Drawing for ECS ENGINEERING CONSULTING SERVICES, INC.

USPTO serial 86154511

ECS ENGINEERING CONSULTING SERVICES, INC.

Reviewed by CopyMark Law Group

Reg. 4706395Status 800Registered
Filing date
Status date
Registration date
Mar 24, 2015
Examiner
MEYERS, MORGAN LAURA
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with ECS ENGINEERING CONSULTING SERVICES, INC.?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Stephen A. Seach, Jr.

Stephen A. Seach, Jr. SERVILLA WHITNEY LLC33 WOOD AVENUESuite 830ISELIN, NJ 08830

Goods and services

ClassDescriptionStatusFirst use
042Architectural and engineering services; Civil engineering; Conducting feasibility studies in the field of environmental engineering; Consulting in the field of engineering; Consulting in the field of structural engineering; Consulting in the fields of engineering and architecture; Consulting services in the field of industrial engineering; Drafting of plans and engineering drawings for others; Engineering; Engineering and habitat restoration design services in the field of wetland preservation; Engineering design services; Engineering drawing services; Engineering services for building and property condition assessment; Engineering services in the field of environmental compliance; Environmental services, namely, design for others in the field of environmental engineering; Environmental services, namely, technical consultation in the field of environmental science, engineering services and design for others in the field of environmental engineering; Hydraulic engineering and design; Structural engineering design services; all of the aforementioned services excluding onshore and offshore projects in the oil and gas industryACTIVESep 20, 2000

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 11, 2025NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Mar 11, 2025RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Mar 11, 202589AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Mar 11, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 4, 2024E89RTEAS SECTION 8 & 9 RECEIVED—
Nov 4, 2024EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Nov 4, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 4, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 4, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Mar 24, 2024REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jun 9, 2021NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Jun 9, 2021C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Jun 9, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 3, 2021E815TEAS SECTION 8 & 15 RECEIVED—
Mar 24, 2020REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Mar 24, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 18, 2015TMBNTTAB RELEASE CASE TO TRADEMARKS—
Feb 18, 2015OP.TOPPOSITION TERMINATED NO. 999999—
Feb 18, 2015OP.DOPPOSITION DISMISSED NO. 999999—
Sep 11, 2014OP.IOPPOSITION INSTITUTED NO. 999999—
Sep 11, 2014OPPFOPPOSITION PAPERS RECEIVED AT TTAB—
Aug 12, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 12, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 23, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 9, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 9, 2014ALIEASSIGNED TO LIE—
Jun 19, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 7, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 6, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 6, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 7, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 7, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 7, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 31, 2014DOCKASSIGNED TO EXAMINER—
Jan 23, 2014MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jan 22, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 2, 2014NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance