Drawing for EUTRO LOG ROBOTICS · LOGISTICS · AUTOMATION

USPTO serial 86181537

EUTRO LOG ROBOTICS · LOGISTICS · AUTOMATION

Reviewed by CopyMark Law Group

Reg. 4741780Status 710
Filing date
Status date
Registration date
May 26, 2015
Examiner
FRAZIER, TAMARA G
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with EUTRO LOG ROBOTICS · LOGISTICS · AUTOMATION?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey M. Furr

JEFFREY M. FURR FURR LAW FIRM2622 DEBOLT RDUTICA, OH 43080-9604UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Industrial electric hammers; manipulators for forging presses and for forging machines; Casings for industrial machines; Machines for hoisting; lifting installations for the transport of persons and goods; hydraulic lift tables; Lifting apparatus in the nature of power-operated lifting and moving equipment, namely, pipe layers, fork lifts, telehandlers, and lifts; Mobile platforms, namely, elevating or lifting work platforms; Stands for lifting machines; Automatic conveyor installations; Derricks; Machines for loading; Case loading machines; Automated machines for loading materials; Load carrying machines; Assembly line conveyor machinery; Industrial robots for use in the mounting of workpieces to be worked on; Robotic handling apparatus, namely, robotic arms for industrial purposes; Cargo handling machines; Modular machine tools for elevating and lifting work platforms; Truck cranes; Moving and handling equipment, namely, power-operated lifting and moving equipment, namely, pipe layers, fork lifts, telehandlers, and lifts; Opening and closing mechanisms in the nature of electric door opening and closing system; machines in the nature of reciprocating feeders; Front end loaders; Envelope-inserting machines; Pallet transferring machines; Tray handling machines; Stacking machines other than fork-lift trucks; rollers conveyors being components of packaging line machines; industrial robots for feeding workpieces; industrial robots for transferring workpieces; powered metal loading rampsSECTION 8 - CANCELLED—
009Electric switchgears; electronic load indicators; Factory automation software, namely, software to integrate manufacturing machine operations, track problems and generate production reports; Integrated software packages for use in the automation of laboratories; computer programs for managing installations and machines used for moving and warehousing purposes; Software for managing installations and machines used for moving and warehousing purposes; Electronic circuits; Integrated electronic circuits; Calculators; Safety, security, protection and signalling devices, namely, electric sensors used to indicate the working of a machine; Robotic handling apparatus, namely, robotic arms for laboratory purposesSECTION 8 - CANCELLED—
037Installation of industrial plant processes, namely, robots and machines for automating processes and moving goods; Installation of storage facility windows; Installation of electrical and generating machinery; Computer hardware and telecommunication apparatus installation, maintenance and repair; Installation, repair and maintenance of condensing apparatus; Installation of computer systems in the nature of hardware and peripheralsSECTION 8 - CANCELLED—
042Research relating to the computerised automation of industrial processes; Research relating to the computerised automation of technical processes; Design and development of industrial machinery; Science and technological services, namely, scientific research, analysis, and testing in the field of robotics; Quality management services, namely, quality evaluation and analysis, quality assurance and quality control in the field of robotic apparatus and automated machines; Technical verification of power systems designs; Testing, analysis, and evaluation of industrial process to assure compliance with the computer industry standards; Engineering design services; Industrial design services; IT consulting services; Engineering services; Conducting industrial tests; industrial process testing and industrial product testing; Technological consultation in the technology field of computer hardware; Scientific and technological services, namely, research and design in the field of computer hardware; Research and development in the field of computer software; Research and consultancy services relating to computer hardware; Technical support services, namely, troubleshooting in the nature of diagnosing computer hardware and software problems; Design and development of computer hardware and software; Installation, maintenance and repair of software for computer systemsSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 3, 2021C8..CANCELLED SEC. 8 (6-YR)—
May 26, 2020REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
May 25, 2016ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Apr 4, 2016TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 26, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 10, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 10, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 18, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 2, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 2, 2015ALIEASSIGNED TO LIE—
Jan 12, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 12, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 12, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 12, 2014ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Aug 17, 2014GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Aug 17, 2014GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 17, 2014CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 25, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 25, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 25, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 14, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 14, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 14, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 8, 2014PARITEAS VOLUNTARY AMENDMENT RECEIVED—
May 6, 2014DOCKASSIGNED TO EXAMINER—
Feb 13, 2014MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Feb 12, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 4, 2014NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance