Drawing for PERFECT POWER INSTITUTE

USPTO serial 86206975

PERFECT POWER INSTITUTE

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
Examiner
CRAWFORD, MARY
Law office
TMEG LAW OFFICE 102 - EXAMINING ATTORNEY ASSIGNED

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with PERFECT POWER INSTITUTE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
041Education services, namely, providing courses, classes, webinars, tools and materials for teaching professionals in the field of achieving a standard level of performance in terms of electricity sustainability including: reliability, power, quality, safety, energy efficiency, environment, cost efficiency, and customer engagementACTIVENov 9, 2011
042Accreditation services, namely, developing and administering standards and procedures for certifying professionals in the field of achieving a standard level of performance in terms of defining sustainable power/electricity to facilities including: reliability, power, quality, safety, energy efficiency, environment, cost efficiency, and customer engagement; Accreditation services, namely, developing, evaluating, and testing standards for professional and project certification and achieving a standard level of sustainable performance in terms of electricity to facilities including: reliability, power, quality, safety, energy efficiency, environment, cost efficiency, and customer engagement for the purpose of accreditation; Accreditation services, namely, setting and providing standards for professionals and projects in achieving a standard level of performance in terms of electricity sustainability including: reliability, power, quality, safety, energy efficiency, environment, cost efficiency, and consumer empowerment for the purpose of accreditation; Consulting in the field of designing and development of electrical services and renewable energy resources for local governments; Consulting in the field of engineering; Consulting services in the fields of energy measurement to improve energy efficiency; Engineering services in the field of energy efficiency; Engineering services in the field of electricity production, delivery, quality and thermal energy recovery and distribution; Metering and monitoring electric power consumption by third parties for electric power providers; Providing quality assurance services in the field of electric power, efficiency, electricity sustainability including: reliability, power, quality, safety, energy efficiency, environment, cost efficiency, and customer engagement; Providing scientific information in the field of electric power, efficiency, consumer demand for electricity including: reliability, power, quality, safety, energy efficiency, environment, cost efficiency, and customer engagement; Research and development in the field of electric power, efficiency, consumer demand for electricity including: reliability, power, quality, safety, energy efficiency, environment, cost efficiency, and customer engagement; Scientific research consulting in the field of achieving a standard level of performance in terms of defining sustainable power/electricity to facilities including: reliability, power, quality, safety, energy efficiency, environment, cost efficiency, and customer engagement; Technological planning and consulting services in the field of achieving a standard level of performance in terms of electricity sustainability including reliability, power, quality, safety, energy efficiency, environment, cost efficiency, and customer engagementACTIVENov 9, 2011

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB2): The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.

DateCodeEventWhat it means
Jan 5, 2015MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jan 5, 2015ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Dec 3, 2014ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
Dec 2, 2014ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 2, 2014REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Jun 9, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 9, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 9, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 2, 2014DOCKASSIGNED TO EXAMINER
Mar 14, 2014MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED
Mar 13, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Mar 4, 2014NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance