date
Registration date
Aug 2, 2016
Examiner
MICHELI, ANGELA M
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with THE NUTS AND BOLTS OF GREEN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Noland J. Cheung

Noland J. Cheung Cohen & Grigsby, P.C.625 Liberty AvenuePittsburgh, PA 15222-3152UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007pneumatic transporters; bulk handling and conveying equipment, namely, conveyors for handling bulk equipment in the nature of steel, stainless steel and aluminum silos; machinery, namely, vacuum distillation equipment; conveying system equipment, namely, blowers; vacuum filters, namely, pressure receivers; bulk material handling machines, namely, discharging membrane hoppers; cyclone material separators; pump control valves; valves for pumps; valves being parts of machines in the nature of screw feeders and ribbon blenders; machinery, namely, bulk material compacting machines; couplings for machines; bulk front end bag loaders and unloaders; rotary valves being parts of machines; bin vent filters being parts of machines; lime slakers, namely, machines for producing hydrated lime having a classifying tank and an impeller mixer; conveyors; pneumatic transfer equipment for bulk materials, namely, dischargers, receivers, blowersSECTION 8 - CANCELLED—
037installation and maintenance of equipment for the conveyance, storage and handling of bulk materials and chemicals; installation and maintenance of bulk material storage silos and conveyors; installation of liquid storage reservoirs for municipal and industrial use; installation and maintenance of flue gas desulphurization systemsSECTION 8 - CANCELLED—
042design and engineering of bulk material handling systems; design of bulk material storage silos and conveyors; design of liquid storage reservoirs for municipal and industrial use; design of flue gas desulphurization systemsSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 17, 2023C8..CANCELLED SEC. 8 (6-YR)—
Aug 2, 2021REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jul 3, 2019ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Nov 10, 2017ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 10, 2017REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 2, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 30, 2016DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Jun 25, 2016AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
May 31, 2016IUCNNOTICE OF ALLOWANCE CANCELLED—
May 31, 2016D1BRTEAS DELETE 1(B) BASIS RECEIVED—
Dec 15, 2015NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Oct 20, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 20, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 30, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 14, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 8, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 4, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 4, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 28, 2015ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Jul 1, 2015GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jul 1, 2015GNSLLETTER OF SUSPENSION E-MAILED—
Jul 1, 2015CNSLSUSPENSION LETTER WRITTEN—
Jul 1, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 1, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 24, 2015ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Jan 16, 2015GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Jan 16, 2015GNSIINQUIRY TO SUSPENSION E-MAILED—
Jan 16, 2015CNSISUSPENSION INQUIRY WRITTEN—
Jan 15, 2015RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Jan 14, 2015ALIEASSIGNED TO LIE—
Jun 6, 2014GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jun 6, 2014GNSLLETTER OF SUSPENSION E-MAILED—
Jun 6, 2014CNSLSUSPENSION LETTER WRITTEN—
Jun 4, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 3, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 3, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 23, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 23, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 23, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 21, 2014DOCKASSIGNED TO EXAMINER—
Dec 26, 2013NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—

Frequently asked questions

Related guidance