Drawing for TOTTY CONSTRUCTION

USPTO serial 86216706

TOTTY CONSTRUCTION

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
COWARD, KATHRYN E
Law office
TMO LAW OFFICE 115 - EXAMINING ATTORNEY ASSIGNED

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with TOTTY CONSTRUCTION?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
037Building construction; Building construction and repair; Building construction information; Building construction services; Building construction supervision; Building construction, remodeling and repair; Building inspection; Charitable services, namely, renovating and constructing homes for low income families; Constructing decks; Constructing porches; Constructing sunrooms; Construction and installation of masonry walls and structures; Construction and renovation of buildings; Construction and repair of buildings; Construction and repair of movie and theatrical sets and scenery; Construction consultancy; Construction consultation; Construction dewatering, namely, the removal of surface waters and groundwater to facilitate the construction of structures and pipelines; Construction grading services; Construction management; Construction of airports; Construction of aquatics facilities; Construction of buildings; Construction of medical establishments; Construction of modular buildings; Construction of modular homes; Construction of roads, underground utilities, and housing pads; Construction project management services; Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; Construction services, namely, planning, laying out and construction of a planned residential community; Construction services, namely, planning, laying out and construction of residential and commercial communities; Construction services, namely, planning, laying out and custom construction of commercial buildings; Construction services, namely, planning, laying out and custom construction of residential and commercial communities; Construction supervision; Construction, maintenance and renovation of property; Consultation in building construction supervision; Consultation in the field of construction and building of horse-riding arenas; Consulting in the field of building construction; Consulting in the field of hospital construction; Consulting services for the construction and installation of masonry walls and structures; Custom construction and building renovation; Custom construction of homes; General building contractor services; General construction contracting; General contracting services in the field of flooring; General contractor services, namely, plumbing, heating and air conditioning, carpentry, drywall, painting, electrical, building and framing contractor services; Housing services, namely, development of real property, namely, repair, improvement, and new construction; Housing services, namely, repair, improvement, and construction of residential real property; Information concerning rental of equipment for constructions and buildings; Installation of electrical and generating machinery; Residential and building construction consulting; Residential and commercial building construction; Steel structure construction works; Warehouse construction and repairACTIVEJan 19, 1998

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB2): The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.

DateCodeEventWhat it means
Jan 26, 2015MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jan 26, 2015ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jun 13, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 13, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 13, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 13, 2014DOCKASSIGNED TO EXAMINER—
Mar 22, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 13, 2014NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance