USPTO serial 86159339
NS-SSB
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Sep 22, 2015
- Examiner
- KHAN, AHSEN M
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with NS-SSB?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD.
Shinagawa-ku, Tokyo, JP
Other trademarks owned by NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD.
NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD.
Shinagawa-ku, Tokyo, JP
Other trademarks owned by NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD.
NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD.
Shinagawa-ku, Tokyo, JP
Other trademarks owned by NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD.
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Marsha K. Hoover
MARSHA K. HOOVER MARSHALL, GERSTEIN & BORUN LLP233 S WACKER DR STE 6300CHICAGO, IL 60606-6471UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal materials and hardware for building and construction, namely, reinforcing materials of metal for building, brackets of metal for building, ceiling, wall, and floor boards and slabs of metal for building, composite panels composed primarily of metal, framework of metal for building, sheet piles of metal, props of metal being metal beams, metal posts, metal trellises, metal soffits and pipes, metal piles, metal cladding for building, metal linings for building, metal tiles, metal doors, metal windows, metal window frames, metal manhole covers, metal gates, and metal materials for railway construction; Metal hardware, namely, metal rivets, metal cramps, metal nails, metal screws, metal bolts, and metal ring-shaped fittings; Metal materials and hardware for building and construction for use as quake resistant or vibration damping materials, namely, seismic isolators primarily made of metal used in construction projects for buildings, bridges, and other manmade structures to help protect the structures from damages induced by seismic activities, wind, water, traffic, machines, and other vibration-causing objects and events in the nature of metal guide bearings used to accommodate relative movement of buildings and braces; dampers to control vibrations induced by seismic activities, wind, water, traffic, machines, and other vibration-causing objects and events, primarily made of metal in the nature of metal vibration dampers in the nature of braces; structural component and replacement parts for bearings and dampers, namely, metal concave plates, metal sliding plates, and metal shock transmission units in the nature of supports; Iron and steel; Nonferrous metals and their alloys; Ores of metal; Metal flanges | SECTION 8 - CANCELLED | — |
| 019 | Ceramic building materials, bricks, and refractory products, namely, ceramic blocks, bricks, posts, piles, slabs, and panels; Concrete building materials, namely, concrete blocks, bricks, posts, piles, slabs, and panels; Cement and its products, namely, cement, cement posts and slabs, and cement mortar slates; Wooden building materials, namely, wooden posts, piles, slabs, and panels; Plastic building materials, namely, wallboards, floorboards, door casings, door frames, and door panels of carbon fiber plastics and plastics, fences of carbon fiber plastics and plastics, and plastic tiles; Synthetic building materials, namely, wallboards, floorboards, door casings, door frames, and door panels of synthetic materials; Rubber building or construction materials, namely, seismic isolators primarily made of rubber used in construction projects for buildings, bridges, and other manmade structures to help protect the structures from damages induced by seismic activities, wind, water, traffic, machines, and other vibration-causing objects and events in the nature of rubber guide bearings used to accommodate relative movement of buildings; Rockslide retention nets of textiles; Building materials made of synthetic resin, namely, wallboards, floorboards, door casings, door frames, door panels, and fences; Non-metal materials and hardware for building and construction for use as quake resistant or vibration damping materials, namely, seismic isolators primarily made of non-metal materials used in construction projects for buildings, bridges, and other manmade structures to help protect the structures from damages induced by seismic activities, wind, water, traffic, machines, and other vibration-causing objects and events and dampers to control vibrations induced by seismic activities, wind, water, traffic, machines, and other vibration-causing objects and events, primarily made of non-metal materials in the nature of guide bearings used to accommodate relative movement of buildings and braces; Non-metallic minerals for building or construction; Non-metal prefabricated building kits consisting primarily of ceiling and flooring panels, wall boards, flooring materials, and ceiling and flooring boards; Non-metal joinery fittings | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD.
- Other trademarks owned by NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD.
- Other trademarks owned by NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD.
- Other trademarks in Class 006
- Other trademarks in Class 019
- Similar marks named NS-SSB
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 1, 2022 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Sep 22, 2020 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Sep 22, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 18, 2015 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| Aug 18, 2015 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jul 13, 2015 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Jul 13, 2015 | D1BR | TEAS DELETE 1(B) BASIS RECEIVED | — |
| May 12, 2015 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Mar 17, 2015 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 17, 2015 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 25, 2015 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 12, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 10, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 9, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 9, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 2, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 11, 2014 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 11, 2014 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 11, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 25, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 25, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 25, 2014 | ALIE | ASSIGNED TO LIE | — |
| Sep 24, 2014 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 8, 2014 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 8, 2014 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 8, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 8, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 18, 2014 | MPMK | NOTICE OF PSEUDO MARK E-MAILED | — |
| Jan 17, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 10, 2014 | NWAP | NEW APPLICATION ENTERED | — |