USPTO serial 86186587
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $425
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
William Bak
William Bak Howson & Howson LLPFive Sentry East, Suite 160325 Sentry Parkway EastBlue Bell, PA 19422| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Electric components, namely, resistors and resistor networks, low value resistors, shunt resistors, foil resistors, current sensors, potentiometers, trimmer potentiometers, capacity sensors, inductor sensors, volume control sensors, inclinometer sensors, MEMS (microelectromechanical system) sensors, vibrating wire sensors, electrical resistance strain gauges, strain gauge transducers, load cells, pressure sensors, accelerators, sensors, stress analysis systems, strain gauge instrumentations, computer software for use in weighing systems and processes control, computer software for use in stress analysis; load cell modules that include electronic instrumentation and systems used for process control, for weighing and sorting, and for process control using transducers; strain gauge instrumentation, reflection polariscopes and photo elastic plastics in the nature of strain sensitive plastics for measuring strains on surfaces of materials for optical measurement and analysis of stresses and strains; strain gauge calibration equipment; strain gauge installation testers; accessories used for surface preparation and installation of electrical resistance strain gauges and bondable resistors, namely, soldering and welding equipment, namely, portable electric powered strain gauge welding and soldering apparatus, bondable electronic terminals, electric bridge completion modules, namely, gauge installation testers, for verifying the electrical quality of strain gauge installation; junction boxes; lift truck scales; force measurement, weight, web tension and strip tension digital indicators and sensors; digital I/O boards, namely, computer interface boards; web tension and strip systems consisting primarily of data transmitters, electronic controllers, programmable logic controllers (PLC), sensors, remotes indicators, and electronic displays for displaying measurement data and terminals for entering data; force measurement systems consisting primarily of data transmitters, electronic controllers, programmable logic controller (PLC), sensors, remotes indicators, load cells, and electronic displays for displaying measurement data and terminal for entering data; electro hydraulic positioning systems consisting primarily of servo controllers, programmable logic controller (PLC), hydraulic servo controls, signal conditioners, control valves and transducers, and micro-processor based hardware and software used to provide real-time communication of industrial processes; aircraft and vehicle scales and weighing equipment and systems overload and on-board weighing equipment and systems, namely, electronic controllers, and electronic displays for displaying measurement data and terminals for entering data, weighing systems consisting primarily of weighing scales, load cells, digital readout devices, weighing platforms and scales, and structural parts thereof; overload and on-board weighing equipment and systems, namely, electronic controllers, and electronic displays for displaying measurement data and terminals for entering data, weighing systems consisting primarily of weighing scales, load cells, digital readout devices, weighing platforms and scales, and structural parts thereof; strain indicators, namely, digital readout devices; data acquisition conditioners comprised of electronic sensors which detect various physical parameters and convert the physical parameters to electrical signals concerning equipment performance, and electronic signal conditioning circuits to convert analog waveforms into digital values for processing in the field of equipment performance; electronic measurement and sensor equipment and systems for use in rolling mills, paper mills and mining in the nature of detectors, scanners, gauges, sensors, and meters for industrial purposes, namely, metal detectors, hot metal detectors, opto-electronic gauges in the nature of displacement transducers and fluid pressure transducers, tension meters, and computer software and hardware for controlling actuation of a shear blade used in a steel rolling mill | ACTIVE | Jan 1, 2020 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 22, 2026 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Sep 22, 2025 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Sep 22, 2020 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 14, 2020 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Sep 14, 2020 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Sep 14, 2020 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 14, 2020 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Sep 14, 2020 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Aug 21, 2020 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Aug 20, 2020 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Aug 7, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 6, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 6, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 25, 2020 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Feb 6, 2020 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 6, 2020 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 6, 2020 | CNRT | SU - NON-FINAL ACTION - WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 29, 2020 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Jan 24, 2020 | IUAF | USE AMENDMENT FILED | — |
| Jan 24, 2020 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Aug 2, 2019 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 1, 2019 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Jul 29, 2019 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jul 24, 2019 | EXT5 | SOU EXTENSION 5 FILED | — |
| Jul 24, 2019 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 26, 2019 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 24, 2019 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Jan 24, 2019 | EXT4 | SOU EXTENSION 4 FILED | — |
| Jan 24, 2019 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 26, 2018 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 24, 2018 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Jul 24, 2018 | EXT3 | SOU EXTENSION 3 FILED | — |
| Jul 24, 2018 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 24, 2018 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 26, 2018 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 24, 2018 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Jan 24, 2018 | EXT2 | SOU EXTENSION 2 FILED | — |
| Jan 24, 2018 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 26, 2017 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 24, 2017 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jul 24, 2017 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jul 24, 2017 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 24, 2017 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Nov 29, 2016 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 29, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 9, 2016 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 21, 2016 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Oct 14, 2016 | EXPT | EXPARTE APPEAL TERMINATED | — |
| Oct 13, 2016 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 22, 2016 | DMCC | DATA MODIFICATION COMPLETED | — |
| Sep 20, 2016 | DMCC | DATA MODIFICATION COMPLETED | — |
| Aug 8, 2016 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| Jun 6, 2016 | GEA1 | NOTIFICATION OF ACTION DENYING REQ FOR RECON E-MAILED | — |
| Jun 6, 2016 | GECD | ACTION DENYING REQ FOR RECON E-MAILED | — |
| Jun 6, 2016 | CNCF | ACTION CONTINUING FINAL - COMPLETED | — |
| May 14, 2016 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| May 7, 2015 | DMCC | DATA MODIFICATION COMPLETED | — |
| May 6, 2015 | GEA1 | NOTIFICATION OF ACTION DENYING REQ FOR RECON E-MAILED | — |
| May 6, 2015 | GECD | ACTION DENYING REQ FOR RECON E-MAILED | — |
| May 6, 2015 | CNCF | ACTION CONTINUING FINAL - COMPLETED | — |
| May 4, 2015 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| May 4, 2015 | EXPI | EX PARTE APPEAL-INSTITUTED | — |
| May 4, 2015 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| May 4, 2015 | EXAF | EXPARTE APPEAL RECEIVED AT TTAB | — |
| Nov 4, 2014 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Nov 4, 2014 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 4, 2014 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 31, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 31, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 24, 2014 | ALIE | ASSIGNED TO LIE | — |
| Oct 21, 2014 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 21, 2014 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 21, 2014 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 21, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 21, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 20, 2014 | MPMK | NOTICE OF PSEUDO MARK E-MAILED | — |
| Feb 19, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 10, 2014 | NWAP | NEW APPLICATION ENTERED | — |